Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R9 - Eastern Region, White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R9 - Eastern Region, White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 12/2011 |
Expected:03/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders | Completed | Actual: 03/23/2012 | 12/2011 |
Brenda Halter-Glenn 202-260-9400 bhalterglenn@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders | Completed | Actual: 12/13/2011 | 01/2012 |
Glen Stein 801-200-2703 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Massabesic Demonstration Project EA |
- Research and Development |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:09/2012 | 08/2013 |
Jonathan Janelle 603-868-7628 jjanelle@fs.fed.us |
| Description: This project is to provide a forest demonstration area for natural resource professionals and educators. The site will enable forest professionals to bring groups of land owners and students to see firsthand a variety of silvicultural practices. | |||||
| Location: UNIT - White Mountain National Forest All Units, Massabesic All Units. STATE - Maine. COUNTY - York. The project will take place in York County Maine in the town of Alfred. | |||||
| Back To Top | |||||
White Mountain National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bartlett Mountain Land Exchange CE |
- Land ownership management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:09/2012 | 10/2012 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: Land exchange: an approximately 100 acre WMNF parcel in Berlin, NH would become Society for Protection of NH Forests (SPNHF) property and an approximately 100 acre SPNHF parcel in Bartlett, NH would become part of the WMNF.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34055 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Carroll, Coos. Land to become WMNF: approximately 100 acres adjacent to NFS lands on Bartlett Mt in Bartlett, NH ; Land to become SPNHF: approximately 100 acres within Jericho Mt. State Park in Berlin, NH. | |||||
|
Campground Concessionaire Special Use Permit CE |
- Recreation management - Special use management |
Completed | Actual: 03/20/2012 | 01/2013 |
Sarah LaPlante 603-536-6237 slaplante@fs.fed.us |
| Description: Administrative action to reissue a campground concessionaire permit for 23 WMNF campgrounds and day use sites beginning January 2013 because term on existing permit expires.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36470 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. 23 campgrounds and day use sites across the White Mountain National Forest. | |||||
|
Forest-wide Outfitter & Guide Conversions CE |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:09/2012 | 10/2012 |
Sarah LaPlante 603-536-6237 slaplante@fs.fed.us |
| Description: In accordance with changes in national policy, all Outfitter & Guide permits (currently 1 year temporary permits on the WMNF) will be issued as 10 year permits. Operating plans and proposed itineraries will still require annual Forest approval.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36351 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - Maine, New Hampshire. COUNTY - Oxford, Carroll, Coos, Grafton. Forest-wide outfitters and guides. | |||||
|
Waterville Valley Municipal Water Supply Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 12/20/2011 |
Expected:08/2012 |
08/2012 |
Jennifer Edmonds 802-767-4261 x. 529 jedmonds@fs.fed.us |
| Description: Special use permit to allow Town of Waterville Valley to install a municipal water supply well, fence with locked gate, electrical service with instrumentation and controls, water transmission main and electrical service from well to WMNF boundary.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37086 |
|||||
| Location: UNIT - White Mountain National Forest All Units. STATE - New Hampshire. COUNTY - Grafton. Waterville Valley. | |||||
| Back To Top | |||||
White Mountain National Forest, Androscoggin Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
19 Mile Brook Trail Temporary Reroute CE |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Jacob Lubera 603-466-2713 x224 jlubera@fs.fed.us |
| Description: Bridge destroyed by Tropical Storm Irene. Propose to install temporary step-stone crossing 500' upstream from bridge site and ock staircase to old road prism to link to trail. Will propose larger trail relocation w/ permanent crossing in future.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37961 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. 19 Mile Brook Trail, Greens Grant, NH. | |||||
|
Cutler River Drainage Bridge Replacement CE |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:04/2012 | 05/2012 |
Thomas Moore 603-466-2713 x226 tmmoore@fs.fed.us |
| Description: Replace 5 bridges in the Cutler River Drainage identified as undersized and damaged. These bridges allow for access to Tuckerman and Huntington Ravines by the general public and Mount Washington Avalanche Center staff.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37962 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Pinkhams Grant & Sargents Purchase. | |||||
|
Glen Ellis Falls Day Use Area Site Improvement Project EA |
- Recreation management - Heritage resource management - Watershed management - Facility management |
In Progress: 215 Comment Period Legal Notice 10/20/2011 |
Expected:04/2012 |
09/2012 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: This project proposes to repair many of the facilities--including the access road, parking, picnic sites, trails, signage and toilets--at this popular day use area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33106 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - New Hampshire. COUNTY - Coos. Glen Ellis Falls Day Use Area. | |||||
|
Wild River Roadside Vegetation Management EA |
- Forest products - Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:06/2012 | 10/2012 |
Jeffrey Williams 603-466-2713 x206 jeffreyjwilliams@fs.fed.us |
| Description: Remove hazard trees and improve forest stand conditions along 6.3 miles of the Wild River Road (Forest Road 12). Harvest timber within a designated roadside risk management zone of 100 feet on either side of Wild River Road.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34794 |
|||||
| Location: UNIT - Androscoggin Ranger District. STATE - Maine. COUNTY - Oxford. LEGAL - Batchelders Grant, Oxford County, Maine. Wild River Road (Forest Road 12). | |||||
| Back To Top | |||||
White Mountain National Forest, Pemigewasset Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Eastside Road/Trail and Pine Island Trail Repairs CE |
- Recreation management - Road management |
Developing Proposal Est. Scoping Start 05/2012 |
Expected:06/2012 | 08/2012 |
Justin Preisendorfer 603-536-6105 jpreisendorfer@fs.fed.us |
| Description: Repair damage from T.S. Irene including replacing a culvert, 0.43 mile reroute out of floodplain, replacing large culvert with a bridge, and other maintenance on ES Road/Trail; reestablish 0.25 miles of Pine Island Trail & drainage/tread maintenance. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Eastside Road at Lincoln Woods Visitor Center. | |||||
|
Green Peak Expansion and Trail Construction at Waterville Valley Ski Resort EA |
- Recreation management - Special use management |
In Progress: Scoping Start 12/23/2011 Est. 215 Comment Period Legal Notice 06/2012 |
Expected:09/2012 |
11/2012 |
Sarah LaPlante 603-536-6237 slaplante@fs.fed.us |
| Description: Construct ski trails, a glade area, a lift, and snowmaking equipment and relocate one building on Green Peak. All activities are within the Special Use Permit boundary and the ski area's accepted Master Development Plan.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36652 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Green Peak Waterville Valley Ski Area, Town of Waterville Valley. | |||||
|
Loon Mountain Adventure Park CE *NEW LISTING* |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Joseph Gill 603-466-2713 x221 jgill@fs.fed.us |
| Description: Establish ropes course for various difficulty levels in an existing tree skiing area, including <0.25 acres of NF land. No ground disturbance or tree removal needed on NF; some limbs would be cut. Platforms attached via cables; no nails or anchors. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Loon Mountain Resort, Lincoln, NH. | |||||
|
Loon Mountain Beginner Area at South Mountain EA |
- Land management planning - Recreation management - Special use management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:04/2013 | 06/2013 |
Joseph Gill 603-466-2713 x221 jgill@fs.fed.us |
| Description: Allow the construction of one fixed grip chairlift and approximately 25 acres of new beginner ski terrain and expansion of snowmaking to new area with existing water. Approx. 60% of the lift and ski terrain would be on National Forest System lands. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Lincoln, NH. Loon Mountain Ski Area. | |||||
|
Northern Pass Transmission Line Special Use Permit EIS |
- Special use management |
In Progress: NOI in Federal Register 02/11/2011 Est. DEIS NOA in Federal Register 03/2013 |
Expected:10/2013 |
04/2014 |
Tiffany Benna 603-536-6241 tbenna@fs.fed.us |
| Description: Northern Pass LLC has proposed a new power transmission line in NH that would cross the WMNF. US Dep't of Energy is leading NEPA analysis. WMNF decision is whether to issue a special use permit, consistent with the Forest Plan, to cross the Forest
Web Link: http://www.northernpasseis.us/ |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Existing transmission corridor crossing WMNF in Easton, Lincoln, and Woodstock, NH. | |||||
|
Pemi Northwest Project EA |
- Recreation management - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: Scoping Start 05/12/2011 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:10/2012 |
02/2013 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: This project proposes vegetation management and improvements to wildlife habitat, recreation and watershed resources.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34713 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Towns of Benton, Easton, Woodstock and Landaff, NH. | |||||
|
Rumney Rocks Management Project Supplemental Analysis and Decision EA *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 05/2012 |
Expected:06/2012 | 09/2012 |
Tom Giles 603-536-6102 tjgiles@fs.fed.us |
| Description: Update Environmental Assessment for Rumney Rocks project to include removal of rocks necessary to construct trail parallel to Buffalo Road by mechanical means or possibly by controlled blasting. Other trail work was covered in 2009 Decision Notice. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Rumney Rocks Climbing Area, Buffalo Road, Rumney, NH. | |||||
|
Trails 19a and 23/23a at Waterville Valley Ski Resort CE |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:06/2012 | 07/2012 |
Thomas Paquette 802-767-4261 x 521 tpaquette@fs.fed.us |
| Description: Construct Trails 19a and 23/23a, which were included in the 1999 accepted Master Development Plan. These trails, on Mt. Tecumseh, would connect the existing Psyched and Valley Run trails. | |||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. LEGAL - Waterville Valley, NH. Waterville Valley Ski Resort. | |||||
|
Tripoli Road Campsite Relocation and Roadside Hazard Tree Removal Project EA |
- Recreation management - Watershed management |
In Progress: Scoping Start 12/15/2010 Est. 215 Comment Period Legal Notice 09/2012 |
Expected:01/2013 |
05/2013 |
Kori Marchowsky 603-536-6108 kmarchowsky@fs.fed.us |
| Description: Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31039 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley. | |||||
|
Waterville Valley Super G Racecourse Project CE |
- Recreation management - Special use management |
Completed | Actual: 03/05/2012 | 08/2012 |
Jennifer Edmonds 802-767-4261 x. 529 jedmonds@fs.fed.us |
| Description: Widen sections of three existing alpine ski trails to meet the specifications of FIS (International Ski Federation) and USSA (US Ski and Snowboard Association) to hold world class Super Giant Slalom race series.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36472 |
|||||
| Location: UNIT - Pemigewasset Ranger District. STATE - New Hampshire. COUNTY - Grafton. Waterville Valley Alpine Ski Area. | |||||
| Back To Top | |||||
White Mountain National Forest, Saco Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bartlett Experimental Forest Admin Site - Snowmobile Trail Relocation Project CE *NEW LISTING* |
- Recreation management | Cancelled | N/A | N/A |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: This is an accidental duplicate listing. See Neuts Brook Snowmobile Trail Relocation project. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Bartlett, NH, at and within a short distance of the FS administrative facility and the Bartlett Water Precinct easement. | |||||
|
Champney Falls Parking Lot Expansion CE |
- Recreation management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:08/2012 | 05/2013 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Expand parking area for Champney Falls and Bolles Trails | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Town of Albany, Carroll County, NH. Champney Falls parking lot is located along Kancamagus National Scenic Byway (NH Route112). | |||||
|
Dindorf Right of Way clearing and associated skid trail use CE *NEW LISTING* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Minerals and Geology - Land ownership management - Land acquisition - Special use management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Issue permit to allow private landowner to clear his undeveloped ROW across NFS land and construct short skid trail on NF from the ROW corridor to his landing location to reduce resource impacts from skidding and eliminate impacts to Davis Path Trail | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. Harts Location, Lots 55, 58, 60 and 65, adjacent to State Highway 302, in "Notchland". | |||||
|
Meserve Brook Watershed Restoration CE |
- Wildlife, Fish, Rare plants - Watershed management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 07/2012 |
Kathleen Starke 603-447-5448 kstarke@fs.fed.us |
| Description: Restoration of aquatic and riparian habitat in and adjacent to Lower Meserve Brook | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Jackson Township, Carroll County, New Hampshire. Lower Meserve Brook , Jackson, NH. | |||||
|
Nancy Pond Trail Repair CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: Three trail washouts of over 400 feet require repair or short relocation following Tropical Storm Irene. Repair will include native rock waterbars, check dams, and rock steps. Relocations of up to 1/2 mile total may be needed where trail is missing. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll, Grafton. A section of trail in both Carroll and Grafton Counties, where the trail follows nearby and crosses Nancy Brook. The upper section borders and enters Nancy Pond Scenic Area. | |||||
|
Neuts Brook Snowmobile Trail Relocation Project CE |
- Recreation management |
Developing Proposal Est. Scoping Start 08/2012 |
Expected:12/2012 | 12/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Relocate the existing snowmobile trail to the edge of the Forest Service administrative site and onto an existing Bartlett Water Precinct easement, eliminating safety concerns associated with the current loop that bisects the administrative site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34515 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. The trail relocation is within Bartlett Experimental Forest, will construct one bridge across Neuts brook adjacent to the Site, and use a Bartlett waterline easement corridor to reconnect the trail. | |||||
|
Northeast Swift Integrated Resource Management Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Watershed management - Road management |
Completed | Actual: 02/23/2012 | 05/2012 |
Desiree Johnston 603-447-5448 x128 dajohnston@fs.fed.us |
| Description: An integrated resource project that considers activities to move the NE Swift HMU toward the desired condition through timber, wildlife habitat, recreation, fisheries and aquatic management, road improvements or decommissioning, and other activities.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28840 |
|||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. North of Swift River, East of Douglas Brook. | |||||
|
Pine Bend Brook Trail Repair Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Tropical Storm Irene related erosion in several locations caused trail damage and a need for repair to stop further erosion and prevent multiple user-created by-passes. Repair includes waterbars, checkdams, and short relocations of < 200 feet. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Pine Bend Brook Trail begins along the Kancamagus Highway approximately 1 mile west of Sabbaday Falls Day Use Area. | |||||
|
Sabbaday Falls Trail Repair CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Two spots damaged by Tropical Storm Irene need stabilization to prevent further erosion/slumping. Trail will be moved into hillside to move it away from slump for total of about 200 feet. Rock will be used at both sites to armor slope or riverbank. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. LEGAL - Sabbaday Falls site is approximately 10 miles west of Conway, adjacent to the Kancamagus Highway. This restoration project is located at Sabbaday Falls Day Use Area trail to the falls. The day use area and trail would be closed during the project, which is along the Kancamagus Highway. | |||||
|
Sabbaday Trail Repair Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: Several eroded gullies of 2-20 feet require in-tread erosion control, rock work, & other repairs. Three sections of 100-300 feet require more intensive repair work. One eroded crossing needs a short relocation to cross the brook at a new location . | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Proposed trail work starts at milepoint 0.3 and continues intermittently along trail sections near Sabbaday Brook through to mile point 3.8. | |||||
|
Sawyer River Bridge Replacement CE *NEW LISTING* |
- Special use management - Road management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:06/2012 | 06/2012 |
Rodney Wilson 603-447-5448 (120) rmwilson@fs.fed.us |
| Description: Issuance of a Special Use Permit to New Hampshire Department of Transportation to construct a bridge crossing over the Sawyer River on State Route 302. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. NH State Route 302, Hart's Location, NH. | |||||
|
Signal Ridge Trail Repair Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 06/2012 |
Jana Johnson 603-447-5448 (106) janajohnson@fs.fed.us |
| Description: This trail was damaged by Tropical Storm Irene. In-tread repair of tread & steps is needed as well as drainage repairs using rock waterbars and check dams . Three short sections will require minor relocation where pieces of trail were washed out. | |||||
| Location: UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Grafton. Signal Ridge Trailhead begins on Sawyer River Road in Livermore, NH, The trail ascends Signal Ridge to summit at the top of Mt. Carrigain. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||