Schedule of Proposed Actions (SOPA)
07/01/2012 to 09/30/2012
White Mountain National Forest

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Report Contents (click to jump to a section) :
Projects Occurring Nationwide
R9 - Eastern Region, White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest)
R9 - Eastern Region, White Mountain National Forest,  Androscoggin Ranger District (excluding Projects occurring in more than one District)
R9 - Eastern Region, White Mountain National Forest,  Pemigewasset Ranger District (excluding Projects occurring in more than one District)
R9 - Eastern Region, White Mountain National Forest,  Saco Ranger District (excluding Projects occurring in more than one District)

Projects Occurring Nationwide  

 
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Gypsy Moth Management in the United States: A Cooperative Approach
EIS
- Vegetation management (other than forest products)  In Progress:
DEIS NOA in Federal Register 09/19/2008
Est. FEIS NOA in Federal Register 10/2012 
Expected:10/2012
 
01/2013 Noel Schneeberger
610-557-4121
nschneeberger@fs.fed.us 
Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link:  http://www.na.fs.fed.us/wv/eis/
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide.
Land Management Planning Rule
EIS
- Regulations, Directives, Orders  Completed  Actual: 03/23/2012  08/2012 Brenda Halter-Glenn
202-260-9400
bhalterglenn@fs.fed.us 
Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link:  http://www.fs.usda.gov/planningrule
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule.
Back To Top

White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest)  

R9 - Eastern Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Bartlett Mountain Land Exchange
CE
- Land ownership management  Developing Proposal
Est. Scoping Start 07/2012 
Expected:09/2012  10/2012 Kori Marchowsky
603-536-6108
kmarchowsky@fs.fed.us 
Description: Land exchange: an approximately 100 acre WMNF parcel in Berlin, NH would become Society for Protection of NH Forests (SPNHF) property and an approximately 100 acre SPNHF parcel in Bartlett, NH would become part of the WMNF.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34055
Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Carroll, Coos. Land to become WMNF: approximately 100 acres adjacent to NFS lands on Bartlett Mt in Bartlett, NH ; Land to become SPNHF: approximately 100 acres within Jericho Mt. State Park in Berlin, NH.
Campground Concessionaire Special Use Permit
CE
- Recreation management
- Special use management 
Completed  Actual: 05/21/2012
03/20/2012 
01/2013 Sarah LaPlante
603-536-6237
slaplante@fs.fed.us 
Description: Administrative action to reissue campground concessionaire permit for 23 WMNF campgrounds and day use sites beginning January 2013 because term on existing permit expires. Decision withdrawn due to national court ruling on CEs to allow 30-day comment
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36470
Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. 23 campgrounds and day use sites across the White Mountain National Forest.
Forest-wide Outfitter & Guide Conversions
CE
- Recreation management
- Special use management 
Developing Proposal
Est. Scoping Start 07/2012 
Expected:09/2012  10/2012 Sarah LaPlante
603-536-6237
slaplante@fs.fed.us 
Description:  In accordance with changes in national policy, all Outfitter & Guide permits (currently 1 year temporary permits on the WMNF) will be issued as 10 year permits. Operating plans and proposed itineraries will still require annual Forest approval.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36351
Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. Forest-wide outfitters and guides.
Waterville Valley Municipal Water Supply Special Use Permit
CE
- Special use management  In Progress:
Scoping Start 12/20/2011
Est. 215 Comment Period Legal Notice 08/2012 
Expected:12/2012
 
08/2012 Jennifer Edmonds
802-767-4261 x. 529
jedmonds@fs.fed.us 
Description: Special use permit to allow Town of Waterville Valley to install a municipal water supply well, fence with locked gate, electrical service with instrumentation and controls, water transmission main and electrical service from well to WMNF boundary.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37086
Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. Waterville Valley.
Back To Top

White Mountain National Forest,   Androscoggin Ranger District (excluding Projects occurring in more than one District)

R9 - Eastern Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
19 Mile Brook Trail Temporary Reroute
CE
- Recreation management  Cancelled  N/A  N/A Jacob Lubera
603-466-2713 x224
jlubera@fs.fed.us 
Description: Bridge destroyed by Tropical Storm Irene. Propose to install temporary step-stone crossing 500' upstream from bridge site and rock staircase to old road prism to link to trail. Cancelled because relocation upstream deemed unnecessary.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37961
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. 19 Mile Brook Trail, Greens Grant, NH.
Albany South Project
EA

           *NEW LISTING*
- Recreation management
- Wildlife, Fish, Rare plants
- Forest products
- Watershed management
- Road management 
Developing Proposal
Est. Scoping Start 10/2012 
Expected:12/2014  05/2015 Kori Marchowsky
603-536-6108
kmarchowsky@fs.fed.us 
Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation, watershed and transportation system improvements.
Location: UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. Town of Stoneham, Oxford County, ME.
Cutler River Drainage Bridge Replacement
CE
- Recreation management  In Progress:
Scoping Start 04/01/2012 
Expected:06/2012
 
07/2012 Thomas Moore
603-466-2713 x226
tmmoore@fs.fed.us 
Description: Replace 5 bridges in the Cutler River Drainage identified as undersized and damaged. All to be replaced in same locations. Bridges allow access to Tuckerman and Huntington Ravines by the general public and Mount Washington Avalanche Center staff
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37962
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Pinkhams Grant & Sargents Purchase.
Glen Ellis Falls Day Use Area Site Improvement Project
EA
- Recreation management
- Heritage resource management
- Watershed management
- Facility management 
In Progress:
215 Comment Period Legal Notice 10/20/2011 
Expected:08/2012
 
04/2013 Kori Marchowsky
603-536-6108
kmarchowsky@fs.fed.us 
Description: This project proposes to repair many of the facilities--including the access road, parking, picnic sites, trails, signage and toilets--at this popular day use area.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33106
Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Glen Ellis Falls Day Use Area.
Wild River Roadside Vegetation Management
EA
- Forest products
- Vegetation management (other than forest products)
- Road management 
On Hold  N/A  N/A Jeffrey Williams
603-466-2713 x206
jeffreyjwilliams@fs.fed.us 
Description: Remove hazard trees and improve forest stand conditions along 6.3 miles of the Wild River Road (Forest Road 12). Harvest timber within a designated roadside risk management zone of 100 feet on either side of Wild River Road.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34794
Location: UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Batchelders Grant, Oxford County, Maine. Wild River Road (Forest Road 12).
Back To Top

White Mountain National Forest,   Pemigewasset Ranger District (excluding Projects occurring in more than one District)

R9 - Eastern Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Campton Day Use Area Development Project
EA

           *NEW LISTING*
- Recreation management
- Watershed management
- Facility management 
Developing Proposal
Est. Scoping Start 09/2012 
Expected:04/2013  10/2013 Tom Giles
603-536-6102
tjgiles@fs.fed.us 
Description: Convert the former Campton Group Campground into a day use area with approved features and amenities. The Pemigewasset Ranger District will host a public meeting to solicit input on conceptual plans currently under development.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39515
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Former site of Campton Group Campground on the south side of Route 49 in Campton and Thornton, NH.
Eastside Road/Trail Repairs
EA
- Recreation management
- Road management 
Developing Proposal
Est. Scoping Start 07/2012 
Expected:09/2012  11/2012 Stacy Lemieux
603-536-6222
slemieux@fs.fed.us 
Description: Repair damage from Tropical Storm Irene including replacing a culvert, relocating approx. 0.5 mile or road/trail away from the river and decommissioning existing segment, replacing large culvert that washed out with a bridge, and other maintenance.
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Eastside Road at Lincoln Woods Visitor Center.
Greeley Ponds and Flume Brook Trails Project
EA

           *NEW LISTING*
- Recreation management
- Watershed management 
Developing Proposal
Est. Scoping Start 09/2012 
Expected:11/2012  06/2013 Justin Preisendorfer
603-536-6105
jpreisendorfer@fs.fed.us 
Description: This project will address damage to the hiking trail network in the greater Greeley Ponds and Flume Brook areas from Tropical Storm Irene in August 2011.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39646
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. South of Greeley Ponds in the towns of Waterville Valley and Livermore, NH.
Green Peak Expansion and Trail Construction at Waterville Valley Ski Resort
EA
- Recreation management
- Special use management 
In Progress:
Scoping Start 12/23/2011
Est. 215 Comment Period Legal Notice 09/2012 
Expected:12/2012
 
02/2013 Sarah LaPlante
603-536-6237
slaplante@fs.fed.us 
Description: Construct ski trails, a glade area, a lift, and snowmaking equipment and relocate one building on Green Peak. All activities are within the Special Use Permit boundary and the ski area's accepted Master Development Plan.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36652
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Green Peak Waterville Valley Ski Area, Town of Waterville Valley.
Lincoln Woods Road/Trail Repair
EA

           *NEW LISTING*
- Recreation management
- Watershed management 
Developing Proposal
Est. Scoping Start 09/2012 
Expected:12/2012  02/2013 Stacy Lemieux
603-536-6222
slemieux@fs.fed.us 
Description: Determine how best to address tread and riverbank instability from Tropical Storm Irene. May include road/trail reroute, log jam removal in a side-channel, drainage improvement, and/or in-stream work to stabilize the riverbank and existing route.
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Lincoln Woods Trail along the East Branch of the Pemi River.
Loon Mountain Adventure Park
CE
- Recreation management
- Special use management 
Completed  Actual: 05/25/2012  06/2012 Joseph Gill
603-466-2713 x221
jgill@fs.fed.us 
Description: Establish ropes course for various difficulty levels in an existing tree skiing area, including <0.5 acres of NF land. No ground disturbance or tree removal expected on NF; some limbs would be cut. Platforms attached via cables; no nails or anchors.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38556
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Loon Mountain Resort, Lincoln, NH.
Loon Mountain Beginner Area at South Mountain
EA
- Land management planning
- Recreation management
- Special use management 
Developing Proposal
Est. Scoping Start 08/2012 
Expected:06/2013  08/2013 Joseph Gill
603-466-2713 x221
jgill@fs.fed.us 
Description: Allow the construction of one fixed grip chairlift and approximately 25 acres of new beginner ski terrain and expansion of snowmaking to new area with existing water. Approx. 60% of the lift and ski terrain would be on National Forest System lands.
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Lincoln, NH. Loon Mountain Ski Area.
Northern Pass Transmission Line Special Use Permit
EIS
- Special use management  In Progress:
NOI in Federal Register 02/11/2011
Est. DEIS NOA in Federal Register 03/2013 
Expected:10/2013
 
04/2014 Tiffany Benna
603-536-6241
tbenna@fs.fed.us 
Description: Northern Pass LLC has proposed a new power transmission line in NH that would cross the WMNF. US Dep't of Energy is leading NEPA analysis. WMNF decision is whether to issue a special use permit, consistent with the Forest Plan, to cross the Forest
Web Link:  http://www.northernpasseis.us/
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Existing transmission corridor crossing WMNF in Easton, Lincoln, and Woodstock, NH.
Pemi Northwest Project
EA
- Recreation management
- Forest products
- Vegetation management (other than forest products)
- Fuels management
- Watershed management
- Road management 
In Progress:
Scoping Start 05/12/2011
Est. 215 Comment Period Legal Notice 09/2012 
Expected:01/2013
 
04/2013 Kori Marchowsky
603-536-6108
kmarchowsky@fs.fed.us 
Description: This project proposes vegetation management and improvements to wildlife habitat, recreation and watershed resources.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34713
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Towns of Benton, Easton, Woodstock and Landaff, NH.
Rumney Rocks Management Project Supplemental Analysis and Decision
EA
- Recreation management  Developing Proposal
Est. Scoping Start 09/2012 
Expected:10/2012  04/2013 Tom Giles
603-536-6102
tjgiles@fs.fed.us 
Description: Update Environmental Assessment for Rumney Rocks project to include removal of rocks necessary to construct trail parallel to Buffalo Road by mechanical means or possibly by controlled blasting. Other trail work was covered in 2009 Decision Notice.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38661
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Rumney Rocks Climbing Area, Buffalo Road, Rumney, NH.
Trails 19a and 23/23a at Waterville Valley Ski Resort
CE
- Recreation management
- Special use management 
Cancelled  N/A  N/A Thomas Paquette
802-767-4261 x 521
tpaquette@fs.fed.us 
Description: Construct Trails 19a and 23/23a, which were included in the 1999 accepted Master Development Plan. These trails, on Mt. Tecumseh, would connect the existing Psyched and Valley Run trails.
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Waterville Valley, NH. Waterville Valley Ski Resort.
Tripoli Road Campsite Relocation and Roadside Hazard Tree Removal Project
EA
- Recreation management
- Watershed management 
In Progress:
Scoping Start 12/15/2010
Est. 215 Comment Period Legal Notice 11/2012 
Expected:02/2013
 
04/2013 Kori Marchowsky
603-536-6108
kmarchowsky@fs.fed.us 
Description: Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31039
Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley.
Back To Top

White Mountain National Forest,   Saco Ranger District (excluding Projects occurring in more than one District)

R9 - Eastern Region  
Project Name Project Purpose Planning Status Decision Expected Implementation Project Contact
Champney Falls Parking Lot Expansion
CE
- Recreation management  Cancelled  N/A  N/A Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Expand parking area for Champney Falls and Bolles Trails
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Town of Albany, Carroll County, NH. Champney Falls parking lot is located along Kancamagus National Scenic Byway (NH Route112).
Dindorf Right of Way clearing and associated skid trail use
CE
- Forest products
- Vegetation management (other than forest products)
- Fuels management
- Watershed management
- Minerals and Geology
- Land ownership management
- Land acquisition
- Special use management 
On Hold  N/A  N/A Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Issue permit to allow private landowner to clear his undeveloped ROW across NFS land and construct short skid trail on NF from the ROW corridor to his landing location to reduce resource impacts from skidding and eliminate impacts to Davis Path Trail
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38214
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Harts Location, Lots 55, 58, 60 and 65, adjacent to State Highway 302, in "Notchland".
Meserve Brook Watershed Restoration
CE
- Wildlife, Fish, Rare plants
- Watershed management 
Developing Proposal
Est. Scoping Start 10/2012 
Expected:02/2013  06/2013 Kathleen Starke
603-447-5448
kstarke@fs.fed.us 
Description: Restoration of aquatic and riparian habitat in and adjacent to Lower Meserve Brook
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Jackson Township, Carroll County, New Hampshire. Lower Meserve Brook , Jackson, NH.
Nancy Pond Trail Repair
CE
- Recreation management  In Progress:
Scoping Start 04/02/2012 
Expected:06/2012
 
07/2012 Jana Johnson
603-447-5448 (106)
janajohnson@fs.fed.us 
Description: Three trail washouts of over 400 feet require repair or short relocation following Tropical Storm Irene. Repair will include native rock waterbars, check dams, and rock steps. Relocations of up to 1/2 mile total may be needed where trail is missing.
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll, Grafton. A section of trail in both Carroll and Grafton Counties, where the trail follows nearby and crosses Nancy Brook. The upper section borders and enters Nancy Pond Scenic Area.
Neuts Brook Snowmobile Trail Relocation Project
CE
- Recreation management  Developing Proposal
Est. Scoping Start 08/2012 
Expected:12/2012  12/2012 Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Relocate the existing snowmobile trail to the edge of the Forest Service administrative site and onto an existing Bartlett Water Precinct easement, eliminating safety concerns associated with the current loop that bisects the administrative site.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34515
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. The trail relocation is within Bartlett Experimental Forest, will construct one bridge across Neuts brook adjacent to the Site, and use a Bartlett waterline easement corridor to reconnect the trail.
Pine Bend Brook Trail Repair Project
CE
- Recreation management  In Progress:
Scoping Start 04/01/2012 
Expected:06/2012
 
06/2012 Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Tropical Storm Irene related erosion in several locations caused trail damage and a need for repair to stop further erosion and prevent multiple user-created by-passes. Repair includes waterbars, checkdams, and short relocations of < 200 feet.
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Pine Bend Brook Trail begins along the Kancamagus Highway approximately 1 mile west of Sabbaday Falls Day Use Area.
Province Integrated Resource Management Project
EA

           *NEW LISTING*
- Recreation management
- Wildlife, Fish, Rare plants
- Forest products
- Vegetation management (other than forest products)
- Road management 
Developing Proposal
Est. Scoping Start 06/2012 
Expected:06/2013  02/2014 Desiree Johnston
603-447-5448
dajohnston@fs.fed.us 
Description: An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation and transportation system improvements.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39435
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Town of Chatham, Carroll County, New Hampshire.
Sabbaday Falls Trail Repair
CE
- Recreation management  In Progress:
Scoping Start 04/02/2012 
Expected:06/2012
 
06/2012 Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Two spots damaged by Tropical Storm Irene need stabilization to prevent further erosion/slumping. Trail will be moved into hillside to move it away from slump for total of about 200 feet. Rock will be used at both sites to armor slope or riverbank.
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Sabbaday Falls site is approximately 10 miles west of Conway, adjacent to the Kancamagus Highway. This restoration project is located at Sabbaday Falls Day Use Area trail to the falls. The day use area and trail would be closed during the project, which is along the Kancamagus Highway.
Sabbaday Trail Repair Project
CE
- Recreation management  In Progress:
Scoping Start 04/02/2012 
Expected:06/2012
 
06/2012 Jana Johnson
603-447-5448 (106)
janajohnson@fs.fed.us 
Description: Several eroded gullies of 2-20 feet require in-tread erosion control, rock work, & other repairs. Three sections of 100-300 feet require more intensive repair work. One eroded crossing needs a short relocation to cross the brook at a new location .
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Proposed trail work starts at milepoint 0.3 and continues intermittently along trail sections near Sabbaday Brook through to mile point 3.8.
Sawyer River Bridge Replacement
CE
- Special use management
- Road management 
Completed  Actual: 06/04/2012  06/2012 Rodney Wilson
603-447-5448 (120)
rmwilson@fs.fed.us 
Description: Issuance of a Special Use Permit to New Hampshire Department of Transportation to construct a bridge crossing over the Sawyer River on State Route 302.
Web Link:  http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38860
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. NH State Route 302, Hart's Location, NH.
Signal Ridge Trail Repair Project
CE
- Recreation management  In Progress:
Scoping Start 04/01/2012 
Expected:06/2012
 
06/2012 Jana Johnson
603-447-5448 (106)
janajohnson@fs.fed.us 
Description: This trail was damaged by Tropical Storm Irene. In-tread repair of tread & steps is needed as well as drainage repairs using rock waterbars and check dams . Three short sections will require minor relocation where pieces of trail were washed out.
Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Signal Ridge Trailhead begins on Sawyer River Road in Livermore, NH, The trail ascends Signal Ridge to summit at the top of Mt. Carrigain.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD).

To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.