Report Contents (click to jump to a section) : - R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Occurring in more than one District (excluding Forestwide) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Barlow Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Clackamas River Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Hood River Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Mt. Hood National Forest, Zigzag Ranger District (excluding Projects occurring in more than one District) | |||||
R6 - Pacific Northwest Region, Regionwide (excluding Projects occurring in more than one Region) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Regional Aquatic Restoration Project EA *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Objection Period Legal Notice 07/13/2019 |
Expected:11/2019 |
11/2019 |
James Capurso 503-808-2847 jcapurso@fs.fed.us |
Description: The USFS is proposing a suite of aquatic restoration activities for Region 6 to address ongoing needs, all of which have completed consultation, including activities such as fish passage restoration, wood placement, and other restoration activities.
Web Link: http://www.fs.usda.gov/project/?project=53001 |
|||||
Location: UNIT - R6 - Pacific Northwest Region All Units. STATE - Oregon, Washington. COUNTY - Adams, Asotin, Benton, Chelan, Clallam, Clark, Columbia, Cowlitz, Douglas, Ferry, Franklin, Garfield, Grant, Grays Harbor, Island, Jefferson, King, Kitsap, Kittitas, Klickitat, Lewis, Lincoln, Mason, Okanogan, Pacific, Pend Oreille, Pierce, San Juan, Skagit, Skamania, Snohomish, Spokane, Stevens, Thurston, Wahkiakum, Walla Walla, Whatcom, Whitman, Yakima, Baker, Benton, Clackamas, Clatsop, Columbia, Coos, Crook, Curry, Deschutes, Douglas, Gilliam, Grant, Harney, Hood River, Jackson, Jefferson, Josephine, Klamath, Lake, Lane, Lincoln, Linn, Malheur, Marion, Morrow, Multnomah, Polk, Sherman, Tillamook, Umatilla, Union, Wallowa, Wasco, Washington, Wheeler, Yamhill. LEGAL - Not Applicable. The project will span all national forests in Region 6. | |||||
Back To Top | |||||
Mt. Hood National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Mt. Hood Wild and Scenic Rivers Planning EA *UPDATED* |
- Land management planning - Recreation management - Special area management - Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 07/25/2019 Est. Comment Period Public Notice 02/2021 |
Expected:08/2022 |
09/2022 |
Jennie O'Connor Card 406-522-2537 jennieoconnorcard@fs.fed.us |
Description: A comprehensive river management plan (CRMP) is being prepared to provide for protection of river values on nine rivers. Here is an interactive story map: https://usfs.maps.arcgis.com/home/item.html?id=ec5617f0bd47473e8893aa41eb12ff3e.
Web Link: http://www.fs.usda.gov/project/?project=54674 |
|||||
Location: UNIT - Mt. Hood National Forest All Units. STATE - Oregon. COUNTY - Clackamas, Hood River, Multnomah, Wasco. LEGAL - Not Applicable. Collawash River, Eagle Creek, East Fork Hood River, Fifteenmile Creek, Fish Creek, Middle Fork Hood River, South Fork Clackamas River, South Fork Roaring River, and Zigzag River. | |||||
Special Uses Projects for Communication Sites and Utilities CE *UPDATED* |
- Special use management | Completed | Actual: 07/09/2019 | 08/2019 |
MaryEllen Fitzgerald 503-622-3191ext 625 mfitzgerald@fs.fed.us |
Description: Replace existing communication towers at two locations: Mt. Hood Meadows and Frog Lake. There is also a proposal to install new fiber optic line along Forest Road (FR) 4631, and aerial fiber to residents along FRs 29, 31, 35, 35A and 35B.
Web Link: http://www.fs.usda.gov/project/?project=56129 |
|||||
Location: UNIT - Mt. Hood National Forest All Units. STATE - Oregon. COUNTY - Clackamas, Hood River. LEGAL - Not Applicable. Communication site projects are located at Mt. Hood Meadows, near Frog Lake at the AT&T site, and Forest Roads 29, 31, 35, and 35A/B. Fiber optic line installation is proposed along Forest Road 4631. | |||||
Special Uses Projects for Trail Construction and Reconstruction CE *UPDATED* |
- Special area management | Completed | Actual: 07/09/2019 | 08/2019 |
MaryEllen Fitzgerald 503-622-3191ext 625 mfitzgerald@fs.fed.us |
Description: Consolidation of similar proposals: Construction of new hiking trails at Mt. Hood Meadows and new cross country ski trails at Teacup Lake; and at Ski Bowl, regrading the Alpine Easy Street trail and relocating a portion of another trail.
Web Link: http://www.fs.usda.gov/project/?project=56127 |
|||||
Location: UNIT - Mt. Hood National Forest All Units. STATE - Oregon. COUNTY - Clackamas, Hood River. LEGAL - Not Applicable. Projects are proposed within the permit areas of Mt. Hood Meadows, Teacup Lake, and Ski Bowl all located on the Mt. Hood National Forest. | |||||
Special Uses: Bus Shelter, Guest Services, Snow Making, and Night Lighting CE *UPDATED* |
- Special use management | Completed | Actual: 07/09/2019 | 08/2019 |
MaryEllen Fitzgerald 503-622-3191ext 625 mfitzgerald@fs.fed.us |
Description: Proposals to develop a water containment system from defined spring sources for snow making, and construct a bus shelter at Ski Bowl; construct a temporary guest services structure at Summit Ski Area; and install night lighting at Mt. Hood Meadows.
Web Link: http://www.fs.usda.gov/project/?project=56130 |
|||||
Location: UNIT - Mt. Hood National Forest All Units. STATE - Oregon. COUNTY - Clackamas. LEGAL - Not Applicable. The activities are proposed within the special use permit boundaries for Ski Bowl, Summit, and Mt. Hood Meadows ski areas. | |||||
Back To Top | |||||
Mt. Hood National Forest, Occurring in more than one District (excluding Forestwide) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Government Camp - Cooper Spur Land Exchange EIS |
- Land ownership management | On Hold | N/A | N/A |
Michelle Lombardo 503-668-1796 mlombardo@fs.fed.us |
Description: The Forest Service would convey approximately 110 acres of property near Government Camp and acquire about 765 acres of private land near Cooper Spur. This land exchange was mandated by Congress in the Omnibus Public Land Management Act of 2009.
Web Link: http://www.fs.usda.gov/project/?project=33072 |
|||||
Location: UNIT - Zigzag Ranger District, Hood River Ranger District. STATE - Oregon. COUNTY - Clackamas, Hood River. LEGAL - Not Applicable. Government Camp, Oregon, and Cooper Spur area, Oregon. | |||||
Volcanic Monitoring Stations in the Mt. Hood Wilderness EA *UPDATED* |
- Special use management - Research and Development |
Completed | Actual: 08/15/2019 | 09/2019 |
MaryEllen Fitzgerald 503-668-1429 mfitzgerald@fs.fed.us |
Description: Four monitoring stations would be installed in Mt. Hood Wilderness. They would be assembled and maintained by U.S. Geological Survey. The data would assess volcanic activity and assist in communications regarding volcanic hazards and public safety.
Web Link: http://www.fs.usda.gov/project/?project=46254 |
|||||
Location: UNIT - Zigzag Ranger District, Hood River Ranger District. STATE - Oregon. COUNTY - Clackamas, Hood River. LEGAL - Not Applicable. Mt. Hood Wilderness. | |||||
Zayo Fiber Optic Line Installtion CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 07/22/2019 |
Expected:01/2020 |
06/2020 |
MaryEllen Fitzgerald 503-622-3191ext 625 mfitzgerald@fs.fed.us |
Description: The proposed project would authorize Zayo Group, LLC to construct, operate, and maintain approximately 14 miles of underground fiber optic conduit and cable and associated infrastructure along Forest Road 18 and other Forest roads east of Highway 35.
Web Link: http://www.fs.usda.gov/project/?project=56505 |
|||||
Location: UNIT - Barlow Ranger District, Zigzag Ranger District, Hood River Ranger District. STATE - Oregon. COUNTY - Clackamas, Hood River, Wasco. LEGAL - Not Applicable. Along Forest Road 18 (Lolo Pass Road) and other Forest Roads east of Highway 35, on the Mt. Hood National Forest. | |||||
Back To Top | |||||
Mt. Hood National Forest, Barlow Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Dog River Pipeline Replacement EA *UPDATED* |
- Special use management |
In Progress: Comment Period Public Notice 11/10/2018 |
Expected:06/2020 |
07/2020 |
Michelle Lombardo 503-668-1796 mlombardo@fs.fed.us |
Description: The existing Dog River pipeline, which is an important component of The Dalles' public drinking water supply, is deteriorating, leaking from tree damage, and exhibiting corrosion. This project proposes to replace the existing pipeline.
Web Link: http://www.fs.usda.gov/project/?project=34721 |
|||||
Location: UNIT - Barlow Ranger District. STATE - Oregon. COUNTY - Hood River, Wasco. LEGAL - T2S, R10E, Sections 2, 3, 4, 9, 10, and 11. The Dog River pipeline conveys water from the Dog River diversion dam to the south fork of Mill Creek. | |||||
Grasshopper Restoration Project EA *NEW LISTING* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 07/15/2019 Est. Comment Period Public Notice 02/2020 |
Expected:07/2020 |
08/2020 |
Ashley Popham 541-352-1255 apopham@fs.fed.us |
Description: The Grasshopper project intends to enhance and restore forest diversity; reduce risks associated with high-intensity wildfires; improve conditions for wildlife and aquatic resources; and provide timber and other forest products.
Web Link: http://www.fs.usda.gov/project/?project=56470 |
|||||
Location: UNIT - Barlow Ranger District. STATE - Oregon. COUNTY - Hood River, Wasco. LEGAL - T.3N.,R.10E.;T.3N.,R.11E.;T.4N.,R.10E..;T.4N.,R.11E.;. The planning area is south of the Badger Creek Wilderness and east of NFS Road 4880. The eastern border is near Bonney Crossing Campground. The southern border is near the Wasco/Hood River County line. | |||||
Road 44 Tree Removal CE *UPDATED* |
- Forest products - Fuels management |
Completed | Actual: 07/10/2019 | 06/2020 |
Ashley Popham 541-352-1255 apopham@fs.fed.us |
Description: This project proposes to remove dead standing and live trees in two areas along National Forest System Road 44. Approximately 90 acres would be treated to increase area resiliency against large scale mortality events, while providing forest products.
Web Link: http://www.fs.usda.gov/project/?project=55544 |
|||||
Location: UNIT - Barlow Ranger District. STATE - Oregon. COUNTY - Hood River. LEGAL - T02S R10E Sections 10, 11, 13, 14. Barlow Ranger District, along the National Forest System Road 44, from approximately Cook's Meadow to the Bottle Prairie area. | |||||
Back To Top | |||||
Mt. Hood National Forest, Clackamas River Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
North Clack Integrated Resource Project EA *UPDATED* |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Objection Period Legal Notice 08/17/2019 |
Expected:12/2019 |
02/2020 |
James Roden 541-383-4770 comments-pacificnorthwest-mthood-clackamasriver@fs.fed.us |
Description: Vegetation management and other related projects in the North Clackamas area of the Clackamas River Ranger District.
Web Link: http://www.fs.usda.gov/project/?project=50475 |
|||||
Location: UNIT - Clackamas River Ranger District. STATE - Oregon. COUNTY - Clackamas. LEGAL - Not Applicable. North Clackamas watershed. Roads 4610, 4611, 4612, 4613 and their tributaries. | |||||
Back To Top | |||||
Mt. Hood National Forest, Hood River Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Clear Branch Dam Improvements EA |
- Wildlife, Fish, Rare plants - Watershed management - Special use management |
On Hold | N/A | N/A |
Casey Gatz 541-575-3031 cgatz@fs.fed.us |
Description: This project looks to conduct dam-specific improvements as well as fisheries related improvements to support local anadromous fisheries.
Web Link: http://www.fs.usda.gov/project/?project=49138 |
|||||
Location: UNIT - Hood River Ranger District. STATE - Oregon. COUNTY - Hood River. LEGAL - Not Applicable. Laurance Lake is the reservoir constructed in 1968 by the installation of Clear Branch Dam. The project will impact the dam, reservoir, and pipes below the outlet. | |||||
Waucoma Huckleberry Enhancement EA *UPDATED* |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 07/19/2018 Est. Comment Period Public Notice 10/2019 |
Expected:03/2020 |
06/2020 |
Amber Sprinkle 503-668-1700 amber.sprinkle@usda.gov |
Description: This project proposes to improve huckleberry understory across the planning area to provide for functioning stand conditions over time that would favor long-term huckleberry production and growth.
Web Link: http://www.fs.usda.gov/project/?project=54341 |
|||||
Location: UNIT - Hood River Ranger District. STATE - Oregon. COUNTY - Hood River. LEGAL - T 2 N, R 8 E, Sections 25 and 36;%uF0B7T 2 N, R 9 E, Section 16, 17, 19, 20, 21, and 28-33;%uF0B7T 1 N, R 8 E, Section 1, 2, 11, & 12; and T 1 N, R 9 E, Section 4. The planning area is on the Mt. Hood National Forest, Hood River Ranger District. This area is bordered by the Columbia River Gorge National Scenic Area, Mark O. Hatfield Wilderness, and private land. | |||||
Back To Top | |||||
Mt. Hood National Forest, Zigzag Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Bull Run Lake Special Use Permit Renewal CE *UPDATED* |
- Special use management | Completed | Actual: 09/30/2019 | 10/2019 |
Amber Sprinkle 503-630-8812 adsprinkle@fs.fed.us |
Description: The Mt. Hood National Forest proposes to reissue the City of Portland's special use authorization for the operation, management and maintenance of the Bull Run Lake dam and reservoir for a new term of thirty years.
Web Link: http://www.fs.usda.gov/project/?project=52664 |
|||||
Location: UNIT - Zigzag Ranger District. STATE - Oregon. COUNTY - Clackamas. LEGAL - Not Applicable. Within the Bull Run Watershed Management Unit on the Mt. Hood National Forest. | |||||
Mazama Lodge Parking Area Expansion EA |
- Special use management | On Hold | N/A | N/A |
Leanne Veldhuis 503-622-2030 lveldhuis@fs.fed.us |
Description: The Mazamas are proposing to expand an existing 3-4 stall parking area located south of the Mazama Lodge on NFSR 2600530 into approximately 66 parking stalls and one bus pull-out, to mitigate a long-standing visitor safety issue.
Web Link: http://www.fs.usda.gov/project/?project=45241 |
|||||
Location: UNIT - Zigzag Ranger District. STATE - Oregon. COUNTY - Clackamas. LEGAL - T 3 S, R 8 1/2 E, Sec 24, WM. The proposed project area is located on National Forest System Road (NFSR) 2600530, just north of US Highway 26 and Oregon Highway 173. | |||||
Pucci Chairlift Replacement CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 08/30/2019 |
Expected:11/2019 |
06/2020 |
Scott Kaden 970-963-2266 scottakaden@fs.fed.us |
Description: This project proposes to replace the Pucci chairlift at the Timberline Ski Area.
Web Link: http://www.fs.usda.gov/project/?project=56594 |
|||||
Location: UNIT - Zigzag Ranger District. STATE - Oregon. COUNTY - Clackamas. LEGAL - Not Applicable. Timberline Ski Area, on the Zigzag Ranger District of the Mt. Hood National Forest. | |||||
Troutdale Air Tanker Base Conveyance CE |
- Land ownership management | On Hold | N/A | N/A |
Gianna Vaccaro 208-265-6625 gvaccaro@fs.fed.us |
Description: The area contains approximately 9.65 acres and is located at 503 NW Graham Road, City of Troutdale, Oregon. The property consists of two buildings and taxiway. The Troutdale Air Tanker Base is currently closed to all air tanker operations.
Web Link: http://www.fs.usda.gov/project/?project=51918 |
|||||
Location: UNIT - Zigzag Ranger District. STATE - Oregon. COUNTY - Multnomah. LEGAL - T. 1 N., R. 3 E., Sections 23 and 24,Portion of Lewis Marr Donation Land Claim No. 45. . Troutdale airport. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |