Schedule of Proposed Actions (SOPA)
01/01/2012 to 03/31/2012
Chugach National Forest

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Report Contents (click to jump to a section) :
Projects Occurring Nationwide
R10 - Alaska Region, Chugach National Forest, Forestwide (excluding Projects occurring in more than one Forest)
R10 - Alaska Region, Chugach National Forest, Occurring in more than one District (excluding Forestwide)
R10 - Alaska Region, Chugach National Forest,  Cordova Ranger District (excluding Projects occurring in more than one District)
R10 - Alaska Region, Chugach National Forest,  Glacier Ranger District (excluding Projects occurring in more than one District)
R10 - Alaska Region, Chugach National Forest,  Seward Ranger District (excluding Projects occurring in more than one District)

Projects Occurring Nationwide  

 
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Gypsy Moth Management in the United States: A Cooperative Approach
EIS
- Vegetation management (other than forest products)  In Progress:
DEIS NOA in Federal Register 09/19/2008
Est. FEIS NOA in Federal Register 12/2011 
Expected:03/2012
 
01/2013 Noel Schneeberger
610-557-4121
nschneeberger@fs.fed.us 
Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link:  http://www.na.fs.fed.us/wv/eis/
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide.
Land Management Planning Rule
EIS
- Regulations, Directives, Orders  In Progress:
DEIS NOA in Federal Register 02/25/2011
Est. FEIS NOA in Federal Register 11/2011 
Expected:12/2011
 
12/2011 Larry Hayden
202-205-1559
lhayden@fs.fed.us 
Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link:  http://www.fs.usda.gov/planningrule
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule.
Nationwide Aerial Application of Fire Retardant on National Forest System Lands.
EIS
- Regulations, Directives, Orders  In Progress:
DEIS NOA in Federal Register 05/13/2011
Est. FEIS NOA in Federal Register 11/2011 
Expected:12/2011
 
01/2012 Glen Stein
208-869-5405
gstein@fs.fed.us 
Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link:  http://www.fs.fed.us/fire/retardant/index.html
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide.
Back To Top

Chugach National Forest, Forestwide (excluding Projects occurring in more than one Forest)  

R10 - Alaska Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Aquatic MIS and Habitat Monitoring Revision
CE

           *NEW LISTING*
- Land management planning
- Wildlife, Fish, Rare plants 
Developing Proposal
Est. Colloboration Start 10/2011 
Expected:02/2012  03/2012 Timory Peel
406-295-7433
tpeel@fs.fed.us 
Description: The Chugach National Forest is proposing a non-significant amendment to the LRMP to remove three aquatic management indicator species (MIS) and replace the MIS monitoring questions with aquatic habitat monitoring.
Location: UNIT - Chugach National Forest All Units. STATE - Alaska. COUNTY - Kenai Peninsula. Chugach National Forest: All units.
Cooper Lake Hydroelectric Project
EA

           *NEW LISTING*
- Special use management  Completed  Actual: 12/05/2011  05/2012 Joshua Milligan
907-224-3374
jmilligan@fs.fed.us 
Description: The Forest Service is proposing to issue three special use permits to Chugach Electric Association (CEA) for the operation of the existing Cooper Lake Hydroelectric facility.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36800
Location: UNIT - Chugach National Forest All Units. STATE - Alaska. COUNTY - Kenai Peninsula. The project area is located on Cooper Lake; near the community of Cooper Landing in south-central Alaska.
Monitoring and Evaluation Strategy Revision
CE

           *NEW LISTING*
- Land management planning  Developing Proposal
Est. Colloboration Start 01/2012 
Expected:05/2012  06/2012 Timory Peel
406-295-7433
tpeel@fs.fed.us 
Description: The Chugach National Forest is proposing a non-significant amendment to the LRMP to revise the monitoring and evaluation strategy
Location: UNIT - Chugach National Forest All Units. STATE - Alaska. COUNTY - Kenai Peninsula. Chugach National Forest: All Units.
Quartz Creek Transmission Line Reconstruction
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 12/06/2011 
Expected:02/2012
 
05/2012 Joshua Milligan
907-224-3374
jmilligan@fs.fed.us 
Description: The U.S. Forest Service (USFS), Chugach National Forest is proposing to rebuild a 12-15 mile segment of the Quartz Creek 115kV transmission line
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37828
Location: UNIT - Chugach National Forest All Units. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T7N, R1E, Section 3;T8N, R1E, Sections 1, 12, 13, 14, 23, 26, 27, 34; T8N, R2E, Section 6; T9N, R2E, Sections 27, 28, 31, 32, 33. The transmission line is located near Turnagain Pass between Ingram Creek and the Johnson Pass Trailhead, adjacent to approximately milepost 64 to milepost 75 of the Seward Highway.
Resurrection River Trail Reroute
CE
- Recreation management  Cancelled  N/A  N/A Joshua Milligan
907-224-3374
jmilligan@fs.fed.us 
Description: The Seward Ranger District is proposing to reroute approximately 2,700 feet of the Resurrection River Trail. The reroute will occur at mile 13.8 of the trail; near Summit Creek. FAA Category 3.
Location: UNIT - Chugach National Forest All Units. STATE - Alaska. COUNTY - Kenai Peninsula. Resurrection River Trail, Seward Ranger District.
Back To Top

Chugach National Forest, Occurring in more than one District (excluding Forestwide)  

R10 - Alaska Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Alaska Avalanche School Special Use Permit Renewal
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
01/2012 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: The Alaska Avalanche School has applied to renew their special use permit for Avalanche I, II & III trainings, and snow machine hazard evauation and rescue trainings on the Glacier & Seward Ranger District. Their current permit expires Dec 31, 2011.
Location: UNIT - Glacier Ranger District, Seward Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. Turnagain Pass, Twentymile River Area, Placer River Area, Johnson Pass Area, Twin Tip Area, and Fresno Creek Area.
Kenai Peninsula Invasive Plant Control
EA

           *NEW LISTING*
- Vegetation management (other than forest products)  Developing Proposal
Est. Scoping Start 11/2011 
Expected:08/2012  06/2013 Betty Charnon
907-754-2326
bcharnon@fs.fed.us 
Description: Control infestations of priority invasive plant occurrences on the Kenai Peninsula portion of the Chugach National Forest including use of herbicides on small scales on species and infestations where manual control has largely failed.
Location: UNIT - Glacier Ranger District, Seward Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. All of the Seward Ranger District and those portions of the Glacier Ranger District within the “Kenai Peninsula Zone”.
Back To Top

Chugach National Forest,   Cordova Ranger District (excluding Projects occurring in more than one District)

R10 - Alaska Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Eyak Boat Launch Reconstruction Project
EA
- Recreation management  In Progress:
Scoping Start 05/02/2011
Est. 215 Comment Period Legal Notice 06/2011 
Expected:09/2011
 
04/2012 Dave Zastrow
907-424-4754
dzastrow@fs.fed.us 
Description: The USFS, Cordova RD is proposing to reconstruct the Eyak boat launch and parking area. The project will address stream bank restoration, traffic flow safety, eliminate encroachment on private land and install a double wide boat ramp.
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - Cordova C-5 T15S R2W Section 31 NE 1/4, C.M. The site is located off the Copper River Highway at mile 6.2 on the Eyak river 200 yards south of Eyak lake.
Flag Point Rock Source
EA
- Recreation management
- Forest products
- Road management 
Completed  Actual: 06/10/2011  06/2011 Robert Behrends
907-424-4729
rbehrends@fs.fed.us 
Description: The Chugach National Forest is seeking public comments concerning a proposed action to reopen an existing borrow pit, near the Copper River Delta crossing of the Copper River Highway.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34911
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - Copper River Meridian, T16S, R2E, Section 29 and 30. Near Mile 27, North of the Copper River Highway, Cordova, Alaska.
Ibeck Creek OHV Trail Re-route
CE

           *NEW LISTING*
- Recreation management
- Wildlife, Fish, Rare plants
- Watershed management 
Developing Proposal
Est. Scoping Start 12/2011 
Expected:02/2012  08/2012 Jeff Jackson
907-424-4765
jbjackson@fs.fed.us 
Description: Restore damage caused by off-highway vehicles on spawning and rearing habitat utilized by Coho salmon by re-directing trails at key stream crossings, installing low-water fords, blocking some crossings with boulders and re-vegetating streambanks.
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. Approximately 8 miles east of Cordova, AK on north side of Copper River Highway.
Jordan Pond Alaska Ski Touring LLC request for special use authorization
CE
- Special use management  Completed  Actual: 10/14/2011  11/2011 Debra Srb
907-424-4726
dsrb@fs.fed.us 
Description: Jordan Pond has submitted a proposal for commercial non-motorized ski touring in AA 13-07 and AA 6-03 F on the Cordova Ranger District. 60 service days. No helicopters use. The areas will be accessed via boat and snow machine. Winter season only.
Web Link:  http://www.fs.usda.gov/chugach
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - T9S, R2W SE1/4, T9S, R1W SW1/4, T10S, R1W some, T10S, R1E S1/2, T10S, R8W some, T10S, R7W most, CRM. AA 13-07 and AA 6-03F on the Cordova Ranger District.
Mile 25 Spawning Channel Maintenance
CE
- Wildlife, Fish, Rare plants  In Progress:
215 Comment Period Legal Notice 04/30/2011 
Expected:06/2011
 
07/2011 Jeff Jackson
907-424-4765
jbjackson@fs.fed.us 
Description: This project proposes to re-establish usable spawning gravels preferred by coho salmon in the man-made Mile 25 spawning channel on USDA Forest Service land. This will improve spawning habitat and egg survival, providing more fish for all user groups.
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - T15S, R3W, Sec. 27, Copper River Meridian, Cordova B4 quadrangle. Approximately 25 miles east of Cordova, AK, Copper River Highway, West Copper River Delta.
Proposal to Cut Mature Shrubs on the Copper River Delta for Moose Habitat Enhancement
CE
- Wildlife, Fish, Rare plants  Developing Proposal
Est. Scoping Start 07/2011 
Expected:08/2011  12/2011 Erin Cooper
907-424-4757
ecooper@fs.fed.us 
Description: The Chugach National Forest and Eyak Corporation propose to cut 700 acres of mature shrubs on the west Copper River Delta to improve winter moose habitat.
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - Township: C015S002W, C015S001W, C015S001E, C016S002W, C016S001W, C016S001E. West Copper River Delta, located East of Cordova, Alaska.
Stevenson ANILCA Shelter Authorization 5-Year Renewal
CE
- Special use management  Developing Proposal
Est. Scoping Start 10/2011 
Expected:11/2011  11/2011 Debra Srb
907-424-4726
dsrb@fs.fed.us 
Description: Renewal of an authorization for an ANILCA shelter owned by Deb and Ed Stevenson
Location: UNIT - Cordova Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - CRM, T.12 S., R. 4 W., Sec. 7, SE 1/4 NW 1/4. Shelter owned by Stevenson family located at Dead Creek in Gravina Bay, Prince William Sound, Alaska.
Back To Top

Chugach National Forest,   Glacier Ranger District (excluding Projects occurring in more than one District)

R10 - Alaska Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Alaska Alpine School Special Use Permit Amendment
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
11/2011 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Alaska Alpine School has applied for an amendment to their special use permit. The request is for an additional use area for avalanche courses and additional use area and service days for guided hikes in Portage Valley from May thru October.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. Turnagain Pass (East), Portage Valley Trail of Blue Ice, Byron Glacier Trail and Portage Pass Trail.
Alaska Backcountry Access Special Use Permit Amendment Request
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
11/2011 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Alaska Backcountry Access has applied for an amendment to their 10 year permit. The request is for additional 225 service days in the Crow Pass dry canyon for hiking.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage. LEGAL - NE 1/4, SW1/4, Sec. 24, T. 11 N., R. 2 E., S.M. Crow Creek Dry Canyon.
Alaska Dept of Fish & Game Cannery Crk Hatchery Health & Safety Improvements
CE
- Special use management  In Progress:
Scoping Start 08/09/2010 
Expected:11/2011
 
11/2011 Teresa Paquet
907-754-2314
tpaquet@fs.fed.us 
Description: ADFG is proposing health & safety updates at Cannery Crk Fish Hatchery. It involves removing 2 old fuel tanks, installing 2 new tanks in a new location, removing existing generator shed, & building a new shed at a safer distance from the hatchery.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Valdez-Cordova. LEGAL - Sec. 28, T. 11 N., R. 11 E., S.M. Cannery Creek is on the east shore of Unakwik Inlet, about half way up the inlet, in the northwest area of Prince William Sound, Alaska.
Alaska Wild Guides, LLC Special Use Permit Application
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
11/2011 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Alaska Wild Guides has applied for a new special use permit to conduct ski/snowshoe tours in Johnson Pass and Turnagain Pass and snow mobile tours in Placer River Valley, Turnagain Pass and Granite Creek/Johnson Pass on the Glacier Ranger District.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. Turnagain Pass, Johnson Pass/Granite Creek, Placer River/Skookum Valley.
American Mountain Guides Associtaion Special Use Permit Request
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
11/2011 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: American Mountain Guides Association has applied for a new special use permit to conduct training for professional ski mountaineering guides in the Eagle Glacier/Crow Pass area and Turnagain Pass in March or April annually on the Glacier District.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. Turnagain Pass and Eagle Glacier/Crow Pass Area.
East Sixmile Road Fish Habitat Improvements and Stream Bank Restoration
CE
- Wildlife, Fish, Rare plants  Developing Proposal
Est. Scoping Start 09/2011 
Expected:11/2011  07/2012 John Lang
907-228-7719
jslang@fs.fed.us 
Description: Restore and protect salmon spawning and rearing habitat and continue to provide dispersed recreation access.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T7N. , R1E, S06 SM. MP 62 Seward Highway. FS Route 4000425, near East Sixmile Creek.
IdidaRide Sled Dog Tours, Inc., Outfitter/Guide Proposal
CE
- Special use management  Developing Proposal
Est. Scoping Start 10/2011 
Expected:11/2011  12/2011 Teresa Paquet
907-754-2314
tpaquet@fs.fed.us 
Description: Proposal is to authorize sled dog tours at Turnagain Pass area (west & east side of Sew Hwy). Requesting multi-year permit to operate Nov - July (snow dependent), 200 service days, two 2 mile routes, staging at east & west reststops
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. Turnagain Pass Recreation Area Seward Hwy mm 67 & mm 68.
Kings River Prospect
CE
- Minerals and Geology  Completed  Actual: 08/04/2011  09/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Prospecting in the dry gravels of the Kings River and its tributaries with a four inch suction dredge and accessing by jet skiff or ATV.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T 4 N R 4 E Sec. 5,6,8,9,10, T 4 N R 3 E Sec. 1, T 5 N R 3 E Sec. 25, 36. Kings River at the head of Kings Bay in Prince William Sound.
Malone Road Fish Habitat Improvements and Stream Bank Restoration
CE
- Wildlife, Fish, Rare plants  Developing Proposal
Est. Scoping Start 09/2011 
Expected:11/2011  06/2012 John Lang
907-228-7719
jslang@fs.fed.us 
Description: Restore and protect salmon spawning and rearing habitat and decommission an illegal access road.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage. LEGAL - T8N, R3E, Sec 9; S.M. Portage Valley near MP 2 of Portage Glacier Highway.
Private Road Special Use Permit - Paul Malone
CE
- Special use management  In Progress:
Scoping Start 01/22/2010 
Expected:01/2012
 
01/2012 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Mr. Malone is requesting a private road special use permit to authorize the use of an existing road to access his private property in Portage Valley.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T.8 N., R. 3 E., Section 4 SW 1/4 SE 1/4, and Section 9 NW 1/4 NE 1/4. Gravel road starts at the Portage Glacier Highway at approximately MM 1.9 and runs north/south between Alder Pond and the Glacier District Work Center to a point where it meets Explorer Creek.
Scott Shelly Private Road Special Use Permit Renewal
CE
- Special use management  Developing Proposal
Est. Scoping Start 12/2011 
Expected:12/2011  01/2012 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Requesting renewal of 5 year permit #GLA518 which expires 12/31/2011. New permit would authorize continued use of an existing gravel road and gate for the purpose of personal and commercial access to private property in Portage Valley.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage. LEGAL - T8N, R3E, Sec 4 SW1/4 SE1/4, and Sec. 9 NW1/4 NE1/4. Road located south of Portage Glacier Hwy and west of FS Portage Valley Work Center.
Spencer Minerals
EIS
- Minerals and Geology  On Hold  N/A  N/A Keith Menasco
928-774-0594
kmenasco@fs.fed.us 
Description: Project will consider whether or not to authorize removal of mineral materials (rock and gravel aggregate) from a 600-acre site near Spencer Glacier, if so, what restrictions will apply.
Web Link:  http://www.fs.fed.us/r10/chugach/pdf/spencer_extrct_scpltr.pdf
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - The Spencer Mineral Materials site is situated on a glacial outwash plain at the terminus of Spencer Glacier, within the Glacier Ranger District of the Chugach National Forest, Kenai Peninsula Borough. Glacier Ranger District, Kenai Peninsula Borough, Alaska.
University of Alaska, Heath, Physical Education, Recreation Department Special Use Permit Renewal
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
01/2012 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: UAA, HPER Department has applied to renew their special use permit for to conduct outdoor education classes on the Glacier Ranger District. There is no change requested from the current permit, which expires on Dec. 31, 2011.
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage. Turnagain Pass, Summit Lake Area, Crow Pass Trail, Five Fingers, Byron Glacier, Culross Passage.
Wild Alpine Special Use Permit Amendment Request
CE

           *NEW LISTING*
- Special use management  In Progress:
Scoping Start 09/09/2011 
Expected:11/2011
 
11/2011 Katherine Van Massenhove
907-754-2315
kvanmassenhove@fs.fed.us 
Description: Wild Alpine has applied for an amendment to their special use permit. The request is for an additional use area and service days for avalanche courses in Turnagain Pass and ski touring in the Kern Creek drainage area
Location: UNIT - Glacier Ranger District. STATE - Alaska. COUNTY - Anchorage, Kenai Peninsula. Turnagain Pass Silvertip Area, Kern Creek Area.
Back To Top

Chugach National Forest,   Seward Ranger District (excluding Projects occurring in more than one District)

R10 - Alaska Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Bean North Fuel Reduction Project
EA
- Fuels management  Developing Proposal
Est. Scoping Start 10/2011 
Expected:11/2011  03/2012 Amanda Mico
907-288-7724
amico@fs.fed.us 
Description: This area has been identified in the Cooper Landing Community Wildfire Protection Plan. The proposed action is to remove dead and dying spruce trees on 750 acres near the Bean Creek Trail. FAA(3)
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. Cooper Landing, Kenai Peninsula, Alaska.
Betty/Big Rock Mining Plan of Operations
EA
- Minerals and Geology  Completed  Actual: 07/07/2011  08/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Project includes year round suction dredging in Canyon Creek with a four inch suction dredge and the use of existing mining infrastructure. Access will be by foot or ATV on existing trails.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 8 North, Range 1 West, portions of Sections 28 and 33, Seward Meridian. Canyon Creek at about mile 54 of the Seward Hwy.
Cooper Cr. Campground North, Stream Bank Stability
CE
- Wildlife, Fish, Rare plants  Developing Proposal
Est. Scoping Start 07/2011 
Expected:08/2011  09/2011 John Lang
907-228-7719
jslang@fs.fed.us 
Description: Restore approximately 100 linear feet of streambank within the campground.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T5N, R4W, Section 31, SM. Cooper Creek Campground North is located at mile post 51 of the Sterling Highway.
Crescent Creek Mining Plan of Operations
EA

           *NEW LISTING*
- Minerals and Geology  In Progress:
215 Comment Period Legal Notice 08/22/2011 
Expected:10/2011
 
11/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Exploration activities on the benches above Crescent Creek using a four inch or smaller suction dredge/high-banker.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 5 N, Range 2 W, Section 29, Seward Meridian. Crescent Creek off the Quartz Creek road.
Dillon Mining Plan of Operations
CE
- Minerals and Geology  Completed  Actual: 07/07/2011  08/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Plan proposes seasonal placer mining in Cooper and Stetson Creeks with up to a six inch suction dredge and ATV access for approximately three miles on an existing trail
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 4 North, Range 3 West, Sections 7, 8, 17, and 18, Seward Meridian. Approximately three miles up the Stetson Creek trail near Cooper Landing, Alaska.
Heaven's Gate mining plan of operations
EA

           *NEW LISTING*
- Minerals and Geology  In Progress:
215 Comment Period Legal Notice 10/12/2011 
Expected:11/2011
 
05/2012 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Suction dredging (approximately May 1 – Oct 1), dependant on ADF&G habitat permit, in Canyon Creek using a four inch and a two inch suction dredge, access by road vehicle on existing road at Mile 53 Seward Hwy, and ATV access on existing trails
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 8 North, Range 1 West, Portions of Sections 28 and 33, Seward Meridian. Canyon Creek at approximately Mile 53 of the Seward Hwy.
Kenai Lake Work Center East Land Sale
CE
- Facility management  On Hold  N/A  N/A Joshua Milligan
907-224-3374
jmilligan@fs.fed.us 
Description: Sale of approximately 40 acres of National Forest System Lands containing the Kenai Lake Work Center East administrative site pursuant to the Forest Service Facilities Realignment and Enhancement Act of 2005. FAA(3)
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Section 25; T4N, R1W; Seward Meridian. Administrative site on the east side of the Seward Highway at approximately milepost 23.
Lillian L mining plan of operations
EA
- Minerals and Geology  Completed  Actual: 09/01/2011  10/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Exploration consisting of ground sluicing, use of hand tools, metal detectors, and digging test holes on the benches above Quartz Creek Use of a wall tent and temporary bridge spanning Quartz Creek
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 5 North, Range 2 West, Section 3, Seward Meridian. Quartz Creek on the Jerome Lake Road at approximately Mile 39 Seward Hwy.
Martin Creek Mining Plan of Operations
EA

           *NEW LISTING*
- Minerals and Geology  In Progress:
215 Comment Period Legal Notice 08/22/2011 
Expected:10/2011
 
05/2012 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Seasonal (May - Nov) suction dredging in Martin Creek using (2) four inch and (1) two inch suction dredges. Access will be by ATV and on foot on the Lost Lake trail for approximately one to two trips per month.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 2 N, Range 2 W, portions of Sections 22 and 23, Seward Meridian. Martin Creek approximately 2 miles from the Resurrection Pass trail.
McConnell Mining Plan of Operations
CE

           *NEW LISTING*
- Minerals and Geology  In Progress:
Scoping Start 08/26/2011 
Expected:10/2011
 
05/2012 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Seasonal placer mining exploration using an 8 inch trommel fed using hand tools, use of a tent camp, and vehicle access on the Lynx Creek Mine Road.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 7 N, Range 1 E, Section 9, Seward Meridian. Lynx Creek near Johnson Pass North Trailhead.
Mineral Withdrawal Extension - PLO 6884
CE
- Recreation management  In Progress:
Scoping Start 01/08/2010 
Expected:09/2011
 
10/2011 Andrew Schmidt
907-743-9555
ajschmidt@fs.fed.us 
Description: The Forest Service is requesting an extension on the existing mineral withdrawal for another 20 years to protect important recreational resources.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - T5N, R4W, and T4N, R4W; T9N, R1W and T8N, R1W and T8N, R1E and T7N,R1E; Seward Meridian. PLO 6884. Russian River Campground Area, Lower Russion Lake Recreation Area, Kenai River Recreation Area. Total area is approximately 1,855 acres.
Resurrection Creek Restoration Phase II
EIS
- Wildlife, Fish, Rare plants
- Watershed management
- Minerals and Geology 
In Progress:
DEIS NOA in Federal Register 07/23/2010
Est. FEIS NOA in Federal Register 06/2012 
Expected:03/2013
 
06/2013 Joshua Milligan
907-224-3374
jmilligan@fs.fed.us 
Description: Restore Resurrection Creek's channel, floodplain, and streamside vegetation to pre-mining conditions and enhance fish and riparian wildlife habitat. FAA(1)
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. Seward Ranger District, Resurrection Creek.
Russian River Fuel Reduction Project
EA
- Fuels management  On Hold  N/A  N/A Joseph Ford
907-228-4119
jpford@fs.fed.us 
Description: This area has been identified in the Cooper Landing Community Wildfire Protection Plan (CWPP). The proposed action is to thin hardwoods and spruce trees on 263 acres near the Russian River. FAA(3).
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Sec. 33, 34, 35, T5N, R4W; Seward Meridian. Cooper Landing Community Wildfire Protection area, Kenai Peninsula, Alaska.
Toms Family Mining Plan of Operations
EA
- Minerals and Geology  Completed  Actual: 07/07/2011  08/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Project proposes suction dredging in Bear Creek with a four inch or smaller dredge. ATV access for appoximately two miles on the existing trail.
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 9 North, Range 2 West, Section 12, Seward Meridian. Approximately two miles up Bear Creek near Hope, Alaska.
Winters mining plan of operations
CE
- Minerals and Geology  Completed  Actual: 07/07/2011  08/2011 Michael Johnson
907-288-7729
mwjohnson@fs.fed.us 
Description: Suction dredging in Quartz Creek and high-banking on the benches above Quartz Creek, ATV access on exisiting trail for approximately two mile, use of a temporary camp, use of a raft to move equipment across Quartz Creek
Location: UNIT - Seward Ranger District. STATE - Alaska. COUNTY - Kenai Peninsula. LEGAL - Township 5 North, Range 2 West, Portions of Sections 9 and 10, S.M. Approximately mile 40 Sterling Hwy.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD).

To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.