Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R8 - Southern Region, Occurring in more than one Forest (excluding Regionwide) - R8 - Southern Region, Francis Marion and Sumter National Forests, Occurring in more than one District (excluding Forestwide) - R8 - Southern Region, Francis Marion and Sumter National Forests, Andrew Pickens Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Francis Marion and Sumter National Forests, Enoree Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Francis Marion and Sumter National Forests, Francis Marion Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, Francis Marion and Sumter National Forests, Long Cane Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 12/2011 |
Expected:03/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 05/13/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R8 - Southern Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Managing Recreation Uses in the Upper Segment of the Chattooga Wild and Scenic River Corridor EA |
- Land management planning - Recreation management |
In Progress: Notice of Initiation 12/09/2010 |
Expected:02/2012 |
02/2012 |
Mary Morrison 803-561-4058 mwmorrison@fs.fed.us |
| Description: Consider whether to amend forest plans for three national forests (GA, NC & SC) re: recreation on the upper segment of the Chattooga River. Previous comments will be considered.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34061 |
|||||
| Location: UNIT - Chattooga River Ranger District, Nantahala Ranger District, Andrew Pickens Ranger District. STATE - Georgia, North Carolina, South Carolina. COUNTY - Rabun, Oconee, Jackson, Macon. The project area is located north of SC Highway 28 on the upper 21 miles of the Chattooga Wild and Scenic River. | |||||
| Back To Top | |||||
Francis Marion and Sumter National Forests, Occurring in more than one District (excluding Forestwide) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Berkeley County Road Improvements and Powerline Relocation EA |
- Special use management - Road management |
In Progress: Scoping Start 06/23/2011 Est. 215 Comment Period Legal Notice 12/2011 |
Expected:02/2012 |
03/2012 |
Amy Fore 843-887-3257 ext 19 afore@fs.fed.us |
| Description: Berkeley County is proposing to acquire public road easements and do road improvements across four existing roads that pass through portions of the Francis Marion NF. In addition, Berkeley Electric would relocate portions of its powerlines.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35704 |
|||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley. Roads Involved: Mitchum Town Road,Green Bay Road, Spring Pond Road, Calestown Road. | |||||
|
Berkeley Electric Cooperative Permit Renewal CE |
- Special use management |
In Progress: Scoping Start 01/16/2008 |
Expected:05/2012 |
07/2012 |
Amy Fore 843-887-3257 afore@fs.fed.us |
| Description: Renew existing special use permit and amendments to provide electric utility services to rural customers in Charleston and Berkeley Counties, South Carolina.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=25266 |
|||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley, Charleston. LEGAL - Francis Marion National Forest, Charleston and Berkeley counties, South Carolina. Districtwide, Francis Marion National Forest. | |||||
|
Central Electric Power Coop - McClellanville 115 Kv Line EIS |
- Special use management |
In Progress: NOI in Federal Register 09/17/2010 Est. DEIS NOA in Federal Register 06/2012 |
Expected:12/2012 |
03/2013 |
Amy Fore 843-887-3257 afore@fs.fed.us |
| Description: Construct and install a 115 KV powerline from Winyah Generating Station (Georgetown, SC) to McClellanville, SC.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=5499 |
|||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley, Charleston. LEGAL - NE section of Francis Marion National Forest. Francis Marion National Forest. | |||||
| Back To Top | |||||
Francis Marion and Sumter National Forests, Andrew Pickens Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
AP Loblolly Pine Removal and Restoration Project EIS |
- Wildlife, Fish, Rare plants - Forest products |
In Progress: NOI in Federal Register 03/08/2010 Est. DEIS NOA in Federal Register 03/2012 |
Expected:07/2012 |
10/2012 |
Victor Wyant 864-638-9568 vwyant@fs.fed.us |
| Description: The project would restore native vegetation in stands currently composed of non-native loblolly pine. The intent is to restore native species and habitats, increase diversity and viability of plant and animals in the long term.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28634 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. LEGAL - The AP Native Vegetation Restoration is a district wide project, and includes approximately 40 compartments located across the Andrew Pickens Ranger District in Oconee County, South Carolina. The project is located in the Andrew Pickens RD, Sumter National Forest, Region 8. | |||||
|
Cane Restoration and Management CE |
- Heritage resource management - Wildlife, Fish, Rare plants |
Completed | Actual: 11/17/2011 | 01/2012 |
Jeff Magniez 803-637-5396 jmagniez@fs.fed.us |
| Description: Restore and manage giant cane (Arundinaria gigantea) along the Chattooga River. Purpose of project is to restore the canebrake plant community, improve wildlife habitat and provide giant cane as a cultural resource for the Cherokee people.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36546 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. Along the Chattooga River. | |||||
|
Oconee County Broadband Proposal CE |
- Special use management | Completed | Actual: 09/29/2011 | 10/2011 |
Victor Wyant 864-638-9568 vwyant@fs.fed.us |
| Description: Oconee County is proposing installing a broadband line that will follow major highways, county roads and some USFS roads connecting emergency services and remote locations together.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34662 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. LEGAL - It's a commercial special use permit proposal that will follow major highways, county roads and some USFS roads connecting emergency services and remote locations together. Oconee County. | |||||
|
Outfitting and Guiding Special Use Permit EA |
- Recreation management - Special use management |
On Hold | N/A | N/A |
Greg Borgen 864-638-9568 gborgen@fs.fed.us |
| Description: The US Forest Service is proposing to grant outfitting and guiding special use permits to businesses on the Andrew Pickens Ranger District, Sumter National Forest in South Carolina.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33706 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. Andrew Pickens Ranger District and Chattooga Wild and Scenic River Corridor on the Chattahoochee National Forest in Georgia. | |||||
|
Rocky Gap Trail Rehabilitation CE |
- Recreation management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:03/2012 | 06/2012 |
Greg Borgen 864-638-9568 gborgen@fs.fed.us |
| Description: This project would reroute, or close various degraded portions of the Rocky Gap equestrian and hiking trail in the Whetstone area. Minor trail additions would also be created as connectors to the existing trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=4953 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. LEGAL - Andrew Pickens Ranger District, Oconee County, South Carolina. Between Earls Ford Road, Chattooga Ridge Road, and Fall Creek Road. | |||||
|
Simms Field and Fishermen's Trail Reconstruction Project CE |
- Facility management |
In Progress: Scoping Start 01/05/2011 |
Expected:03/2012 |
06/2012 |
Greg Borgen 864-638-9568 gborgen@fs.fed.us |
| Description: The US Forest Service is proposing to relocate/reconstruct two hiking trails that access the Chattooga River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33690 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. LEGAL - Andrew Pickens Ranger District, Oconee County, South Carolina. The project is located in the Andrew Pickens RD, Sumter NF, Oconee County, SC. Beggining at the end of FSR 709 (Big Bend Rd.). | |||||
|
Southern Appalachian Farmstead Project EA |
- Heritage resource management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:05/2012 | 06/2012 |
Mike Crane 864-638-9568 mcrane@fs.fed.us |
| Description: An application has been received from the Oconee Heritage Center for the development of a living history interpretive site on Highway 28 near the Chattooga River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29475 |
|||||
| Location: UNIT - Andrew Pickens Ranger District. STATE - South Carolina. COUNTY - Oconee. Highway 28 along the Chattooga River. | |||||
| Back To Top | |||||
Francis Marion and Sumter National Forests, Enoree Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Aerial Fertilization of Pine Forest EA |
- Forest products - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:04/2013 | 05/2014 |
Jason Jennings 803-561-4060 jjennings@fs.fed.us |
| Description: Fertilize to improve site productivity on about 6,000 acres of pine forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=1503 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Chester, Newberry, Union. District-wide. | |||||
|
Delta Tract E-50 Tripartite Decision Memo CE |
- Land management planning - Land ownership management - Land acquisition |
In Progress: Scoping Start 11/01/2010 |
Expected:03/2012 |
06/2012 |
Peggy Nadler 803-561-4053 pnadler@fs.fed.us |
| Description: A land-for-timber (tripartite) exchange in which the United States will acquire a non-federal tract of land that would be managed by the US Forest Service. The land tract is located in Union County, South Carolina.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35334 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Union. Delta Plantation Tract E-50, Union County, South Carolina. | |||||
|
Dunaway Waterfowl Area Improvements EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:01/2013 | 08/2013 |
Jeff Magniez 803-637-5396 jmagniez@fs.fed.us |
| Description: Thin approximately 70 acres in Compartment 13 to increase hardmast production and construct dike (500 feet long by 10 feet high) to increase floodable area by about 11 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=23476 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Union. Compartment 13. | |||||
|
Enoree R-O-W Vegetation Restoration CE |
- Vegetation management (other than forest products) - Road management |
Completed | Actual: 11/03/2011 | 03/2012 |
Jay Swafford 864-427-9858 jswafford@fs.fed.us |
| Description: to restore native vegetation along Forest Service road rights-of-way on the Enoree Ranger District, Francis Marion- Sumter National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36782 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Chester, Fairfield, Laurens, Newberry, Union. LEGAL - Sumter National Forest, Enoree Ranger District, Union, Laurens, Fairfield, Newberry, and Chester Counties. Region 8, Francis Marion-Sumter National Forest, Enoree Ranger District. | |||||
|
Enoree River - 336A Access Point Reconstruction CE |
- Recreation management - Watershed management |
Completed | Actual: 11/01/2011 | 02/2012 |
Alice Riddle (864)427-9858 ariddle@fs.fed.us |
| Description: Reconstruct primitive access point along road 336A on the Enoree River. Provide a safe access point for the public and repair resource damage that is occuring at the site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29379 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Laurens. End of FS Rd. 336A in Laurens County. | |||||
|
Enoree River Riparian Wetland Restoration Project CE |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 08/15/2011 |
Expected:03/2012 |
05/2012 |
Jason Jennings 803-561-4060 jjennings@fs.fed.us |
| Description: Proposal to restore three riparian wetland areas on the Enoree Ranger District, Francis Marion-Sumter National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36811 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Newberry. LEGAL - Enoree Ranger District, Newberry County, Whitmire, SC,. R8, Francis Marion-Sumter NF, Enoree Ranger District, Newberry County, Whitmire, SC. | |||||
|
FY 2012 Buncombe Trail Relocation Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:05/2012 | 06/2012 |
Alice Riddle (864)427-9858 ariddle@fs.fed.us |
| Description: Relocate portions of the trail that are poorly located and causing erosion problems into nearby creeks and streams. | |||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Newberry. LEGAL - Enoree Ranger District, Sumter National Forest, Newberry County. Trailhead is located on Forest Service Road 358. Approximately 5 miles east of the town Joanna, on Highway 66. | |||||
|
FY 2012 Enoree OHV Trail Expansion Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:04/2012 | 08/2012 |
Alice Riddle (864)427-9858 ariddle@fs.fed.us |
| Description: Layout, design, & construct an additional 2 to 4 miles of motorized trail to the Enoree OHV Trail. | |||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Laurens. LEGAL - Enoree Ranger District of Sumter National Forest. Enoree OHV Trail is located on the Garlington School Road, Laurens County. | |||||
|
Giant Cane Restoration Project CE *NEW LISTING* |
- Land management planning - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
In Progress: Scoping Start 12/05/2011 |
Expected:01/2012 |
02/2012 |
Carrie Miller 864-427-9858 carriemmiller@fs.fed.us |
| Description: The Enoree R.D. is proposing the restoration of native giant cane along the Tyger River.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37592 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Union. LEGAL - Compartment 33, Stand 9, Union County, South Carolina. Sumter National Forest, Enoree Ranger District, Union, South Carolina. | |||||
|
River Access Reconstruction Work CE |
- Recreation management | Cancelled | N/A | N/A |
Alice Riddle (864)427-9858 ariddle@fs.fed.us |
| Description: Reconstruct and improve river access points along the Tyger, Enoree and Broad Rivers. Stabilize and repair erosion and sedimentation problems.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=15855 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Chester, Fairfield, Laurens, Newberry, Union. End of Forest Service Road 323, approximately 100 feet to Tyger River. | |||||
|
Woodlands Management in the Indian Creek Wildlife Habitat Restoration Initiative Area EA |
- Wildlife, Fish, Rare plants |
In Progress: 215 Comment Period Legal Notice 07/22/2011 |
Expected:04/2012 |
06/2012 |
Jeff Magniez 803-637-5396 jmagniez@fs.fed.us |
| Description: This project proposes woodland, grassland, savanna and meadow establishment and maintenance in the Indian Creek area of the district. This includes forest thinning and herbicide treatments.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=23478 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Newberry. Compartments 124, 125, 126, 146, 147, 148 and 149. | |||||
|
Woods Ferry Horse Trail Relocation and Construction Project CE |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:05/2012 | 06/2012 |
Alice Riddle (864)427-9858 ariddle@fs.fed.us |
| Description: Project proposal would relocate some sections of the existing trail that are not sustainable or in a good location. Additional new trail construction would be added to the Woods Ferry Horse Trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35500 |
|||||
| Location: UNIT - Enoree Ranger District. STATE - South Carolina. COUNTY - Chester. Chester County, Enoree Ranger District, Sumter National Forest. | |||||
| Back To Top | |||||
Francis Marion and Sumter National Forests, Francis Marion Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Brian Richardson Easement CE |
- Special use management |
In Progress: Scoping Start 08/19/2011 |
Expected:02/2012 |
03/2012 |
Amy Fore 843-336-3248 afore@fs.fed.us |
| Description: Easement across National Forest lands in Berkeley County SC to TMS 2560000063. Located in Compartment 113 the easement requested is approximately 20 feet wide by 35 feet long. | |||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley. LEGAL - Tract F 258 Berkeley County, South Carolina. Compartment 113 easement site connects Cainhoy Rd and Lands owned by Brian Richardson (TMS2560000063). | |||||
|
Coastal Expeditions Outfitter Guide Special Use Renewal CE |
- Special use management |
In Progress: Scoping Start 09/14/2011 |
Expected:12/2011 |
01/2012 |
Amy Fore 843-336-3248 afore@fs.fed.us |
| Description: Renew a five year Special Use Permit for Coastal Expeditions to canoe/kayak specific waterways on the Francis Marion National Forest and utilize boat launches within the forest. | |||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley, Charleston. LEGAL - Charleston and Berkeley counties South Carolina. Various creeks and boat launches within the Francis Marion National Forest. | |||||
|
Nature Adventures Outfitter Guide Permit Renewal CE |
- Special use management |
In Progress: Scoping Start 09/14/2011 |
Expected:12/2011 |
01/2012 |
Amy Fore 843-336-3248 afore@fs.fed.us |
| Description: Renew outfitter guide permit for a five year period to canoe/kayak, hike, bike and camp on Francis Marion National Forest. | |||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Berkeley, Charleston. LEGAL - Francis Marion National Forest, portions of Charleston and Berkeley counties. Designated roads, trails, boat landings and campsites on the Francis Marion Ranger District. | |||||
|
USFWS Special Use Permit Amendment 2 (WAM000901) CE |
- Special use management | Completed | Actual: 09/27/2011 | 10/2011 |
Amy Fore 843-336-3248 afore@fs.fed.us |
| Description: Add two travelways to existing permit to continue access to permitted Red Wolf enclosures. Forest Road 5158 1,208 feet; and existing woods road, 2,113 feet. | |||||
| Location: UNIT - Francis Marion Ranger District. STATE - South Carolina. COUNTY - Charleston. LEGAL - Charleston County, SC Tract F 92. Compartment 212, Francis Marion National Forest. | |||||
| Back To Top | |||||
Francis Marion and Sumter National Forests, Long Cane Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Aiken Coop EDG402401 CE |
- Special use management |
In Progress: Scoping Start 06/23/2009 |
Expected:02/2012 |
03/2012 |
Elizabeth Meadows 803-637-5396 emeadows@fs.fed.us |
| Description: Renewal of permit for overhead and underground electric lines.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29354 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Edgefield, McCormick, Saluda. Long Cane Ranger District. | |||||
|
Bakers Dozen Race CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 01/24/2011 |
Expected:02/2012 |
04/2012 |
Glen Kansanback (803)637-5396 gkansanback@fs.fed.us |
| Description: Organized bicycle race using existing system bicycle trails. | |||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Edgefield. Lick Fork Lake Horn Creek Bicycle Trail. | |||||
|
Cuffytown Timber Sale Project EA |
- Forest products |
In Progress: 215 Comment Period Legal Notice 06/08/2011 |
Expected:01/2012 |
04/2012 |
Cordero France 803-637-5396 cdfrance@fs.fed.us |
| Description: Vegetation treatments in the form of thinnings, seed tree regenerations, loblolly pine removal and woodland establishment on approximately 3,125 acres of national forest system land.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33366 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Greenwood, McCormick. LEGAL - Compartments 264, 348 and 349. McCormick and Greenwood Counties, South Carolina. | |||||
|
Cunningham ROW Native Vegetation Enhancement CE *NEW LISTING* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 11/17/2011 |
Expected:02/2012 |
07/2012 |
Jeff Magniez 803-637-5396 jmagniez@fs.fed.us |
| Description: Till and no-till methods would be used to plant native vegetation on approximately 16 acres of utility ROWs to benefit game and non-game wildlife species.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37529 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - McCormick. Compartments 282 and 283. | |||||
|
Cyper First Thinning Project EA |
- Forest products - Vegetation management (other than forest products) |
In Progress: 215 Comment Period Legal Notice 08/12/2011 |
Expected:03/2012 |
04/2012 |
Dell Frost 803-637-5396 dfrost@fs.fed.us |
| Description: First thinning of approximately 3,154 acres of loblolly pine poletimber.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33432 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Abbeville, Edgefield, Greenwood, McCormick, Saluda. Goldmine,Rocky, Lower Turkey Creek, Little Mtn., Liberty Hill, Renew and Horn Creek Analysis Areas. | |||||
|
Davis Land Exchange CE |
- Wildlife, Fish, Rare plants - Land ownership management |
In Progress: Scoping Start 09/28/2009 |
Expected:03/2012 |
04/2012 |
Peggy Nadler 803-561-4053 pnadler@fs.fed.us |
| Description: The Forest Service is proposing to acquire 1,588 acres from Davis Land and Timber, Inc. in exchange for 1,436 acres of federal lands. Land use would remain essentially the same on the two land tracts.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35882 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Edgefield, McCormick. The tracts are located in Hard Labor Creek, Cuffytown Creek, Beaverdam Creek and Turkey Creek, east and southeast of McCormick, SC. | |||||
|
Dixie Pipeline EDG400501 CE |
- Special use management |
In Progress: Scoping Start 06/23/2009 |
Expected:12/2011 |
01/2012 |
Elizabeth Meadows 803-637-5396 emeadows@fs.fed.us |
| Description: Permit for renewal of petroleum pipeline.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29355 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Edgefield, McCormick. Long Cane Ranger District. | |||||
|
Little River LON017 CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2011 |
Expected:02/2012 | 03/2012 |
Elizabeth Meadows 803-637-5396 emeadows@fs.fed.us |
| Description: This action is a renewal of a special use permit for electric powerlines above and below ground.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27394 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Abbeville, Edgefield, Greenwood. Long Cane Ranger. | |||||
|
Reedy Timber Sale Project EA |
- Forest products - Vegetation management (other than forest products) |
In Progress: Scoping Start 09/29/2011 Est. 215 Comment Period Legal Notice 03/2012 |
Expected:07/2012 |
08/2012 |
Reginald Goolsby 803-637-5396 rjgoolsby@fs.fed.us |
| Description: Seed-tree regeneration on 1,350 acres within 13 management compartments | |||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - McCormick. Compartment 222, 226, 227, 234-236, 238-241, 254. | |||||
|
Western Carolina LON016 CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2011 |
Expected:02/2012 | 03/2012 |
Elizabeth Meadows 803-637-5396 emeadows@fs.fed.us |
| Description: Renewal of special use permit for an underground telephone (replacing the existing line with fiber optic cable).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27393 |
|||||
| Location: UNIT - Long Cane Ranger District. STATE - South Carolina. COUNTY - Abbeville, Edgefield, Greenwood. Long Cane RD. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||