Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Occurring in more than one District (excluding Forestwide) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Eagle River-Florence Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Great Divide Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Lakewood-Laona Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Medford-Park Falls Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Washburn Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/08/2020 Est. DEIS NOA in Federal Register 02/2022 |
Expected:06/2022 |
07/2022 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2022 Special Use Permits - Batch 1 CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 09/2022 |
Kelly Scarbrough 715-362-1314 Kelly.Scarbrough@usda.gov |
Description: The Forest is proposing to authorize requests for 12 special use permits on Forest Service Lands. Eight of the twelve requests are renewals. Seven requests are for roads, three for dry fire hydrants and two for cultivation of hay.
Web Link: http://www.fs.usda.gov/project/?project=62457 |
|||||
Location: UNIT - Chequamegon / Nicolet National Forest All Units. STATE - Wisconsin. COUNTY - Bayfield, Florence, Forest, Oconto, Price, Taylor. LEGAL - Not Applicable. Across all districts on Chequamegon Nicolet National Forest. | |||||
Acquired Properties and Inactive Well Decommissioning CE *NEW LISTING* |
- Recreation management - Facility management |
In Progress: Scoping Start 04/26/2022 |
Expected:10/2022 |
11/2022 |
Sarah Holmes 715-373-2667 x 5261 sarah.holmes@usda.gov |
Description: Proposal to decommission seven inactive wells at recreation sites and the disposal of buildings and improvements at six acquired properties. Policy and State law require proper abandonment of wells when inactive. The properties are in poor condition.
Web Link: http://www.fs.usda.gov/project/?project=62091 |
|||||
Location: UNIT - Chequamegon / Nicolet National Forest All Units. STATE - Wisconsin. COUNTY - Bayfield, Florence, Forest, Oconto, Oneida, Price, Taylor, Vilas. LEGAL - Not Applicable. Various locations on four districts across the forest. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Occurring in more than one District (excluding Forestwide) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2022 Forest Wide Watershed Improvement Project CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management |
Completed | Actual: 05/12/2022 | 05/2022 |
Jennifer Maziasz 616-581-5756 jennifer.maziasz@usda.gov |
Description: Proposal to replace 23 aging stream crossing structures within the Forest Service road and trail systems. Two of the sites are replacements or rehabilitation of road bridges. The other 21 sites are replacements of culverts.
Web Link: http://www.fs.usda.gov/project/?project=61287 |
|||||
Location: UNIT - Eagle River-Florence Ranger District, Lakewood-Laona Ranger District, Washburn Ranger District, Medford-Park Falls Ranger District, Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland, Bayfield, Florence, Forest, Oconto, Price, Sawyer, Taylor, Vilas. LEGAL - Not Applicable. 23 locations across the National Forest. | |||||
Krawze Land Exchange CE |
- Land acquisition | On Hold | N/A | N/A |
Mary Scheuerman 715-362-1331 mary.scheuerman@usda.gov |
Description: Exchanging land on the east side of the forest. Lakewood-Laona Ranger District in Forest County would be exchanging land for land in Eagle River-Florence Ranger District.
Web Link: http://www.fs.usda.gov/project/?project=59900 |
|||||
Location: UNIT - Eagle River-Florence Ranger District, Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Florence, Forest. LEGAL - Not Applicable. East side of the forest in Forest and Florence Counties. | |||||
North Country Trail Dispersed Campsite Development and Improvements CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 04/12/2019 |
Expected:09/2022 |
10/2022 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: Eight to 10 backpacker campsites would be developed or improved to provide long-distance hikers a consistent experience when they hike the North Country Trail in Wisconsin.
Web Link: http://www.fs.usda.gov/project/?project=55297 |
|||||
Location: UNIT - Washburn Ranger District, Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland, Bayfield. LEGAL - Not Applicable. Multiple sites along the North Country Trail in Great Divide and Washburn Ranger Districts. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Eagle River-Florence Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2021 Brule Controlled Burn CE CE *UPDATED* |
- Wildlife, Fish, Rare plants - Fuels management |
Completed | Actual: 04/21/2022 | 05/2022 |
Steven Janke 715-276-6333 x4229 steve.janke@usda.gov |
Description: To maintain a wildlife opening by the Brule River and extend fire boundaries to the Brule River to act as a natural fire line instead of creating dozer dug control lines. Using the Brule River as a fire control line will better protect firefighters.
Web Link: http://www.fs.usda.gov/project/?project=59328 |
|||||
Location: UNIT - Eagle River-Florence Ranger District. STATE - Wisconsin. COUNTY - Florence. LEGAL - Not Applicable. The maintenance of a large wildlife openings at the Brule River Opening (T41NR15E, Section 24 and T41NR16E Section 19). The area is a remnant farm field near the Brule River in Florence County, Wi. | |||||
2022 Spectrum Mid-America LLC SUP CE *UPDATED* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2022 |
Expected:08/2022 | 08/2022 |
Mary Sullivan 530-478-6254 ext 247 mary.sullivan2@usda.gov |
Description: Issue a new special use permit to Spectrum Mid-America LLC for installing 2' fiber optic cable and 30 "flush ground vaults".
Web Link: http://www.fs.usda.gov/project/?project=61588 |
|||||
Location: UNIT - Eagle River-Florence Ranger District. STATE - Wisconsin. COUNTY - Vilas. LEGAL - Not Applicable. Project is listed along Military Road. | |||||
Aspen-Spruce-Fir Restoration Project EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 12/17/2020 Est. Comment Period Public Notice 07/2022 |
Expected:10/2022 |
10/2022 |
Chad Kirschbaum 715-479-2827 chad.kirschbaum@usda.gov |
Description: The Aspen-Spruce-Fir Restoration Project (ASFR) proposes to treat pockets and areas of dead, dying, diseased, and other hazard trees across the entire ERFL district. Up to 9,200 acres are proposed for active management actions.
Web Link: http://www.fs.usda.gov/project/?project=59159 |
|||||
Location: UNIT - Eagle River-Florence Ranger District. STATE - Wisconsin. COUNTY - Florence, Forest, Oneida, Vilas. LEGAL - Not Applicable. Spread across the entire Eagle River-Florence Ranger District. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Great Divide Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Chequamegon Area Mountain Bike Association Trail Maintenance, Rehabilitation and Reroutes CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 01/05/2022 |
Expected:08/2022 |
09/2022 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: Restore trails in the Namakagon Cluster of the CAMBA mountain bike trail system to the sustainable standards to which they were originally constructed and reroute some sections from timber sale haul routes to single-track routes.
Web Link: http://www.fs.usda.gov/project/?project=61353 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Forest. LEGAL - Not Applicable. CAMBA Mountain Bike Trail System - Namakagon Cluster. | |||||
Decommissioning and Reuse of Properties on Mineral Lake and West Fork of the Chippewa River CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 02/15/2022 |
Expected:08/2022 |
09/2022 |
Eric Lynch 715-762-5137 eric.lynch@usda.gov |
Description: Two properties, one on Mineral Lake and one on the West Fork of the Chippewa River, have buildings that need to be decommissioned. Recreational improvements are also proposed.
Web Link: http://www.fs.usda.gov/project/?project=61642 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland, Sawyer. LEGAL - Not Applicable. One property is located north of Mineral Lake. The other is located just west of Clam Lake. | |||||
Forest Lodge Nature Trail Trailhead Parking Area and Traffic Circulation CE *UPDATED* |
- Watershed management - Facility management |
In Progress: Scoping Start 05/28/2021 |
Expected:11/2022 |
12/2022 |
Debra Proctor 715-580-0412 debra.proctor@usda.gov |
Description: Improve Forest Lodge road and trail infrastructure to accommodate increased use of Forest Lodge and the Nature Trail - parking, road and trail capacity, drainage, stormwater treatment, traffic sight lines within the complex and ingress and egress.
Web Link: http://www.fs.usda.gov/project/?project=58868 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Forest Lodge is located about eight miles east of Cable, Wisconsin. | |||||
Forest Road 164 Reconstruction EA *UPDATED* |
- Road management |
In Progress: Scoping Start 01/31/2022 Est. Comment Period Public Notice 06/2022 |
Expected:11/2022 |
12/2022 |
Eric Lynch 715-762-5137 eric.lynch@usda.gov |
Description: The 11.6-mile-long project area will be cleared and grubbed within 16 feet of the road centerline or as needed to create ditching. All cross-drain culverts will be replaced with polymer coated arch pipes. The entire road length will be resurfaced.
Web Link: http://www.fs.usda.gov/project/?project=61289 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Forest Road 164 between County Highway GG and Forest Road 163. | |||||
Landscape Management in the Moose Two Axe Project Area EA |
- Wildlife, Fish, Rare plants - Forest products - Fuels management - Watershed management - Road management |
In Progress: Scoping Start 03/08/2022 Est. Comment Period Public Notice 01/2023 |
Expected:04/2023 |
05/2023 |
Nicole Molitor 715-638-0272 nicole.g.molitor@usda.gov |
Description: Vegetation treatment to improve health, productivity, and resiliency of northern hardwood, spruce, pine balsam fir, birch, and aspen stands. Wildlife, fisheries, and rare plant habitat management. Fuels treatments. Road network improvements.
Web Link: http://www.fs.usda.gov/project/?project=61327 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Southwest portion of the Great Divide Ranger District. | |||||
Northern States Power Xcel Energy Special Use Permit Amendment 2022 CE *UPDATED* |
- Special use management | Completed | Actual: 04/08/2022 | 04/2022 |
Kelly Scarbrough 715-362-1314 Kelly.Scarbrough@usda.gov |
Description: The utility right of way in northeast corner of the Great Divide Ranger District will be changed from 25 feet wide to 50 feet wide.
Web Link: http://www.fs.usda.gov/project/?project=61569 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Northeast corner of the Great Divide Ranger District. | |||||
Snowmobile Trail 21 Reconstruction CE *UPDATED* |
- Recreation management | Completed | Actual: 04/01/2022 | 04/2022 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: The Sawyer County Snowmobile Alliance has submitted a proposal to reconstruct the trail on steep hills on a 0.5-mile segment of snowmobile trail.
Web Link: http://www.fs.usda.gov/project/?project=61567 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Half-mile section of Trail 21 from Forest Road 622 going east to the intersection with Trail 3. | |||||
Veikko Cross-Country Trail Improvement and Development CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 08/2022 |
Expected:10/2022 | 12/2022 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: The Veikko Trail, an old cross-country ski trail in the St. Peter's Dome area developed by a local ski group, will be improved and realigned to fix drainage issues. Additional trail will be developed to connect to the St. Peter's Dome Trail network.
Web Link: http://www.fs.usda.gov/project/?project=58459 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Forest. LEGAL - Not Applicable. St. Peter's Dome area. | |||||
Xcel Powerline Installation Main Street Hayward, Wisconsin CE *UPDATED* |
- Special use management | Cancelled | N/A | N/A |
Nicole Molitor 715-634-4821, x 2327 nicole.g.molitor@usda.gov |
Description: This project has been cancelled and will be included in PALS ID# 61569 Northern States Power Xcel Energy - Special Use Permit Amendment 2022 | |||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Main Street, Hayward Wisconsin, Great Divide Ranger District Office. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Lakewood-Laona Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2022 Alliant Energy Sauls Springs Road CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 04/27/2022 |
Expected:07/2022 |
07/2022 |
Mary Sullivan 530-478-6254 ext 247 mary.sullivan2@usda.gov |
Description: The company would replace the overhead powerlines with underground lines.
Web Link: http://www.fs.usda.gov/project/?project=61896 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Langlade, Oconto. LEGAL - Not Applicable. This project is near the Oconto Seed Orchard. | |||||
2022 Wisconsin Public Service Special Use Permit CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 04/13/2022 |
Expected:07/2022 |
07/2022 |
Mary Sullivan 530-478-6254 ext 247 mary.sullivan2@usda.gov |
Description: Wisconsin Public Service would be installing two new underground electrical lines and other facilities.
Web Link: http://www.fs.usda.gov/project/?project=61596 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Forest, Langlade. LEGAL - Not Applicable. Project actions are scattered though out the Lakewood-Laona Ranger District. | |||||
Jones Springs Project EA *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 08/2022 |
Expected:08/2023 | 08/2023 |
Evan Miller 715-674-4481 evanmiller@fs.fed.us |
Description: This recreation area was heavily impacted by the 2019 blowdown. This project is reviewing the recreation opportunities in the area to see if any changes are needed.
Web Link: http://www.fs.usda.gov/project/?project=59902 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Langlade, Oconto. LEGAL - Not Applicable. The Jones Springs area, legal T33N, R14 and R15E; T32N, R14 and 15 E. | |||||
Lakewood-Laona Plantation III EA |
- Forest products | On Hold | N/A | N/A |
Benjamin Walker 715-276-6333 benjamin.walker@usda.gov |
Description: Lakewood-Laona Ranger District is planning on thinning red pine plantation across the district.
Web Link: http://www.fs.usda.gov/project/?project=59903 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Forest, Langlade, Oconto. LEGAL - Not Applicable. Project is located at Townships 31-37 North and Ranges 12-17 East. | |||||
Lakewood-Laona Programmatic Salvage II CE *UPDATED* |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 09/2022 |
Expected:12/2022 | 12/2022 |
John Lampereur 715-276-6333 jlampereur@fs.fed.us |
Description: This project would salvage timber on the district under certain criteria and design features. Each site will have a specialist review.
Web Link: http://www.fs.usda.gov/project/?project=59925 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Forest, Langlade, Oconto. LEGAL - Not Applicable. Lakewood-Laona Ranger District. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Medford-Park Falls Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2021 Clark Electric Underground Utility Line Installation CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 11/02/2021 |
Expected:07/2022 |
07/2022 |
Kelly Scarbrough 715-362-1314 kelly.scarbrough@usda.gov |
Description: Clark Electric Cooperative proposes to install and bury approximately 9,924 feet long of 7.2kv overhead primary distribution line along the existing ROW on the west side of Wintersports Road to replace an overhead line.
Web Link: http://www.fs.usda.gov/project/?project=61036 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Taylor. LEGAL - Not Applicable. T31N, R2W, Sections 17, 20 and 29. | |||||
2021 Price Electric Underground Cable Installation CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 11/02/2021 |
Expected:07/2022 |
07/2022 |
Kelly Scarbrough 715-362-1314 Kelly.Scarbrough@usda.gov |
Description: Price Electric Cooperative is proposing to install primary underground electric cable and facilities within Vilas County, WI of the Medford-Park Falls Ranger District for access by a land-locked private property.
Web Link: http://www.fs.usda.gov/project/?project=61035 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Vilas. LEGAL - Not Applicable. T40N, R4E, Sections 18 & 19. | |||||
2022 Camp 4 and Newman Creek Gravel Bar Removal CE *UPDATED* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 06/02/2022 |
Expected:08/2022 |
08/2022 |
Ann Dassow 715-748-4875 ext.24 ann.dassow@usda.gov |
Description: Restoration of the stream channel on Newman and Camp 4 Creeks through the lowering of gravel bars. This will improve and support native Brook Trout habitat and populations.
Web Link: http://www.fs.usda.gov/project/?project=61606 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - Not Applicable. T40N R2E Section 14 and 23, Township of Eisenstein, Price County, WI, Newman and Camp 4 Creek South of FR 182, directly off 1175A and 1175AA. | |||||
2022 MPF Pollinator Openings CE *NEW LISTING* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 06/02/2022 |
Expected:08/2022 |
08/2022 |
Ann Dassow 715-748-4875 ext.24 ann.dassow@usda.gov |
Description: The purpose of the project is to diversify existing vegetation with native plant species for the purposes of preventing non-native invasive species from establishing on the landscape and to enhance habitat for native pollinator species.
Web Link: http://www.fs.usda.gov/project/?project=62240 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - : Site 1: T38N R1E section 13 SWQ, Site 2: T40N R2E section 24 NEQ, Site 3: T38N R4E section 11 NWQ. Site 1: Hoffman: Adjacent to the Hoffman Creek Flowage. Located at the end of FR550. Site 2: Buffalo Farms: Adjacent to FR144. Site 3: Willow Springs: South of FR 130 and west of the Willow River. Adjacent to FR130D/B. | |||||
John's Creek Gravel Pit Expansion EA |
- Minerals and Geology | On Hold | N/A | N/A |
Jennifer Maziasz 616-581-5756 jennifer.maziasz@usda.gov |
Description: This project consists of expansion of an existing gravel pit to meet road construction, re-construction, and maintenance needs in the project vicinity. This is an existing pit that has an additional source of gravel that has not been developed.
Web Link: http://www.fs.usda.gov/project/?project=54736 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Taylor. LEGAL - Not Applicable. Town of Grover, Township 31 North, Range 2 West, Section 7, Taylor County, Wisconsin. | |||||
Kidrick Vegetation Management EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Road management |
In Progress: Scoping Start 04/27/2022 Est. Comment Period Public Notice 07/2022 |
Expected:12/2022 |
12/2022 |
Matthew Monahan 715-762-2461 Ext. 5125 matthew.monahan@usda.gov |
Description: This project is primarily a vegetation management project with focus on mid to late successional hardwood forest. Primary purpose is to maintain forest health and diversity. Project will also include a transportation analysis.
Web Link: http://www.fs.usda.gov/project/?project=50889 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - Not Applicable. Project is located in the northwest portion of the Forest within Taylor County in T32N, R2-3W and T33N, R1-3W. | |||||
Norvado Fiber Optic Line Installation CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/02/2022 |
Expected:07/2022 |
07/2022 |
Kelly Scarbrough 715-362-1314 Kelly.Scarbrough@usda.gov |
Description: Chequamegon Communication Cooperative, Inc. aka Norvado proposes to install an underground fiber optic cable to improve service to rural areas within Price County Wisconsin.
Web Link: http://www.fs.usda.gov/project/?project=62239 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - T38N, R1E, sec 24, T38N, R2E, sec 19 & 20, T38N, R3E, sec 30 & 31, T37N, R3E, sec 15 & 22. T38N, R1E, sec 24, T38N, R2E, sec 19 & 20, FR 550, FR 139, and FR 506I T38N, R3E, sec 30 & 31, FR 503 and FR 131 T37N, R3E, sec 15 & 22 FR 132, FR 132UU, and FR 132RR. | |||||
Round Lake Fish Passage and Water Level Control CE |
- Watershed management | On Hold | N/A | N/A |
Matthew Monahan 715-762-2461 Ext. 5125 matthew.monahan@usda.gov |
Description: **On hold until water modelling/engineering plans are complete** The project will consist of reestablishing a two-way fish passage and reconnect the ecosystems of the Pike Lake Chain of Lakes and the South Fork Flambeau Rive
Web Link: http://www.fs.usda.gov/project/?project=55358 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - Not Applicable. T40N, R3E, Sections 23-26, Price County, WI. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Washburn Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Enbridge Energy Limited Partnership SUP CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 12/07/2016 |
Expected:09/2022 |
10/2022 |
Jennifer Maziasz 715-373-2667 comments-eastern-chequamegon-nicolet-washburn@usda.gov |
Description: The proposal is to re-issue a special use authorization for a new term for Enbridge Energy Limited Partnership's existing pipeline system, pumping station, and associated improvements.
Web Link: http://www.fs.usda.gov/project/?project=44889 |
|||||
Location: UNIT - Washburn Ranger District. STATE - Wisconsin. COUNTY - Bayfield. LEGAL - Not Applicable. Project includes 11.5 miles of existing pipeline system, the pumping station, and associated improvements on Forest Service lands north of US Highway 2. | |||||
Norvado FR 218 New Fiber Optic CE *UPDATED* |
- Special use management | Completed | Actual: 06/06/2022 | 07/2022 |
Kelly Scarbrough (715)362-1314 Kelly.Scarbrough@usda.gov |
Description: Norvado has requested an amendment to their permit to install about 1,029 feet of new fiber optic line across Forest Service land within an existing corridor. The route is near FR 218 in Drummond Township, Bayfield County, WI.
Web Link: http://www.fs.usda.gov/project/?project=61876 |
|||||
Location: UNIT - Washburn Ranger District. STATE - Wisconsin. COUNTY - Bayfield. LEGAL - Not Applicable. T. 44 N., R. 8 W., Sections 23 & 24, Town of Drummond, Bayfield County WI. About 4 miles south of Drummond. | |||||
Wildcat Motorized Trail Projects CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 06/07/2021 |
Expected:07/2022 |
07/2022 |
Sarah Holmes 715-373-2667 sarah.holmes@usda.gov |
Description: Two actions: 1)Add 4 miles of ATV/UTV use from Town of Drummond south to Lake Owen Station Road (includes trail stabilization on hills); 2) a 0.11-mile reroute (on snowmobile only portion of trail) to avoid a lowland area which is not freezing.
Web Link: http://www.fs.usda.gov/project/?project=59920 |
|||||
Location: UNIT - Washburn Ranger District. STATE - Wisconsin. COUNTY - Bayfield. LEGAL - Not Applicable. Wildcat Motorized trail south of the Town of Drummond to Lake Owen Station Road. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |