Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R8 - Southern Region, National Forests in Alabama, Forestwide (excluding Projects occurring in more than one Forest) - R8 - Southern Region, National Forests in Alabama, Occurring in more than one District (excluding Forestwide) - R8 - Southern Region, National Forests in Alabama, Bankhead Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Conecuh Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Shoal Creek Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Talladega Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Tuskegee Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 10/2012 |
Expected:10/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders | Completed | Actual: 03/23/2012 | 08/2012 |
Brenda Halter-Glenn 202-260-9400 bhalterglenn@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
| Back To Top | |||||
National Forests in Alabama, Forestwide (excluding Projects occurring in more than one Forest) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
NFsAL Enhanced Invasive Plant Control EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Completed | Actual: 06/21/2012 | 07/2012 |
Gary Shurette 334-241-8143 gshurette@fs.fed.us |
| Description: Forest-wide invasive plant control using current techniques, application methods, and risk-assessed herbicides.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37819 |
|||||
| Location: UNIT - National Forests in Alabama All Units. STATE - Alabama. COUNTY - Bibb, Calhoun, Chilton, Clay, Cleburne, Covington, Dallas, Escambia, Franklin, Hale, Lawrence, Macon, Perry, Talladega, Tuscaloosa, Winston. Those sites where invasive species occur - Forest Wide. | |||||
|
NFsAL Indiana Bat Forest Plan Amendment EA *NEW LISTING* |
- Land management planning - Wildlife, Fish, Rare plants |
Developing Proposal Est. Notice of Initiation 08/2012 |
Expected:09/2012 | 11/2012 |
Jeff Gainey 334-241-8166 jgainey@fs.fed.us |
| Description: Forest Plan Amendment to remove FS-106 standard - site specific inventory requirement for Indidana Bat prior to prescribed burning between May 1 and July 1. | |||||
| Location: UNIT - National Forests in Alabama All Units. STATE - Alabama. COUNTY - Bibb, Calhoun, Chilton, Clay, Cleburne, Covington, Dallas, Escambia, Franklin, Hale, Lawrence, Macon, Perry, Talladega, Tuscaloosa, Winston. National Forests in Alabama. | |||||
| Back To Top | |||||
National Forests in Alabama, Occurring in more than one District (excluding Forestwide) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Install Weather Station CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: Erect two new permanent weather stations which will include 20' X 20' chainlink fenced area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32295 |
|||||
| Location: UNIT - Talladega Ranger District, Shoal Creek Ranger District. STATE - Alabama. COUNTY - Clay, Cleburne. LEGAL - Township 13S, Range 11E, Section 18 and Township 21S, Range 5E, Section 34. Terragin Creek Watershed and Hollins WMA along FDR 696. | |||||
| Back To Top | |||||
National Forests in Alabama, Bankhead Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Alabama A&M University Special Use Permit for Hydrological Research CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/21/2012 |
Expected:05/2012 |
05/2012 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Special Use Permit to Alabama A&M University to install sensors to conduct hydrological research on Bankhead National Forest. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T9S, R8W, and T8S, R9W. Bankhead National Forest. | |||||
|
Bankhead National Forest Prescribed Burning Program EA *NEW LISTING* |
- Fuels management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:10/2012 | 11/2012 |
Kerry Clark 205-489-5111 kerryclark@fs.fed.us |
| Description: Prescribed Burning Program beginning in Fiscal Year 2013. Purpose and need is to reduce hazardous fuel loading, improve wildlife habitat, and restore and maintain native ecosystems. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Franklin, Lawrence, Winston. LEGAL - Multiple sections in Townships 7S, 8S, 9S, 10S, 11S, 12S and Ranges 6W, 7W, 8W, 9W. Bankhead National Forest - Forest-wide. | |||||
|
Bankhead National Forest-Wildlife Habitat Improvement-Loblolly Pine Stand Thinning CE |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) |
Completed | Actual: 05/31/2012 | 06/2012 |
William Addison 205-489-5111 waddison@fs.fed.us |
| Description: Commercial thinning of loblolly pine stands in Compartment 148, Stand 17 and Stand 23.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38147 |
|||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Winston. LEGAL - Sections 17 and 20, T11S, R8W. Bankhead National Forest, Black Pond Community, Management Compartment 148. | |||||
|
Commercial Thinning - Rush/Brushy Watershed CE |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 04/28/2012 |
Expected:09/2012 |
10/2012 |
William Addison 205-489-5111 waddison@fs.fed.us |
| Description: Commercially thin 71 stands (2692 acres) of overstocked loblolly pine stands in the Rush/Brushy watershed. The project purpose is to restore native sytems to improve function and resiliency; improve fire regime condition class and wildlife habitat. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T8S, R6W; T8S, R7W; T9S, R7W; T9S R6W; T8S, R8W; T7S, R8W. Bankhead National Forest, Rush/Brushy Watershed. | |||||
|
Drennen Forestry Temporary Special Use Permit - Temporary Right-of-way CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/21/2012 |
Expected:05/2012 |
05/2012 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Temporary Special Use Permit for right-of-way to Drennen Forestry to haul timber on an existing Forest Service road. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Winston. LEGAL - T10 S, R7W, Section 4 and T9S, R7W, Section 33. Moreland Community, Proposed Use off Forest Service Road 121. | |||||
|
Edmond Smith Permanent Easement CE |
- Special use management | Completed | Actual: 01/20/2012 | 03/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Permanent Easement for access to private land
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33945 |
|||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T9S, R8W, S22 & S27. T9S, R8W, S22 & S27. | |||||
|
Horse Trail Route Expansion CE |
- Recreation management | On Hold | N/A | N/A |
Terrance Fletcher 205-489-5111 terrancefletcher@fs.fed.us |
| Description: Add additional miles to Owl Creek Horse Trail | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. Owl Creek Horse Trail. | |||||
|
Manual release of hardwood regeneration CE |
- Vegetation management (other than forest products) | Completed | Actual: 03/21/2012 | 05/2012 |
Jeremy McDonald 205-489-5111 jmcdonald03@fs.fed.us |
| Description: Manually release hardwood saplings from competing and encroaching loblolly pines on 20 acres in two stands.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38187 |
|||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence. LEGAL - Section 1, T8S, R9W; Section 6, T8S, R8W; and Section 31, T7S, R8W. Bankhead National Forest, Management Compartment 101. | |||||
|
Mechanical Fuels Reduction CE |
- Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 05/31/2012 | 06/2012 |
Kerry Clark 205-489-5111 kerryclark@fs.fed.us |
| Description: Mechanically reduce density and continuity of small diameter (understory and midstory) vegetation. The project will reduce fuel loading and is a first step in restoring fire-adapted pine woodlands. The project includes two units and is 380 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38186 |
|||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - Section 26, T8S, R7W; Sections 10 & 15, T12S, R7W. Bankhead National Forest, Clear Creek and Owl Creek Areas. | |||||
|
Owl Creek Trail System - Re-route EA |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:09/2012 | 09/2012 |
Terrance Fletcher 205-489-5111 terrancefletcher@fs.fed.us |
| Description: Owl Creek Trail System re-route and maintenance project | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T8S, R7W. Owl Creek Trail System, Bankhead National Forest. | |||||
|
Reggie Watts Permanent Easement CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 09/22/2010 |
Expected:04/2011 |
04/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Permanent Easement for a driveway | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T10S, R7W, S23. T10S, R7W, S23. | |||||
|
Robert Riddle Easement CE |
- Special use management | Completed | Actual: 05/03/2011 | 03/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Driveway Easement
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=30409 |
|||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - S4, T9S, R9W. S4, T9S, R9W. | |||||
|
Spangler Outfitter/Guide Special Use Permit CE |
- Special use management | Cancelled | N/A | N/A |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Special Use Permit to Curtis Spangler for outfitter/guide service on the Owl Creek Trail System. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - Sections 8 - 34, T8S, R7W. Bankhead National Forest, Owl Creek Trail System. | |||||
|
Special Use Permit Amendment - Lawrence County Commission - Water Line CE *NEW LISTING* |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/21/2012 |
Expected:05/2012 |
05/2012 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Amend a Special Use Permit for the Lawrence County Comission to install a water line along Forest Service Road 213 - Ridge Road. | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence. LEGAL - Sections 14, 23, 24, 27, 32, 33 T7S, R8W; Section 30, T7S, R7W. Forest Service Road 213 right-of-way. | |||||
|
Wilderness Trailheads (Gumpond and Boarden Creek) EA |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 08/17/2005 |
Expected:02/2012 |
03/2012 |
Terrance Fletcher 205-489-5111 terrancefletcher@fs.fed.us |
| Description: Construct and relocate Borden and Braziel Creek trailheads at the Sipsey Wilderness area | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence. LEGAL - S32, T8S, R8W; S12, T8S, R9W. Bankhead National Forest, Borden and Braziel Creek Trailheads. | |||||
| Back To Top | |||||
National Forests in Alabama, Conecuh Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
CNF Prescribe Burns CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 05/15/2008 |
Expected:04/2012 |
10/2012 |
Deborah Foley 334-222-2555 dfoley@fs.fed.us |
| Description: Continued maintenance & restoration of the fire-dependent ecosystem of the Conecuh National Forest through implementation of a systematic controlled burning regime, treating each area at least twice in the next several years. | |||||
| Location: UNIT - Conecuh Ranger District. STATE - Alabama. COUNTY - Covington, Escambia. Pine and pine/hardwood stands across Conecuh National Forest, Covington/Escambia Counties, AL. | |||||
|
Conecuh Shooting Range EA *NEW LISTING* |
- Recreation management | Completed | Actual: 04/17/2012 | 09/2012 |
Deborah Foley 334-222-2555 ext 106 dfoley@fs.fed.us |
| Description: Establish a shooting range near the intersection of Escambia Co (AL) Rds 4 & 11; remove trees as needed for site, parking, and access; thin trees near site for visibility and RCW habitat improvement; amend Forest Plan to change mgt prescription.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39104 |
|||||
| Location: UNIT - Conecuh Ranger District. STATE - Alabama. COUNTY - Escambia. LEGAL - TIN, R13E, Sec 7. Conecuh National Forest, near intersection of Escambia County (AL) Rds 4 and 11, in a 5-acre borrow pit. | |||||
| Back To Top | |||||
National Forests in Alabama, Shoal Creek Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
El Paso Corporation / Southern Natural Gas Special Use Permit Modification for Pesticide Usage EA |
- Special use management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:07/2012 | 06/2013 |
Art Henderson 256-463-2272 x103 dswagner@fs.fed.us |
| Description: Analysis for requested modification of a special use permit, currently held by El Paso Corporation / Southern Natural Gas, to allow for the use of pesticide along existing gas pipeline right-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37894 |
|||||
| Location: UNIT - Shoal Creek Ranger District. STATE - Alabama. COUNTY - Calhoun, Cleburne, Perry. LEGAL - T16S, R10E, S18; T16S, R9E, S12 & 13, 17, 18, 20 in Cleburne & Calhoun counties T21N, R8E, S13;T21N, R9E, S30-32 in Perry County. Right-of-way's through the Oakmulgee and Shoal Creek Ranger Districts. | |||||
| Back To Top | |||||
National Forests in Alabama, Talladega Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bell Springs Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 833 acre prescribed burn unit in the Bell Springs area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33383 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 22, 23, 26, 27 and 34; Township 17s; Range 7e. FS lands west of FSRs 644 and 644C. | |||||
|
FY2012 TLRD Midstory Removal CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
In Progress: Scoping Start 12/06/2011 |
Expected:01/2012 |
07/2012 |
Art Henderson 256-362-2909 arthenderson@fs.fed.us |
| Description: Removal of hardwood midstory on approximately 157 acres of upland pine timber.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37630 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay. Compartment 284 Stands 1, 3 & 5 and Compartment 285 Stand 21. | |||||
|
FY2012 Timber Stand Improvement Project CE *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 06/05/2012 | 06/2012 |
Jonathan Stober 256-463-2272 x 103 dswagner@fs.fed.us |
| Description: Removal undesirable small diameter hardwoods such as red maple, sourwood, sweet gum, poplar, and a few dense patches of pine in planted longleaf pine stands using chainsaws and brush saws.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39125 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Calhoun, Cherokee, Clay, Cleburne, Talladega. LEGAL - (Sec) 01, Township (TWN) 22 South and Range (RNG) 04 East, Sec 04, TWN 18S, RNG 07E, Sec 23 & 34, TWN 17S, RNG 07E, Sec 23, TWN 19S, RNG 06E and Sec 35, TWN 19S, RNG 05E located in Talladega County. 338 acres across 22 stands. | |||||
|
Marlow Branch Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 796 acre prescribed burn umit in the Germany Mtn area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34917 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 23, 25, 26, 35 and 36; Township 19s; Range 5e. FS lands west of CR 234. | |||||
|
Mump Creek Prescribed Burn Addition CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: Add an additional 826 acre block in the SE corner of the existing Mump Creek burn.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34919 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 14, 15, 22, 23 and 26; Township 19s; Range 6e. FS lands west of CR 310 and south of Union Church to CSX RR. | |||||
|
Salt Creek Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 805 acre prescribed burn unit in the Salt Creek area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34927 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 25, 26, 35 and 36; Township 17s; Range 7e. FS lands between CR 486 and FSR 644 west of Salt Creek Church. | |||||
|
Southern Electric Generation Co. - Gaston - Yellow Dirt 230kv TL EA |
- Special use management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:06/2012 | 07/2012 |
Mary Humphries 256-362-2909 x 145 mhumphries@fs.fed.us |
| Description: Renew existing permit along with the replacement of four (4) existing structures and allow the use of herbicides to maintain vegetation on existing easement
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37629 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay, Talladega. Talladega Co - S28 T20S R5E; Clay Co - S25, 26, 27 T20S R5E & S30 T20S R6E. | |||||
|
Talladega Mtn Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 1106 acre prescribed burn unit in the Chandler Springs area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34920 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 26, 27, 33, 34, 35; Township 19s; Range 6e and Section 4; Township 20s; Range 6e. FS lands east of SR 77, north of CR 307, east of Talladega Creek and south of FSR 699. | |||||
|
Talladega Ranger District Road Decommissioning EA *NEW LISTING* |
- Road management |
In Progress: Scoping Start 03/05/2012 Est. 215 Comment Period Legal Notice 06/2012 |
Expected:08/2012 |
09/2012 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: The project would decommision 10 miles of National Forest system and user created roads. The project would also make the following changes to MVUM: Change 9.4 miles of road to seasonal use, add 2.1 miles to seasonal use and remove 3.0 miles of road. | |||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay, Cleburne, Talladega. Talladega Ranger District. | |||||
|
Tree Farm Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 2640 acre prescribed burn unit located west of Turnipseed Camp.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34922 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay. LEGAL - Sections 13-15, 22-24, 25, 26 and 36; Township 18s; Range 7e and Sections 19, 30; Township 18s; Range 8e. FS lands south of Cheaha Creek, north of Hubbard Creek and west of SR 281. | |||||
| Back To Top | |||||
National Forests in Alabama, Tuskegee Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Annual Wildlife Opening Maintenance CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 08/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: We will be bush hogging, disking, fertilizing and planting existing wildlife openings. Some are for the annual Youth Dove Hunt and others as a supplemental food source during the cool weather season. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Selected location within the Tuslegee National Forest. Tuskegee National Forest. | |||||
|
Construction of loop trail at Tsinia CE |
- Recreation management - Facility management |
On Hold | N/A | N/A |
Darrius Truss 334-727-2652 dtruss@fs.fed.us |
| Description: Construct a a one mile interpretative loop trail, complimenting an existing 1/4 mile linear trail. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Control of Woody Vegetation Using Herbicides EA |
- Recreation management - Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 05/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Use of herbicides to control woody vegetation along the cleared limits of forest service roads, including culverts, bridges, trail bridges, boardwalks, trail improvements such as benches, blinds, and access to fishing ponds. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Forest-Wide. Tuskegee National Forest. | |||||
|
Culvert Installation CE |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
On Hold | N/A | N/A |
Jorge Hersel 334-727-2652 jorgehersel@fs.fed.us |
| Description: Install new culvert on FS Road 900, gravel nearby parking area, reduce surface runoff. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Horse Trailhead Parking Area Expansion CE |
- Road management - Facility management - Watershed management - Vegetation management (other than forest products) - Recreation management |
On Hold | N/A | N/A |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Accomodate weekend and holiday overflow parking by getting trucks and trailers off the roadway and increase visitor safety by expanding current parking area | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Pre-Commercial thinning CE |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:03/2011 | 04/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Reduce the number of trees per acre using hand tools, reducing competition, allowing light to reach the forest floor, concentrate available moisture and nutrients to the remaining trees, increasing their vigor and reducing the risk of bark beetles. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - R24E, T17N, Section 11. Tuskegee National Forest. | |||||
|
Release of Advanced Oak Regeneration CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 02/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Release young oak regeneration in an oak-loblolly pine stand using hand tools to reduce competetion for light, moisture and nutrients, improve stand vigor and improve native wildlife food sources for game and non game species. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - R 24E, T17N, Section 1 and R24E T17N, Section 11. Tuskegee National Forest. | |||||
|
Road Maintenance (Daylighting) CE |
- Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 03/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Clear trees and brush 25-30 feet from the center of the roadway, remove any trees which may fall onto the roadway out to 100 feet from the road center. This will reduce maintenance and improve safety of visitors and employees. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Tuskegee National Forest Ownership. Forest-wide. | |||||
|
Road construction & or road realignment at the Uchee Shooting Range, & parking lot improvement. EA |
- Recreation management - Facility management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:12/2010 | 12/2010 |
Darrius Truss 334-727-2652 dtruss@fs.fed.us |
| Description: Construct an additional lane or loop road to provide more structured access that will mitigate the current safety threat and provide additional parking for the increased use at Uchee. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Silt removal from fishing ponds CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
On Hold | N/A | N/A |
Jorge Hersel 334-727-2652 jorgehersel@fs.fed.us |
| Description: Remove accumulated silt from fishing ponds, remove trees growing on dam, brush around pond edges to reduce button bush and repair breach in upper dam. Work dependant on funding. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Tuskegee Forest Health and Longleaf Pine Restoration 2 EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:12/2012 | 12/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Restoring longleaf pine to proper sites by harvesting off-site loblolly and slash pines. Overstocked pine stands will be thinned. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||