Schedule of Proposed Actions (SOPA) |
|||||
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
Report Contents (click to jump to a section) : - Projects Occurring in more than one Region (excluding Nationwide) - R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) - R2 - Rocky Mountain Region, White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R2 - Rocky Mountain Region, White River National Forest, Occurring in more than one District (excluding Forestwide) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Western Area Power Administration Right-of-Way Maintenance and Reauthorization Project EIS |
- Special use management | On Hold | N/A | N/A |
David Loomis 303-275-5008 dloomis@fs.fed.us |
Description: Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation.
Web Link: http://www.fs.usda.gov/project/?project=30630 |
|||||
Location: UNIT - Ashley National Forest All Units, Grand Valley Ranger District, Norwood Ranger District, Yampa Ranger District, Hahns Peak/Bears Ears Ranger District, Pine Ridge Ranger District, Sulphur Ranger District, East Zone/Dillon Ranger District, Paonia Ranger District, Boulder Ranger District, West Zone/Sopris Ranger District, Canyon Lakes Ranger District, Salida Ranger District, Gunnison Ranger District, Mancos/Dolores Ranger District. STATE - Colorado, Nebraska, Utah. COUNTY - Chaffee, Delta, Dolores, Eagle, Grand, Gunnison, Jackson, Lake, La Plata, Larimer, Mesa, Montrose, Routt, Saguache, San Juan, Dawes, Daggett, Uintah. LEGAL - Not Applicable. Linear transmission lines located in Colorado, Utah, and Nebraska. | |||||
Back To Top | |||||
R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Adventure Cycling Association Ten-year Outfitter and Guide Permit Issuance CE |
- Special use management |
In Progress: Scoping Start 06/18/2018 |
Expected:07/2018 |
07/2018 |
Hillary Santana 970-945-3202 hsantana@fs.fed.us |
Description: Issuance of a ten year outfitter and guide permit to Adventure Cycling Association to authorize multiple cycling tours to operate annually on National Forest System Lands across the Rocky Mountain Region.
Web Link: http://www.fs.usda.gov/project/?project=54388 |
|||||
Location: UNIT - Yampa Ranger District, Brush Creek/Hayden Ranger District, Hahns Peak/Bears Ears Ranger District, Sulphur Ranger District, South Park Ranger District, West Zone/Aspen Ranger District, East Zone/Dillon Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, Rio Grande National Forest All Units, East Zone/Eagle Ranger District, Wind River Ranger District, Salida Ranger District, Gunnison Ranger District. STATE - Colorado, Wyoming. COUNTY - Chaffee, Conejos, Eagle, Fremont, Garfield, Grand, Gunnison, Park, Pitkin, Rio Grande, Routt, Saguache, Summit, Sublette, Carbon, Fremont. LEGAL - Not Applicable. Tours will occur on NFS lands within multiple districts on the White River, Pike & San Isabel, Arapaho-Roosevelt, Medicine Bow-Routt, GMUG, Shoshone and Rio Grande National Forests. | |||||
Colorado Mountain School CE |
- Special use management | On Hold | N/A | N/A |
Jaime Oliva 303-541-2509 joliva@fs.fed.us |
Description: The Forest Service proposes to issue a ten-year outfitter and guide permit for mountaineering, avalanche education, and ski touring. This will replace a transitional priority use permit. | |||||
Location: UNIT - Boulder Ranger District, East Zone/Holy Cross Ranger District, Canyon Lakes Ranger District. STATE - Colorado. COUNTY - Boulder, Eagle, Larimer. LEGAL - Not Applicable. Indian Peaks Wilderness from May 1st to November 30th, east of the continental divide, and ice climbing within the Canyon Lakes and Holy Cross Ranger District's. | |||||
Back To Top | |||||
White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Abandoned Cabin Demolition - Wise Mtn, Bemrose Creek, My Guyot, Keystone Gulch, and Peru Creek CE *NEW LISTING* |
- Land ownership management |
In Progress: Scoping Start 05/29/2019 |
Expected:12/2019 |
07/2020 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
Description: Demolition and removal of abandoned equipment, materials and structures at five abandoned mining cabins (Wise Mtn, Bemrose Creek, Mt. Guyot, Keystone Gulch and Peru Creek). | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Summit. LEGAL - Wise Mtn Cabin - Sec 20, T6S, R76W; Bemrose Cabin - Sec 12, T8S, R77W; Mt Guyot Cabin - Sec 6, T7S, R76W; Keystone Gulch - Sec 36, T5S, R77W; Peru Creek - Sec 19, T5S, R75W. 6th P.M. Summit County, CO. Wise Mtn Cabin - North Fork Swan River; Bemrose Cr Cabin - east of Hoosier Pass; Mt Guyot Cabin, near Georgia Pass; Keystone Gulch near Keystone Ski area; and Peru Cr Cabin east of Keystone. | |||||
Mulroy Ranch access route CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 10/2019 |
Expected:11/2019 | 05/2020 |
Matthew Klein (970) 827-5182 / 5715 matthewklein@fs.fed.us |
Description: Grant a special use authorization to private landowner for access across NFS to his landlocked parcel by using an existing road prism "as-is/where-is" | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle. LEGAL - T.2S, R.82W, Sec.8, 6th P.M. Eagle County, CO. Use of publicly closed two-track road across NFS (formerly NFSR 447 Garden Gulch Road) in the vicinity of Rancho del Rio. | |||||
PSCo Amendment #1 to DIL793 - Tenmile Creek Electric Distribution Line Re-Alignment CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 05/29/2019 |
Expected:10/2019 |
10/2019 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
Description: Amendment to existing permit to allow for removal of existing overhead electric line and construction, operation and maintenance of an underground electric distribution cable to be placed within the existing right-of-way of Highway 91. | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Summit. LEGAL - SW 1/4 Sec 29 and NW 1/4 Sec 32, T.6S, R.78W, 6th P.M., Summit County, CO. Utility corridor along the Tenmile Creek north of Copper Mountain Ski Resort and parallel to Hwy 91. | |||||
PSCo Amendment #2 to DIL770 - Blue River South EDL Permit CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 07/12/2019 |
Expected:10/2019 |
10/2019 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
Description: Amendment to DIL770, South Blue River Electric Distribution Line Permit, to allow for removal of existing overhead line through a wetland area and installation of approximately 800ft of buried cable, within the existing r-o-w of Barton Rd. | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Summit. LEGAL - North of the Town of Breckenridge - near Barton Road - SE1/4 Sec 24, T.6S., R.78W., 6th P.M., Summit County, CO. North of the Town of Breckenridge within the existing right-of-way of Barton Road west of its intersection with Airport Road. | |||||
Pitkin County Ruedi Hill (Red Hill) Comm Site Re-Development CE |
- Facility management |
Developing Proposal Est. Scoping Start 07/2019 |
Expected:09/2019 | 09/2019 |
Michael Braudis 970-262-3481 mbraudis@fs.fed.us |
Description: Re-development and access authorization of the existing Red Hill Communications site with increase in footprint and tower height to accommodate and provide public safety radio service, FM Transmission and broadband services.
Web Link: http://www.fs.usda.gov/project/?project=56462 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle. LEGAL - Sec. 7 of T*S, R84W and Secs. 1 and 12, T8S, R85W of the 6th P.M. Eagle County, CO. Ruedi Hill Communications Site located 1,300 ft above and to the west of Ruedi Reservoir in Eagle County, CO. | |||||
Valley View Ajax, LLC Access - Loushin's Rd Aspen Mountain Ski Area CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 11/04/2019 |
Expected:12/2019 |
12/2019 |
Michael Braudis 970-262-3481 mbraudis@fs.fed.us |
Description: Analysis of summer residential use of an existing road (Loushin's Rd) within the existing permit boundary of Aspen Mountain Ski Area to be made by the residents and their assignees of an adjacent private parcel within the greater Pandoras areas. | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Pitkin. LEGAL - Project is located along an existing road commonly referred to as Loushin's Road; NW1/4, Section 30, T. 10S., R 84 W., 6th P.M., Pitkin County, Colorado. NW1/4, Section 30, T. 10S., R. 84 W., 6th P.M., Pitkin County, Colorado. | |||||
White River Forest Health and Fuels Management Project CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 12/18/2018 |
Expected:02/2019 |
06/2019 |
Shelby Limberis 970-827-5161 slimberis@fs.fed.us |
Description: White River National Forest proposes to perform density reduction treatments in over-crowded regenerating stands of trees. Treatments would reduce the number of trees per acre to improve overall stand health.
Web Link: http://www.fs.usda.gov/project/?project=55257 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Mesa, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Project activities include all Ranger Districts on the White River National Forest. | |||||
Xcel Energy - DIL 462 Natural Gas Distribution Line - Amendment - Solitude Station CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 07/10/2019 |
Expected:10/2019 |
10/2019 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
Description: Amendment to existing permit to allow for construction, operation and maintenance of an upgraded 2,500 foot segment of buried gas line known as the Copper Mountain Solitude Station Lateral. | |||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Summit. LEGAL - SW 1/4 Sec 30 & NW 1/4 Sec 31, T.6S., R.78W., 6th P.M., Summit County, CO. Copper Mountain Ski Resort - Solitude Station Resort. | |||||
Back To Top | |||||
White River National Forest, Occurring in more than one District (excluding Forestwide) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Berlaimont Estates Road Improvement Project EIS |
- Special use management - Road management |
In Progress: DEIS NOA in Federal Register 01/26/2018 Est. FEIS NOA in Federal Register 10/2019 |
Expected:10/2019 |
10/2019 |
Matthew Klein 970-827-5715 matthewklein@fs.fed.us |
Description: The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards.
Web Link: http://www.fs.usda.gov/project/?project=50041 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - The project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado. Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. | |||||
Blanco Ranger District Five Year Recreation Event Special Use Permit Issuance CE *UPDATED* |
- Special use management | Cancelled | N/A | N/A |
Hillary Santana 970-945-3202 hsantana@fs.fed.us |
Description: Issuance of five year recreation event permits to authorize 2 recreation events to operate on the Blanco Ranger District. Events have been authorized in prior years under temporary permits. Events are ATV and snowmobile rides.
Web Link: http://www.fs.usda.gov/project/?project=53251 |
|||||
Location: UNIT - West Zone/Blanco Ranger District, West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield, Rio Blanco. LEGAL - Not Applicable. Events will occur within the Blanco and Rifle Ranger Districts (see individual event maps). | |||||
Camp Hale Restoration and Enhancement Project EIS |
- Watershed management | On Hold | N/A | N/A |
Aaron Mayville 970-827-5152 awmayville@fs.fed.us |
Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area.
Web Link: http://www.fs.usda.gov/project/?project=46121 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. | |||||
Back To Top | |||||
White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Arctic Placer Trail Realignment & Construction
CE |
- Recreation management |
In Progress: Scoping Start 03/30/2018 |
Expected:04/2019 |
07/2019 |
Cynthia Ebbert 970-262-3458 cebbert@fs.fed.us |
Description: The purpose of this project is to improve the condition of the Arctic Placer Trail through realignment and construction. The existing trail is very steep, travels straight up the hillside, and is causing soil erosion during spring run.
Web Link: http://www.fs.usda.gov/project/?project=53754 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. West of Silverthorne in the Mesa Cortina Area. | |||||
Breckenridge Peak 7 Infill Chairlift CE *UPDATED* |
- Recreation management - Special use management |
Completed | Actual: 10/24/2019 | 06/2020 |
Samuel Massman 970-262-3484 smassman@fs.fed.us |
Description: Proposed chairlift to improve skier circulation on existing lift-served terrain on Breckenridge Ski Resort's Peak 7.
Web Link: http://www.fs.usda.gov/project/?project=55905 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. White River NF, Dillon RD, within Breckenridge Ski Resort's Ski Area Term Special Use Permit area. | |||||
Broken Wheel Trail Realignment & Construction
CE |
- Recreation management |
In Progress: Scoping Start 03/30/2018 |
Expected:04/2019 |
07/2019 |
Cynthia Ebbert 970-262-3458 cebbert@fs.fed.us |
Description: The purpose of this project is to improve the condition of the Broken Wheel Trail through realignment and construction. The existing trail is very steep,
travels straight up the hillside, and is causing soil erosion during spring run.
Web Link: http://www.fs.usda.gov/project/?project=53753 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. West of Breckenridge. | |||||
Groovi Uvi Trail Improvements CE |
- Recreation management |
In Progress: Scoping Start 03/27/2018 |
Expected:04/2019 |
08/2019 |
Cynthia Ebbert 970-262-3458 cebbert@fs.fed.us |
Description: 1. Realign a segment of the trail to remove it from a wet area. 2. Extend the trail by 1 mi through adopting an existing social trail. 3. Decommission trail #316W.1B (1.1 mi)which was identified in the Travel Management Plan to be decommissioned. | |||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Soda Creek drainage near Summit Cove . | |||||
Indiana Creek Aquatic Organism Passage and Road Decommissioning CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
Completed | Actual: 05/24/2019 | 05/2019 |
Ashley Nettles 970-262-3457 anettles@fs.fed.us |
Description: To create an Aquatic Organism Passage at the open water ford at the intersection of Indiana Creek and Pennsylvania Creek Rd. The 2nd objective is to decommission a 1.3 mi segment of a non-system FS road that is causing sediment and bank instability.
Web Link: http://www.fs.usda.gov/project/?project=53755 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Indiana Creek Drainage - SE of Breckenridge. | |||||
Meadow Creek Trail Realignment & Construction CE |
- Recreation management |
In Progress: Scoping Start 03/30/2018 |
Expected:04/2019 |
07/2019 |
Cynthia Ebbert 970-262-3458 cebbert@fs.fed.us |
Description: The trail would be realigned to a more sustainable grade. Modern trail design standards would be incorporated including sustainable grades, grade reversals, and out sloping of the tread. The trail tread will be constructed to a 18-24 inch width. | |||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Northwest of Frisco adjacent to Eagles Nest Wilderness Area. | |||||
Miners Creek Trail Reconstruction (FDT#38) CE |
- Recreation management |
In Progress: Scoping Start 03/30/2018 |
Expected:04/2019 |
07/2019 |
Cynthia Ebbert 970-262-3458 cebbert@fs.fed.us |
Description: To improve the condition of the Miners Creek trail through the realignment of three segments where the trail is very steep and goes up the fall line. Trail reconstruction will be accomplished through hand crew and/or motorized construction.
Web Link: http://www.fs.usda.gov/project/?project=53747 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. South of Frisco and North of Breckenridge Ski Resort, between Highway 9 and Interstate 70. | |||||
Peak One and Pine Cover Campground Improvements Project CE *NEW LISTING* |
- Recreation management - Facility management |
In Progress: Scoping Start 10/01/2019 |
Expected:11/2019 |
04/2020 |
Cory Richardson 605-279-2125 coryrichardson@fs.fed.us |
Description: The project proposes to modernize and improve recreation facilities, reduce deferred maintenance costs, provide an improved visitor experience, and offer additional campsites and campground amenities at Peak One and Pine Cove Campgrounds.
Web Link: http://www.fs.usda.gov/project/?project=56928 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Township 5 South, Range 78 West, Sections 25 and 30. Peak One and Pine Cove Campgrounds. | |||||
Back To Top | |||||
White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2019 Powerline Project - Glenwood Canyon CE *NEW LISTING* |
- Special use management | Completed | Actual: 06/11/2019 | 06/2019 |
Matthew Klein (970) 827-5182 / 5715 matthewklein@fs.fed.us |
Description: Electrical infrastructure management activities in Glenwood Canyon on above-ground transmission lines and the local distribution circuit. Repair/replace structures due to structural degradation or insufficient vertical clearance. | |||||
Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - T.5S, R88W. Sec. 35. T.6S, R.88W, Sec. 4, 5, 8. Within Glenwood Canyon, on both sides of Colorado River, from Shoshone Hydroelectric Generating Plant, westward to No Name Rest Area. | |||||
Derby Mesa Project CE |
- Wildlife, Fish, Rare plants - Grazing management - Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 09/2019 |
Expected:03/2020 | 04/2020 |
Brett Crary 970-328-5899 brett.crary@usda.gov |
Description: Restore ponderosa pine forests to Fire Regime Condition Class I. Improve habitat for species dependent on ponderosa pine forests. Reintroduce surface fire to ponderosa pine ecosystems. Reduce pinon/juniper encroachment from sagebrush communities.
Web Link: http://www.fs.usda.gov/project/?project=56829 |
|||||
Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T.2S, R.86W, Sections 13, 14, 23, 24, 25, 26, 36. Project is located on Derby Mesa, west of Burns, Colorado on the Eagle/Holy Cross Ranger District. | |||||
Back To Top | |||||
White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2019 Burial of Electric Distribution Line - Cross Creek Place - Minturn, CO CE *NEW LISTING* |
- Special use management | Completed | Actual: 06/21/2019 | 06/2019 |
Matthew Klein (970) 827-5182 / 5715 matthewklein@fs.fed.us |
Description: Burial of a small segment of overhead electrical distribution line (25kv) just inside of the National Forest boundary. | |||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T.5S, R.81W, Sec. 36 6th P.M. Eagle County, CO. Just inside of the National Forest boundary adjacent to private property in the vicinity of Cross Creek and US Highway 24 in Minturn, CO. | |||||
Eagle-Holy Cross Trail Reroutes 2019 CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 10/2019 |
Expected:11/2019 | 11/2019 |
Michael Beach 970-827-5162 mjbeach@fs.fed.us |
Description: Trail Reroutes | |||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T. 5S, R. 81W, Sections 10, 11, 14. T. 5S, R. 80W, Sec 1 and 12. Colorado Trail/Continental Divide National Scenic Trail, Cougar Ridge, Game Creek, Full Nelson, Meadow Mountain trails, in the vicinity of Minturn Colorado. | |||||
Eagle/Holy Cross Trail Reroutes CE |
- Recreation management |
In Progress: Scoping Start 02/27/2018 |
Expected:05/2018 |
07/2018 |
Michael Beach 970-827-5162 mjbeach@fs.fed.us |
Description: Proposal to re-route portions of these trails are steeper than FS trail standards direct. The proposed action would lessen the trail grade and include more sustainable trail design
Web Link: http://www.fs.usda.gov/project/?project=53599 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. 1)Bighorn Trail, 2) North Trail, and 3) Pitkin Trail %u2013all in Vail, Eagle County, Colorado. | |||||
Holy Cross Energy (HCE) Avon-to-Gilman Electric (115-kV) Transmission Line EA *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 11/2019 |
Expected:07/2020 | 10/2020 |
Matthew Klein (970) 827-5182 / 5715 matthewklein@fs.fed.us |
Description: Holy Cross Electric Association, Inc. proposes to construct 8.65 miles of new 115-kV transmission line between the Gilman and Avon substations along the Eagle River valley, crossing 3 miles of the White River National Forest and the Town of Minturn.
Web Link: http://www.fs.usda.gov/project/?project=57224 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Townships 5 South - 81 West and 6 South - 81 West, 6th Principal Meridian, Eagle County, Colorado. The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman. | |||||
Muddy Pass/Sheephorn Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Grazing management - Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Objection Period Legal Notice 09/12/2019 |
Expected:10/2019 |
10/2019 |
Brett Crary 970-328-5899 bcrary@fs.fed.us |
Description: The Muddy Pass/Sheephorn Project, located on the Holy Cross Ranger District, is proposing a variety of management activities designed to benefit multiple resources, including forest vegetation, fisheries, range, transportation, fuels, and wildlife.
Web Link: http://www.fs.usda.gov/project/?project=53148 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Project is bound to the north by the Colorado River, to the east by Elliot's Ridge and the Eagle's Nest Wilderness, to the south by Interstate 70, and to the west by Colorado Highway 131. | |||||
Shrine Pass Road Sheep Shipping Corrals CE *UPDATED* |
- Grazing management | Completed | Actual: 12/03/2019 | 01/2020 |
Jessica Crawford 970-328-5869 jessicacrawford@fs.fed.us |
Description: Proposal to build permanent sheep shipping corrals easily accessible by semi in the Shrine Pass area in order to spatially separate fall gathering and shipping operations from fall recreation demands at the very busy Shrine Pass Trailhead.
Web Link: http://www.fs.usda.gov/project/?project=53598 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle, Summit. LEGAL - T6S R79W Sec 9. Area is adjacent to the junction of FSR 709.1A and the Shrine Pass Road near Shrine pass on the border of the Eagle-Holy Cross and Dillon ranger districts. | |||||
Back To Top | |||||
White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Big Burn Chairlift Replacement, Snowmass Mountain Resort CE *NEW LISTING* |
- Special use management | Completed | Actual: 12/20/2019 | 06/2020 |
Monte Lutterman 970-404-3164 mlutterman@fs.fed.us |
Description: Snowmass proposes to replace the outdated Big Burn high-speed detachable quad chairlift with a new high-speed detachable six-person chairlift. The design capacity of the new chairlift would equal that of the existing chairlift (2,200 people per hour)
Web Link: http://www.fs.usda.gov/project/?project=56986 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T.10S, R.85W, Sections 14, 23. Snowmass Mountain Resort, Big Burn Pod. | |||||
Kloser Construction Access - Richmond Ridge CE *UPDATED* |
- Special use management | Completed | Actual: 11/13/2019 | 12/2019 |
Michael Braudis 970-404-3153 mbraudis@fs.fed.us |
Description: Temporary authorization for construction, maintenance and use of a road across National Forest System lands for construction of a private residence. Route may provide subsequent access on an limited per request basis following rehabilitation.
Web Link: http://www.fs.usda.gov/project/?project=56057 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Hercules Lode Claim M.S. 4251 located in the SW1/4 of Sec. 31, T. 10 S., R. 84 W. of the 6th Principle Meridian, Pitkin County, CO. The Hercules Lode M.S. #4251 in located along the western ridge line of the Richmond Hill area, approximately 4 miles from the town of Aspen, CO above the Little Annie Basin. | |||||
Pitkin County Open Space and Trails Aspen Administrative Office Visitor Center Permit Reissuance CE |
- Special use management |
In Progress: Scoping Start 05/22/2019 |
Expected:05/2019 |
06/2019 |
Hillary Santana 970-945-3202 hillary.santana@usda.gov |
Description: Issuance of a five year visitor center permit to Pitkin County Open Space and Trails to allow the holder to operate and maintain a visitor center in the Aspen Ranger District administration office in partnership with the White River National Forest.
Web Link: http://www.fs.usda.gov/project/?project=56126 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - 1 acre in NW1/4SE1/4 Sec. 12, T. 10 S., R. 85 W., 6th Principal Meridian. Administrative office building of the Aspen Ranger District, located at 806 West Hallam, Aspen, CO 81611. | |||||
Back To Top | |||||
White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Griefenberg Driveway Easement Project CE *UPDATED* |
- Land ownership management - Road management |
Completed | Actual: 02/08/2019 | 02/2019 |
Joseph Fazzi 970-625-6855 jfazzi@fs.fed.us |
Description: Issue a driveway easement off the Forest Service Road 245. Easement would be for private parcel #187130200006. Easement would be 20 feet long by 15 feet wide for the purpose of accessing private land. The driveway was established in 1930.
Web Link: http://www.fs.usda.gov/project/?project=55196 |
|||||
Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Section: 30 Township: 3 Range: 91 PT OF HES #352(30.87). Section: 30 Township: 3 Range: 91 PT OF HES #352(30.87). 10.6 miles From Forest Boundary on Forest service Road 245. | |||||
Back To Top | |||||
White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Basalt Mountain Salvage and Rehabilitation Project EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
Completed | Actual: 11/06/2019 | 11/2019 |
Christopher McDonald 970-625-6856 cmcdonald@fs.fed.us |
Description: Proposing vegetation treatments to salvage fire killed timber, remove hazard trees and create defensible space near structures in the Cattle Creek area. Additionally, approximately 6,500 acres will be monitored for reforestation needs.
Web Link: http://www.fs.usda.gov/project/?project=55031 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Portions of Sections 12-13, 24-25, T7S, R86W; Portions of Sections 7-9, 15-18, 19-21, 29-30, T7S, R87W; 6th Principal Meridian, Eagle County, Colorado. Project is located approximately 4 miles north of the Town of Basalt in Eagle County, Colorado. In the vicinity of Basalt Mountain along NFSR 524 and NFSR 509. | |||||
County Line Project EA |
- Recreation management - Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Objection Period Legal Notice 06/20/2019 |
Expected:08/2019 |
08/2019 |
Shelby Limberis 970-827-5161 slimberis@fs.fed.us |
Description: The Aspen-Sopris Ranger District is proposing approximately 1600 acres of vegetation treatments along FSR 300. Additional projects identified in the area include recreation management enhancements and prescribed fire.
Web Link: http://www.fs.usda.gov/project/?project=52653 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield, Mesa, Pitkin. LEGAL - Sec. 19,30-32, T7S R89W; Sec. 24, T7S R90W; Sec. 6,7, T8S R89W; Sec. 1,11,12, T8S R90W, Garfield Co; Sec. 18, T8S R89W; Sec. 13-15,22-24,26,27, T8S R90W, Pitkin Co; Sec. 15,21,22, T8S, R90W, Mesa Co. Project is located in the vicinity of FSR 300 between Four-mile Park and Baylor Park. | |||||
El Jebel Administrative Sites, Upper and Lower Parcels, Conveyance Project EIS |
- Land ownership management |
In Progress: NOI in Federal Register 12/07/2016 Est. DEIS NOA in Federal Register 06/2019 |
Expected:10/2019 |
10/2019 |
Kevin Warner 970-945-3303 kevin.warner@usda.gov |
Description: Proposal to sell two adjacent parcels of land (approx. 40 acres and 30 acres in size), and the associated water rights and mineral estate in El Jebel, Colo. pursuant to the Forest Service Facilities Realignment and Enhancement Act of 2015.
Web Link: http://www.fs.usda.gov/project/?project=50663 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4. The Lower Parcel is approximately 40 acres and is predominantly riparian in nature and the Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures. | |||||
Redstone to McClure Pass Trail EA |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 11/2019 |
Expected:10/2020 | 10/2020 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
Description: Pitkin County has proposed a native surface trail connecting Redstone with McClure Pass. The 5 mile section of trail on NFS would lie within the CDOT right of way or along the historic wagon road.
Web Link: http://www.fs.usda.gov/project/?project=56913 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route. | |||||
Schofield Pass AML Safety Closures CE *NEW LISTING* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 01/2020 |
Expected:05/2020 | 07/2020 |
Olivia Garcia 970-945-3220 ogarcia@fs.fed.us |
Description: Schofield Pass AML - Construction of approximately 20-25 barriers on open mine adits/shafts in the upper basins of the Schofield Pass area in Gunnison County. Additional restoration work includes road decommissioning, and trail maintenance. | |||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - Sopris RD. Legal Description: Township 11 South, Range 87 West, Section 36 Legal Description: Township 12 South, Range 87 West, Sections 2, 3, 4, 10,11, 12, 13, 14, 21, 23, and 24. North Pole, Rock Creek Gulch, and Paradise Basins above the valley floor of the Schofield Pass area. Safety closure work also includes mine features on Treasury Mountain (Ragged Wilderness). | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |