Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Occurring in more than one District (excluding Forestwide) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Big Bar Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Hayfork Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, McCloud Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Mt. Shasta Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Shasta Lake Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Shasta Trinity National Forest, Weaverville Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 09/13/2018 Est. FEIS NOA in Federal Register 11/2021 |
Expected:12/2021 |
12/2021 |
Nancy Rusho 202-731-9196 nancy.rusho@usda.gov |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Shasta-Trinity National Forest Outfitter/Guide Temporary and Priority Permit Authorizations EA *UPDATED* |
- Special use management |
In Progress: Comment Period Public Notice 11/03/2020 |
Expected:04/2021 |
04/2021 |
Jennifer Womack 530-926-9616 jenniferwomack@fs.fed.us |
Description: The Shasta-Trinity National is amending its process for authorizing outfitter and guide permits and will issue both temporary permits (authorizes use for less than one year) and priority permits (authorizes use for ten years).
Web Link: http://www.fs.usda.gov/project/?project=53643 |
|||||
Location: UNIT - Shasta Trinity National Forest All Units. STATE - California. COUNTY - Shasta, Siskiyou, Trinity. LEGAL - Not Applicable. The outfitter and guide activities occur at various locations across the Shasta-Trinity National Forest on all the management units. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Occurring in more than one District (excluding Forestwide) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Digital 299 Broadband Project EA |
- Special use management - Facility management |
In Progress: Scoping Start 07/12/2019 Est. Comment Period Public Notice 02/2020 |
Expected:08/2020 |
08/2020 |
Christopher Losi 530-226-2425 christopherjlosi@fs.fed.us |
Description: Install fiber optic cable near California State Route 299 from Eureka to Cottonwood on multiple land ownerships. Lead Agency: CA Public Utilities Commission. Shasta-Trinity National Forest (STNF) will decide whether to permit activities on STNF lands
Web Link: http://www.fs.usda.gov/project/?project=56456 |
|||||
Location: UNIT - Big Bar Ranger District, Weaverville Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. Project alignment generally follows CA State Route 299 (SR-299), but is sited mostly along and within shoulders of adjacent USFS and County roads. | |||||
Lakehead and Platina Transfer Stations Permit Replacement CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/20/2018 |
Expected:04/2021 |
05/2021 |
Joseph Stubbendick 530-242-5539 jstubbendick@fs.fed.us |
Description: Issue new special use permits to Shasta County to replace expiring permits. There will be no changes to the authorized facilities or increases in the scope or intensity of authorized activities.
Web Link: http://www.fs.usda.gov/project/?project=44237 |
|||||
Location: UNIT - Yolla Bolla Ranger District, Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Township 35 North, Range 5 West, Section 12 and Township 29 North, Range 10 West, Section 13 MDM. | |||||
Trinity Alps Wilderness Prescribed Fire project EA |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Comment Period Public Notice 07/25/2019 |
Expected:10/2020 |
10/2020 |
Lara Graham 530-623-1785 lgraham@fs.fed.us |
Description: Re-introduce fire onto the landscape within the Trinity Alps Wilderness by implementing prescribed fire(s)
Web Link: http://www.fs.usda.gov/project/?project=30965 |
|||||
Location: UNIT - Big Bar Ranger District, Weaverville Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. Trinity Alps Wilderness Area, Trinity County California. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Big Bar Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Burnt Ranch Fire Resilient Community EIS *UPDATED* |
- Wildlife, Fish, Rare plants - Fuels management |
In Progress: NOI in Federal Register 12/24/2014 Est. DEIS NOA in Federal Register 05/2021 |
Expected:11/2021 |
04/2022 |
Lara Graham 530-623-1785 lgraham@fs.fed.us |
Description: The goals of the project are to move Burnt Ranch toward becoming a fire resilient community and to promote & maintain late successional conditions within the Corral Late Successional Reserve. Activities will focus on the Wildland Urban Interface.
Web Link: http://www.fs.usda.gov/project/?project=38444 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T4N R6E; Section 2, 11. T5N R6E; Section 35, 25, 24, 23, 22, 21, 14, 15, 16, 11, 10, 9, 3, 2. T5N R7E Section 19, 20, 29, 30. Hum. The project planning area is approximately 8,800 acres in size. It includes the (WUI) of the Burnt Ranch community. | |||||
Hazel "D" Mining Plan of Operation CE *UPDATED* |
- Minerals and Geology |
In Progress: Scoping Start 02/06/2020 |
Expected:01/2021 |
01/2021 |
Todd Moxness 530-226-2325 tmoxness@fs.fed.us |
Description: The proponents are asking for an approved mining plan of operations for an existing mine adit as well as approval to maintain approximately 1/2 mile of road.
Web Link: http://www.fs.usda.gov/project/?project=57596 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. T7N, R7E Sec 32 and 33. Humboldt Base Meridian. | |||||
Ironside Mountain Communication Site Expansion Project EIS |
- Special use management | On Hold | N/A | N/A |
Lisa Wrenn 530-623-1744 lwrenn@fs.fed.us |
Description: The proposed action is to amend Pacific Wholesale Materials, Inc.'s current Communication Use Lease to allow them to expand their communications site on Ironside Mountain. This action also authorizes a new lease for a new 20-yr term.
Web Link: http://www.fs.usda.gov/project/?project=41689 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Southeast ¼ of the Southeast ¼ of Section 1, Township 5 North, Range 6 East, Humboldt Meridian. Ironside Mountain. | |||||
Ironside Mountain Internet Service Project CE |
- Special use management |
In Progress: Scoping Start 07/30/2020 |
Expected:08/2020 Actual: 08/18/2020 |
08/2020 |
Stephanie Riess 530-623-1755 stephaniesriess@fs.fed.us |
Description: Install communications equipment on Ironside Mountain to provide high speed internet to Burnt Ranch Elementary School and private residences in the surrounding areas.
Web Link: http://www.fs.usda.gov/project/?project=58577 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. Ironside Mountain. | |||||
Pattison Water System CE |
- Special use management | On Hold | N/A | N/A |
Lisa Wrenn 530-623-1731 lwrenn@fs.fed.us |
Description: Issue multiple permits authorizing domestic use of water system.
Web Link: http://www.fs.usda.gov/project/?project=29188 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T33N R12W, SW 1/4 of the NW 1/4 of Sec. 6, Mt. Diablo Meridian. Pattison Creek watershed near the community of Big Bar, California. | |||||
Soldier Creek Watershed Restoration EA |
- Watershed management | On Hold | N/A | N/A |
Brad Rust 530-226-2427 brust@fs.fed.us |
Description: Road-related watershed improvements, including road decommissioning, in the Soldier Creek Watershed on the Shasta-Trinity National Forest
Web Link: http://www.fs.usda.gov/project/?project=35257 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - The watershed is located in T.34N., R.11W., sections 21-29 and 32-36; T.33N., R.11W., sections 1-5, 8-17, 21-28 and 33-36; T.32N., R.11W., sections 1-4, 10-12 and 14; T.33N., R.10W., sections 18, 19 a. Trinity River Management Unit. | |||||
Soldier Forest Health EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
Stephanie Riess 530-623-1755 stephaniesriess@fs.fed.us |
Description: Vegetation management project designed to respond to concerns expressed by stakeholders, the Trinity County Community Wildfire Protection Plan, and members of the general public regarding fire hazard/risk, high fuel loading and general forest health.
Web Link: http://www.fs.usda.gov/project/?project=37022 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. The watershed is located in T.34N., R.11W., sections 21-29 and 32-36;. | |||||
Trinity River Rehabilitation Site: Chapman Ranch Phase B EA *UPDATED* |
- Wildlife, Fish, Rare plants |
In Progress: Objection Period Legal Notice 12/23/2020 |
Expected:02/2021 |
07/2021 |
Christopher Losi 530-226-2425 christopherjlosi@fs.fed.us |
Description: The US Bureau of Reclamation is proposing river restoration activities on lands managed by the Forest Service and BLM. Project will improve channel function and provide quality fish habitat. The Forest service will authorize activities on NFS lands.
Web Link: http://www.fs.usda.gov/project/?project=57140 |
|||||
Location: UNIT - Big Bar Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T33N R10W Sec. 19, 20, 29, and 30 MDM. Activities will occur within the channel of the Trinity River approx. 3 miles upstream of the Dutch Creek Road Bridge in Junction City, CA. Southwest of Weaverville. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Hayfork Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Buccaneer Placer Mining Claim - PLAN OF OPERATION CE |
- Minerals and Geology |
In Progress: Scoping Start 06/24/2020 |
Expected:09/2020 |
09/2020 |
Todd Moxness 530-226-2325 todd.moxness@usda.gov |
Description: To conduct a limited scale exploration and high bench sampling of existing remnant tailing piles on National Forest System lands under the General Mining Laws.
Web Link: http://www.fs.usda.gov/project/?project=57973 |
|||||
Location: UNIT - Hayfork Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T31N, R11W, Section 22, Mount Diablo Meridian. The project area is located approximately 4.5 air miles southeast of Hayfork, California at Hayfork Creek and Wildwood Road in Trinity County. | |||||
Ewing Trail Construction Project CE |
- Recreation management |
In Progress: Scoping Start 06/01/2020 |
Expected:07/2020 |
07/2020 |
Sally Cousins 530.551.1601 sally.cousins@usda.gov |
Description: The Shasta-Trinity National Forest proposes to construct 1 mile of non-motorized trail near Ewing Reservoir which will connect with 10 miles of trail to be constructed on adjacent BLM-managed lands.
Web Link: http://www.fs.usda.gov/project/?project=58156 |
|||||
Location: UNIT - Hayfork Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T31N, R11W, Section 7 MDM. T31N, R11W, Section 7 MDM. | |||||
Homestake Consolidated Mining Claim Exploration CE |
- Minerals and Geology | On Hold | N/A | N/A |
Todd Moxness 530-226-2325 tmoxness@fs.fed.us |
Description: A mining operations proposal to sample for valuable mineral deposits on Homestake Consolidated Mine. Approximately 3,000 cubic yards of material are proposed to be excavated and processed onsite by a trommel wash plant system. Reclamation will occur.
Web Link: http://www.fs.usda.gov/project/?project=39759 |
|||||
Location: UNIT - Hayfork Ranger District. STATE - California. COUNTY - Trinity. LEGAL - The legal location is Township 31, North, Range 11 West, Section 10, Mount Diablo Meridian. The proposed project lies within the Hayfork Creek Watershed, approximately 4 air miles East of Hayfork, California on National Forest System Lands. | |||||
Back To Top | |||||
Shasta Trinity National Forest, McCloud Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Eastside Restoration CE *UPDATED* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Completed | Actual: 12/14/2020 | 12/2020 |
Emelia Barnum 530-926-9600 ebarnum@fs.fed.us |
Description: Revitalize aspen & oak; restore meadow & stream; improve resilience of overly dense plantations & natural stands; & restore the role of fire to maintain conditions into the future. Roads will be maintained to facilitate project activities.
Web Link: http://www.fs.usda.gov/project/?project=57001 |
|||||
Location: UNIT - McCloud Ranger District. STATE - California. COUNTY - Siskiyou. LEGAL - T40N R2E S 1, 12-13, 24-25; T40N R3E S 3-10, 15-22, 27-34; T39N R3E S 3-6 MDM. Approximately 23 miles east-northeast of McCloud, CA, south and east of the junction of the Mayflower Road (41N03) and the Tom Young Road (40N24Y) (east of Bear Mountain, South of Hambone Butte). | |||||
Lower McCloud Fuels Management Project EA *UPDATED* |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 03/22/2016 Est. Comment Period Public Notice 01/2021 |
Expected:08/2021 |
08/2021 |
Emelia Barnum 530-926-4511 ebarnum@fs.fed.us |
Description: Mechanical and prescribed fire fuels reduction within ~12,000 acres in the Lower McCloud and Lower Squaw Valley Creek watersheds.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31316 |
|||||
Location: UNIT - McCloud Ranger District. STATE - California. COUNTY - Shasta. LEGAL - T37N R2W 5,6; T37N R3W 1-3, 10-12, 14-15, 23; T38N R2W 19, 27-33; T38N R3W 13-15, 22-28, 33-36. Bald Mountain Ridge, Ah-Di-Na, McCloud River, Cabin Creek areas. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Mt. Shasta Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
State Department of Water Resources Snow Survey Permit Reauthorization CE |
- Special use management |
In Progress: Scoping Start 03/03/2020 |
Expected:07/2020 |
01/2021 |
Stacy Smith 530-926-9643 stacy.l.smith@usda.gov |
Description: Reauthorization of DWR's Special Use Permit for ~28 separate sites that include snow survey courses, rain gauges, snow pillows, cabins on the Shasta-Trinity and Klamath National Forests. Annual measurement predicts State snow pack and potential runof
Web Link: http://www.fs.usda.gov/project/?project=57885 |
|||||
Location: UNIT - Mt. Shasta Ranger District. STATE - California. COUNTY - Siskiyou, Tehama, Trinity. LEGAL - Not Applicable. Sites are located on both the Klamath and Shasta-Trinity NF's as shown on attached maps. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Shasta Lake Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Antlers Resort Marina 20-Year Permit Issuance CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 05/10/2019 |
Expected:02/2021 |
03/2021 |
Paulette Kelly 530-275-1587 pkelly@fs.fed.us |
Description: Issuance of a new 20-year special use authorization (permit) to replace the existing permit which will allow for continued operation and management of Antlers Resort Marina. No changes will be made to currently authorized operations or facilities.
Web Link: http://www.fs.usda.gov/project/?project=55314 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta Unit of the National Recreation Area. Shasta Lake, Sacramento Arm. Section 13, T. 34N., R. 5W. and Section 18, T. 35N., R. 4W., MDM. | |||||
Bridge Bay Resort Storm Water Filtration System Installation CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 01/2021 |
Expected:03/2021 | 03/2021 |
Paulette Kelly 530-242-5507 pkelly@fs.fed.us |
Description: Authorize installation of storm water filtration system, including a 4 feet deep x 5 feet wide x 40 feet long filtration basin, at Bridge Bay Resort in location where storm water discharges to Shasta Lake from the south boat ramp paved parking lot.
Web Link: http://www.fs.usda.gov/project/?project=59312 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta Unit of the Whiskeytown-Shasta-Trinity National Recreation Ares. Bridge Bay Resort, 10300 Bridge Bay Road, Redding, CA. | |||||
California Department of Water Resources Juvenile Salmonid Collection System Pilot Permit CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 10/02/2020 |
Expected:04/2021 |
09/2021 |
Joseph Stubbendick 530-242-5539 jstubbendick@fs.fed.us |
Description: Issue special use permit to DWR for Juvenile Salmonid Collection System (JSCS) in McCloud Arm of Shasta Lk. JSCS consists of debris boom, guidance net, fish trap & temperature curtain. Install temporary communication equipment at Hirz Mt Lookout.
Web Link: http://www.fs.usda.gov/project/?project=58698 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta Lake, McCloud Arm. T.35N., R.3W. Sec 6 M.D.M. | |||||
City of Shasta Lake Water Storage Tank Permit CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 01/2021 |
Expected:02/2021 | 02/2021 |
Amber Machado 530-275-1587 Amber.Machado@usda.gov |
Description: Issuance of a special use authorization (permit) to City of Shasta Lake for construction of a new 2.45 million gallon water tank. Construction includes cutting an earthwork bench into the hillside to create level site & an 8-foot-tall retaining wall.
Web Link: http://www.fs.usda.gov/project/?project=58879 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta Unit of the Whiskeytown-Shasta-Trinity National Recreation Area. Proposed site is on the east side of Lake Blvd. approximately 350 feet south of the intersection of Lake Blvd. and Kennett Road. | |||||
I-5 Corridor Fuels Reduction Project EA *UPDATED* |
- Fuels management |
In Progress: Comment Period Public Notice 06/26/2020 |
Expected:04/2021 |
05/2021 |
Patrick Bell 530-275-1587 pjbell@fs.fed.us |
Description: Reduction of fuels build up on National Forest System lands in and around communities and infrastructure, and protection of municipal watersheds through fuels reduction. Includes a non-significant Forest Plan amendment.
Web Link: http://www.fs.usda.gov/project/?project=30238 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - T34N, R4W, Sec.1-11,15,16,18-22,27-33; T34N, R5W, Sec.1-4,6,8-16,22-27; T35N, R3W, Sec.5-8,17-20,30; T35N, R4W, Sec.18-20,24-26,29-36; T35N, R5W, Sec.1-4,8-15,17,20-29,33-36; T36N, R5W,Sec.34,35. Whiskeytown-Shasta-Trinity National Recreation Area, Shasta Unit, and Shasta McCloud Management Unit. Interstate 5 corridor north of Shasta Lake to the Shasta Lake Ranger District boundary. | |||||
Mountain Gate Community Services District 20-year Permit CE |
- Special use management | On Hold | N/A | N/A |
Joseph Stubbendick 530-275-1587 jstubbendick@fs.fed.us |
Description: Reauthorize use & occupancy of NFS lands for Mt. Gate CSD by issuing new 20-year term special use authorization. Replace & relocate approx. 1100' of compromised waterline 200' to the west. All work w/in currently dry drawdown zone of Shasta Lake. | |||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta-Trinity National Recreation Area. Permit covers approximately 4 acres for MGCSD operations located in portions of the NE 1/4 Section 4 T.33N., R.4W. & S 1/2 Section 33 T.34N., R.4W. M.D.M. | |||||
Shasta Lake Water Resources Investigation--Forest Service Connected Actions EIS *UPDATED* |
- Special use management |
In Progress: FEIS NOA in Federal Register 08/14/2015 |
Expected:04/2021 |
04/2021 |
Brenda Tracy 530-226-2340 btracy@fs.fed.us |
Description: Bureau of Reclamation is proposing to increase height of Shasta Dam. Forest Service (FS) has jurisdiction over NFS lands w/in the NRA. Connected actions will require authorization by permit or other suitable instrument issued by the FS to the Bureau.
Web Link: http://www.fs.usda.gov/project/?project=42376 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Shasta Unit of the Whiskeytown-Shasta-Trinity National Recreation Area. | |||||
Shasta Marina at Packers Bay 20-Year Permit Issuance EA *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/06/2015 Est. Comment Period Public Notice 04/2021 |
Expected:08/2021 |
09/2021 |
Paulette Kelly 530-275-1587 pkelly@fs.fed.us |
Description: Consolidate Shasta Marina with Shasta Marina at Packers Bay at the Packers Bay location. Reauthorize use & occupancy of NFS lands for Shasta Marina at Packers Bay by issuing new 20-year special use permit. Expand some existing Packers Bay facilities.
Web Link: http://www.fs.usda.gov/project/?project=46629 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Shasta. LEGAL - Not Applicable. Packers Bay on the Pit River Arm of Shasta Lake. Shasta Unit of the Whiskeytown-Shasta-Trinity National Recreation Area. Township 34 North, Range 4 West, Section 29. | |||||
Trinity Lake Multi-Use Trail CE *UPDATED* |
- Recreation management |
Developing Proposal Est. Scoping Start 06/2021 |
Expected:09/2021 | 03/2022 |
Cynthia Luzietti 530-275-1587 cluzietti@fs.fed.us |
Description: Construction of approximately 2 miles of non-motorized trail starting about 500 feet from the north end of the Highway 3 bridge over Stuart Fork and ending at Pinewood Cove Resort where it will connect to the existing trail (08W36) to Clark Springs.
Web Link: http://www.fs.usda.gov/project/?project=55322 |
|||||
Location: UNIT - Shasta Lake Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. Trinity Unit of the National Recreation Area. T. 35 N., R. 9 W., section 35. | |||||
Back To Top | |||||
Shasta Trinity National Forest, Weaverville Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Howe Ditch Project CE |
- Wildlife, Fish, Rare plants - Special use management |
On Hold | N/A | N/A |
Stephanie Riess 530-623-1755 stephaniesriess@fs.fed.us |
Description: Render inoperable unauthorized water diversion structures on East Weaver Creek.
Web Link: http://www.fs.usda.gov/project/?project=52921 |
|||||
Location: UNIT - Weaverville Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. The unauthorized diversion structures on East Weaver Creek are just north of the town of Weaverville, in township 34N, range 9W, section 30. | |||||
Weaverville Community Forest Fuels and Recreation Project CE *UPDATED* |
- Recreation management - Fuels management - Special use management |
In Progress: Scoping Start 02/13/2020 |
Expected:01/2021 |
02/2021 |
Lara Graham 530-623-1785 lgraham@fs.fed.us |
Description: Reduce fuel accumulation and reintroduce fire as an ecological process, and address the recreational needs within the Weaverville Community Forest.
Web Link: http://www.fs.usda.gov/project/?project=56472 |
|||||
Location: UNIT - Weaverville Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Not Applicable. T34N, R9W, Sec 16, 17, 18, 20, 21, 22, 26, 27, 28, 29, 30, 31, 32, 33, 34, MDM. T33N, R10W, Sec 1, 2, MDM. T34N, R10W, Sec 27, 34 MDM. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |