Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 09/2012 |
Expected:10/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bartlett Mountain Land Exchange CE |
- Land ownership management |
Developing Proposal Est. Scoping Start 04/2013 |
Expected:07/2013 | 08/2013 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: Land exchange: an approximately 100 acre WMNF parcel in Berlin, NH would become Society for Protection of NH Forests (SPNHF) property and an approximately 100 acre SPNHF parcel in Bartlett, NH would become part of the WMNF.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=34055 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Carroll, Coos. Land to become WMNF: approximately 100 acres adjacent to NFS lands on Bartlett Mt in Bartlett, NH ; Land to become SPNHF: approximately 100 acres within Jericho Mt. State Park in Berlin, NH. | |||||
|
Forest-wide Outfitter & Guide Conversions CE |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:01/2013 | 02/2013 |
Sarah LaPlante 603-536-6237 slaplante@fs.fed.us |
| Description: In accordance with changes in national policy, all Outfitter & Guide permits (currently 1 year temporary permits on the WMNF) will be issued as 10 year permits. Operating plans and proposed itineraries will still require annual Forest approval.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=36351 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. Forest-wide outfitters and guides. | |||||
|
Waterville Valley Municipal Water Supply Special Use Permit CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 08/27/2012 |
Expected:12/2012 |
08/2012 |
Jennifer Edmonds 802-767-4261 x. 529 jedmonds@fs.fed.us |
| Description: Special use permit to allow Town of Waterville Valley to install a municipal water supply well, fence with locked gate, electrical service with instrumentation and controls, water transmission main and electrical service from well to WMNF boundary.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=37086 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. Waterville Valley. | |||||
| Back To Top | |||||
White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
19 Mile Brook Trail Reroute CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2012 | 01/2013 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Two reroutes totaling 350' to put trail above flood height; may include rock steps and waterbars. New bridge over an unnamed tributary to 19 Mile Brook to replace washed-out bridge. Removal of remnants of old bridge and rehab old trail tread. | |||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. LEGAL - Green's Grant, NH. 19 Mile Brook Trail. | |||||
|
Albany South Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Watershed management - Road management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2013 | 02/2015 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation, watershed and transportation system improvements.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39614 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. Town of Stoneham, Oxford County, ME. | |||||
|
Cutler River Drainage Bridge Replacement CE |
- Recreation management |
In Progress: Scoping Start 04/01/2012 |
Expected:10/2012 |
11/2012 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Replace 5 bridges in the Cutler River Drainage identified as undersized and damaged. All to be replaced in same locations. Bridges allow access to Tuckerman and Huntington Ravines by the general public and Mount Washington Avalanche Center staff
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=37962 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Pinkhams Grant & Sargents Purchase. | |||||
|
Glen Ellis Falls Day Use Area Site Improvement Project EA |
- Recreation management - Heritage resource management - Watershed management - Facility management |
In Progress: 215 Comment Period Legal Notice 10/20/2011 |
Expected:04/2013 |
05/2014 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: This project proposes to repair many of the facilities--including the access road, parking, picnic sites, trails, signage and toilets--at this popular day use area.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=33106 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Glen Ellis Falls Day Use Area. | |||||
|
Godfrey Dam Solar Panel Array CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2012 | 01/2013 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Update special use permit to allow installation of a 9-panel solar array on a single pole mount that will be placed on a 6' by 6' concrete pad. Array would be placed adjacent to an existing storage shed at the Godfrey Dam site. | |||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Godfrey Dam. | |||||
|
Maple Syrup Tree Tapping Permit EA *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2012 | 01/2013 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: 5-year special use permit to place several hundred taps in sugar maple trees on 75 acres and use of existing old skid roads for tapping effort. | |||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Town of Randolph. | |||||
|
Pond of Safety Accessible Trail & Shoreline Access Hardening CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2012 | 01/2013 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Replace user created trail from designated parking lot to canoe launch with accessible trail along an existing road prism and harden shore using riprap to limit erosion. May include a small (3' square) landing to allow easier canoe access. | |||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Pond of Safety, Randolph, NH. | |||||
|
WavePoint Communication Cable Installation CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:12/2012 | 01/2013 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Special use permit to allow Wavepoint to install communication cables in an existing underground conduit and on existing utility poles for about 9 miles through Pinkham Notch. Installation is part of the Network New Hampshire Now Project. | |||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Carroll, Coos. Pinkham Notch along NH Route 16. | |||||
|
Wild River Roadside Vegetation Management EA |
- Forest products - Vegetation management (other than forest products) - Road management |
On Hold | N/A | N/A |
Jeffrey Williams 603-466-2713 x206 jeffreyjwilliams@fs.fed.us |
| Description: Remove hazard trees and improve forest stand conditions along 6.3 miles of the Wild River Road (Forest Road 12). Harvest timber within a designated roadside risk management zone of 100 feet on either side of Wild River Road.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=34794 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Batchelders Grant, Oxford County, Maine. Wild River Road (Forest Road 12). | |||||
| Back To Top | |||||
White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Campton Day Use Area Development Project EA |
- Recreation management - Watershed management - Facility management |
Developing Proposal Est. Scoping Start 09/2012 |
Expected:04/2013 | 10/2013 |
Tom Giles 603-536-6102 tjgiles@fs.fed.us |
| Description: Convert the former Campton Group Campground into a day use area with approved features and amenities. The Pemigewasset Ranger District will host a public meeting to solicit input on conceptual plans currently under development.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39515 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Former site of Campton Group Campground on the south side of Route 49 in Campton and Thornton, NH. | |||||
|
Eastside Road and Trail Repairs EA |
- Recreation management - Road management |
In Progress: 215 Comment Period Legal Notice 07/30/2012 |
Expected:10/2012 |
11/2012 |
Stacy Lemieux 603-536-6222 slemieux@fs.fed.us |
| Description: Repair damage from Tropical Storm Irene including replacing culverts, relocating approx. 0.5 mile or road/trail away from the river and decommissioning existing segment, replacing large culvert that washed out with a bridge, and other maintenance.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=37899 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Eastside Road at Lincoln Woods Visitor Center. | |||||
|
Greeley Ponds and Flume Brook Trails Project EA |
- Recreation management - Watershed management |
Developing Proposal Est. Scoping Start 10/2012 |
Expected:01/2013 | 06/2013 |
Justin Preisendorfer 603-536-6105 jpreisendorfer@fs.fed.us |
| Description: This project will address damage to the hiking trail network in the greater Greeley Ponds and Flume Brook areas from Tropical Storm Irene in August 2011.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39646 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. South of Greeley Ponds in the towns of Waterville Valley and Livermore, NH. | |||||
|
Green Peak Expansion and Trail Construction at Waterville Valley Ski Resort EA |
- Recreation management - Special use management |
In Progress: Scoping Start 12/23/2011 Est. 215 Comment Period Legal Notice 12/2012 |
Expected:03/2013 |
06/2013 |
Sarah LaPlante 603-536-6237 slaplante@fs.fed.us |
| Description: Construct ski trails, a glade area, a lift, and snowmaking equipment and relocate one building on Green Peak. All activities are within the Special Use Permit boundary and the ski area's accepted Master Development Plan.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=36652 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Green Peak Waterville Valley Ski Area, Town of Waterville Valley. | |||||
|
Lakes of the Clouds Propane Rack Relocation CE *NEW LISTING* |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:02/2013 | 05/2013 |
Justin Preisendorfer 603-536-6105 jpreisendorfer@fs.fed.us |
| Description: This project proposes to move the propane rack associated with the Appalachian Mountain Club's Lakes of the Clouds Hut to a location that is less visible to the public. This will better conceal the rack and improve visual aesthetics of the area.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=40368 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Coos. Near the Ammonoosuc Ravine Trail and Lakes of the Clouds Hut on the southern slope of Mt. Washington in the alpine zone. | |||||
|
Lincoln Woods Road/Trail Repair EA |
- Recreation management - Watershed management |
Developing Proposal Est. Scoping Start 12/2012 |
Expected:03/2013 | 05/2013 |
Tom Giles 603-536-6102 tjgiles@fs.fed.us |
| Description: Determine how best to address tread and riverbank instability from Tropical Storm Irene. May include road/trail reroute, log jam removal in a side-channel, drainage improvement, and/or in-stream work to stabilize the riverbank and existing route.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39648 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Lincoln Woods Trail along the East Branch of the Pemi River. | |||||
|
Loon Mountain Beginner Area at South Mountain EA |
- Land management planning - Recreation management - Special use management |
Developing Proposal Est. Scoping Start 12/2012 |
Expected:10/2013 | 12/2013 |
Joseph Gill 603-466-2713 x221 jgill@fs.fed.us |
| Description: Allow the construction of one fixed grip chairlift and approximately 25 acres of new beginner ski terrain and expansion of snowmaking to new area with existing water. Approx. 60% of the lift and ski terrain would be on National Forest System lands. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Lincoln, NH. Loon Mountain Ski Area. | |||||
|
Northern Pass Transmission Line Special Use Permit EIS |
- Special use management |
In Progress: NOI in Federal Register 02/11/2011 Est. DEIS NOA in Federal Register 03/2013 |
Expected:10/2013 |
04/2014 |
Tiffany Benna 603-536-6241 tbenna@fs.fed.us |
| Description: Northern Pass LLC has proposed a new power transmission line in NH that would cross the WMNF. US Dep't of Energy is leading NEPA analysis. WMNF decision is whether to issue a special use permit, consistent with the Forest Plan, to cross the Forest
Web Link: http://www.northernpasseis.us/ |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Existing transmission corridor crossing WMNF in Easton, Lincoln, and Woodstock, NH. | |||||
|
Pemi Northwest Project EA |
- Recreation management - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: Scoping Start 05/12/2011 Est. 215 Comment Period Legal Notice 10/2012 |
Expected:02/2013 |
08/2013 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: This project proposes vegetation management and improvements to wildlife habitat, recreation and watershed resources.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=34713 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Towns of Benton, Easton, Woodstock and Landaff, NH. | |||||
|
Permanent Toilet Installation at Osceola Trailhead and Rumney Main Cliff Parking Lot CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:02/2013 | 05/2013 |
Ryan Twomey 603-536-6103 rtwomey@fs.fed.us |
| Description: These two high use sites have known human waste issues. As a temporary measure, portable toilets are currently at each site. Permanemt toilets are a long-term solution to address high use and existing human waste concerns.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=40369 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Rumney Rocks Day Use Area in Rumney, NH and Osceola Trailhead in Waterville Valley, NH. | |||||
|
Rumney Rocks Management Project Supplemental Analysis and Decision EA |
- Recreation management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:01/2013 | 04/2013 |
Tom Giles 603-536-6102 tjgiles@fs.fed.us |
| Description: Update Environmental Assessment for Rumney Rocks project to include removal of rocks necessary to construct trail parallel to Buffalo Road by mechanical means or possibly by controlled blasting. Other trail work was covered in 2009 Decision Notice.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=38661 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Rumney Rocks Climbing Area, Buffalo Road, Rumney, NH. | |||||
|
Tripoli Road Campsite Relocation and Roadside Hazard Tree Removal Project EA |
- Recreation management - Watershed management |
In Progress: Scoping Start 12/15/2010 Est. 215 Comment Period Legal Notice 04/2013 |
Expected:08/2013 |
10/2013 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=31039 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley. | |||||
| Back To Top | |||||
White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Dindorf Right of Way clearing and associated skid trail use CE |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Minerals and Geology - Land ownership management - Land acquisition - Special use management |
On Hold | N/A | N/A |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Issue permit to allow private landowner to clear his undeveloped ROW across NFS land and construct short skid trail on NF from the ROW corridor to his landing location to reduce resource impacts from skidding and eliminate impacts to Davis Path Trail
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=38214 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Harts Location, Lots 55, 58, 60 and 65, adjacent to State Highway 302, in "Notchland". | |||||
|
Hart's Location Embankment Reconstruction Permitting Project CE *NEW LISTING* |
- Special use management | Completed | Actual: 09/18/2012 | 10/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: The Town of Hart's Location has applied for a permit to reconstruct and maintain a damaged rock berm that protects a campground infrastructure along Rt. 302. The decision is whether to issue a permit. FEMA and NH DOT are involved in providing funding
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39959 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Hart's Location, along the west bank fo the Saco River, a distince of 250 feet. | |||||
|
Meserve Brook Watershed Restoration CE |
- Wildlife, Fish, Rare plants - Watershed management |
Developing Proposal Est. Scoping Start 11/2012 |
Expected:03/2013 | 06/2013 |
Kathleen Starke 603-447-5448 kstarke@fs.fed.us |
| Description: Restoration of aquatic and riparian habitat in and adjacent to Lower Meserve Brook | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Jackson Township, Carroll County, New Hampshire. Lower Meserve Brook , Jackson, NH. | |||||
|
Nancy Pond Trail Repair CE |
- Recreation management | Completed | Actual: 07/30/2012 | 05/2013 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: Three trail washouts of over 400 feet require repair or short relocation following Tropical Storm Irene. Repair will include native rock waterbars, check dams, and rock steps. Relocations of up to 1/2 mile total may be needed where trail is missing. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll, Grafton. A section of trail in both Carroll and Grafton Counties, where the trail follows nearby and crosses Nancy Brook. The upper section borders and enters Nancy Pond Scenic Area. | |||||
|
Neuts Brook Snowmobile Trail Relocation Project CE |
- Recreation management |
Developing Proposal Est. Scoping Start 06/2013 |
Expected:10/2013 | 12/2013 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Relocate the existing snowmobile trail to the edge of the Forest Service administrative site and onto an existing Bartlett Water Precinct easement, eliminating safety concerns associated with the current loop that bisects the administrative site.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=34515 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. The trail relocation is within Bartlett Experimental Forest, will construct one bridge across Neuts brook adjacent to the Site, and use a Bartlett waterline easement corridor to reconnect the trail. | |||||
|
Pine Bend Brook Trail Repair Project CE |
- Recreation management | Completed | Actual: 07/30/2012 | 10/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Tropical Storm Irene related erosion in several locations caused trail damage and a need for repair to stop further erosion and prevent multiple user-created by-passes. Repair includes waterbars, checkdams, and short relocations of < 200 feet. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Pine Bend Brook Trail begins along the Kancamagus Highway approximately 1 mile west of Sabbaday Falls Day Use Area. | |||||
|
Province Integrated Resource Management Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Road management |
In Progress: Scoping Start 07/03/2012 Est. 215 Comment Period Legal Notice 03/2013 |
Expected:06/2013 |
02/2014 |
Desiree Johnston 603-447-5448 dajohnston@fs.fed.us |
| Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation and transportation system improvements.
Web Link: http://data.ecosystem-management.org/nepaweb/nepa_project_exp.php?project=39435 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Town of Chatham, Carroll County, New Hampshire. | |||||
|
Sabbaday Falls Trail Repair CE |
- Recreation management | Completed | Actual: 07/27/2012 | 08/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Two spots damaged by Tropical Storm Irene need stabilization to prevent further erosion/slumping. Trail will be moved into hillside to move it away from slump for total of about 200 feet. Rock will be used at both sites to armor slope or riverbank. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Sabbaday Falls site is approximately 10 miles west of Conway, adjacent to the Kancamagus Highway. This restoration project is located at Sabbaday Falls Day Use Area trail to the falls. The day use area and trail would be closed during the project, which is along the Kancamagus Highway. | |||||
|
Sabbaday Trail Repair Project CE |
- Recreation management | Completed | Actual: 07/30/2012 | 08/2012 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: Several eroded gullies of 2-20 feet require in-tread erosion control, rock work, & other repairs. Three sections of 100-300 feet require more intensive repair work. One eroded crossing needs a short relocation to cross the brook at a new location . | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Proposed trail work starts at milepoint 0.3 and continues intermittently along trail sections near Sabbaday Brook through to mile point 3.8. | |||||
|
Signal Ridge Trail Repair Project CE |
- Recreation management | Completed | Actual: 07/30/2012 | 08/2012 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: This trail was damaged by Tropical Storm Irene. In-tread repair of tread & steps is needed as well as drainage repairs using rock waterbars and check dams . Three short sections will require minor relocation where pieces of trail were washed out. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Signal Ridge Trailhead begins on Sawyer River Road in Livermore, NH, The trail ascends Signal Ridge to summit at the top of Mt. Carrigain. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||