Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R8 - Southern Region, National Forests in Alabama, Forestwide (excluding Projects occurring in more than one Forest) - R8 - Southern Region, National Forests in Alabama, Occurring in more than one District (excluding Forestwide) - R8 - Southern Region, National Forests in Alabama, Bankhead Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Conecuh Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Oakmulgee Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Shoal Creek Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Talladega Ranger District (excluding Projects occurring in more than one District) - R8 - Southern Region, National Forests in Alabama, Tuskegee Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 12/2011 |
Expected:03/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 05/13/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
National Forests in Alabama, Forestwide (excluding Projects occurring in more than one Forest) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
NFsAL Enhansced Invasive Plant Control EA *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:05/2012 | 07/2012 |
Gary Shurette 334-241-8143 gshurette@fs.fed.us |
| Description: Forest-wide invasive plant control using current techniques, application methods, and risk-assessed herbicides. | |||||
| Location: UNIT - National Forests in Alabama All Units. STATE - Alabama. COUNTY - Bibb, Calhoun, Chilton, Clay, Cleburne, Covington, Dallas, Escambia, Franklin, Hale, Lawrence, Macon, Perry, Talladega, Tuscaloosa, Winston. Those sites where invasive species occur - Forest Wide. | |||||
| Back To Top | |||||
National Forests in Alabama, Occurring in more than one District (excluding Forestwide) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Install Weather Station CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: Erect two new permanent weather stations which will include 20' X 20' chainlink fenced area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=32295 |
|||||
| Location: UNIT - Talladega Ranger District, Shoal Creek Ranger District. STATE - Alabama. COUNTY - Clay, Cleburne. LEGAL - Township 13S, Range 11E, Section 18 and Township 21S, Range 5E, Section 34. Terragin Creek Watershed and Hollins WMA along FDR 696. | |||||
| Back To Top | |||||
National Forests in Alabama, Bankhead Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Edmond Smith Permanent Easement CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 09/22/2010 |
Expected:03/2011 |
03/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Permanent Easement for access to private land | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T9S, R8W, S22 & S27. T9S, R8W, S22 & S27. | |||||
|
Horse Trail Route Expansion CE |
- Recreation management | On Hold | N/A | N/A |
Terrance Fletcher 205-489-5111 terrancefletcher@fs.fed.us |
| Description: Add additional miles to Owl Creek Horse Trail | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. Owl Creek Horse Trail. | |||||
|
Jason McCullar Easement CE |
- Special use management |
In Progress: Scoping Start 05/30/2009 |
Expected:02/2011 |
02/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Drive way easement | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - S21, T11S, R8W. S21, T11S, R8W. | |||||
|
Reggie Watts Permanent Easement CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 09/22/2010 |
Expected:04/2011 |
04/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Permanent Easement for a driveway | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - T10S, R7W, S23. T10S, R7W, S23. | |||||
|
Robert Riddle Easement CE |
- Special use management |
In Progress: Scoping Start 08/05/2009 |
Expected:03/2011 |
03/2011 |
Joseph Brewer 205-489-5111 jbrewer@fs.fed.us |
| Description: Driveway Easement | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence, Winston. LEGAL - S4, T9S, R9W. S4, T9S, R9W. | |||||
|
Wilderness Trailheads (Gumpond and Boarden Creek) EA |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 08/17/2005 |
Expected:12/2011 |
01/2012 |
Terrance Fletcher 205-489-5111 terrancefletcher@fs.fed.us |
| Description: Construct and relocate Borden and Braziel Creek trailheads at the Sipsey Wilderness area | |||||
| Location: UNIT - Bankhead Ranger District. STATE - Alabama. COUNTY - Lawrence. LEGAL - S32, T8S, R8W; S12, T8S, R9W. Bankhead National Forest, Borden and Braziel Creek Trailheads. | |||||
| Back To Top | |||||
National Forests in Alabama, Conecuh Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
CNF Prescribe Burns CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 05/15/2008 |
Expected:02/2012 |
03/2012 |
Deborah Foley 334-222-2555 dfoley@fs.fed.us |
| Description: Continued maintenance & restoration of the fire-dependent ecosystem of the Conecuh National Forest through implementation of a systematic controlled burning regime, treating each area at least twice in the next several years. | |||||
| Location: UNIT - Conecuh Ranger District. STATE - Alabama. COUNTY - Covington, Escambia. Pine and pine/hardwood stands across Conecuh National Forest, Covington/Escambia Counties, AL. | |||||
|
Fairways 3D Seismic Survey CE |
- Minerals and Geology | Completed | Actual: 10/06/2011 | 10/2011 |
Deborah Foley 334-222-2555 dfoley@fs.fed.us |
| Description: Fairways Exporation & Production, LLC submitted a Special Use application to conduct a 3D seismic survey on approx. 35 square miles of national forest lands in Escambia County, AL as a subset of a larger survey area. Activities would last 6-8 months. | |||||
| Location: UNIT - Conecuh Ranger District. STATE - Alabama. COUNTY - Escambia. National forest lands in Escambia County, Alabama. | |||||
| Back To Top | |||||
National Forests in Alabama, Oakmulgee Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Perry County Road 51 Widening Project CE *NEW LISTING* |
- Road management | Completed | Actual: 11/28/2011 | 11/2011 |
Joseph Koloski 205-926-9765 jkoloski@fs.fed.us |
| Description: The proposed action would widen two sections of Perry County RD 51 that currently pose safety and environmental concerns. The sections total approximately 0.4 mles in Compartments 113 and 118.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37522 |
|||||
| Location: UNIT - Oakmulgee Ranger District. STATE - Alabama. COUNTY - Perry. LEGAL - Section 4; T21N; R9E; Perry County, AL. Talladega NF, Oakmulgee RD, Compartments 113 and 118, Perry County Road 51. | |||||
| Back To Top | |||||
National Forests in Alabama, Shoal Creek Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
El Paso Corporation / Southern Natural Gas Special Use Permit Modification for Pesticide Usage EA *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:07/2012 | 06/2013 |
Art Henderson 256-463-2272 x103 dswagner@fs.fed.us |
| Description: Analysis for requested modification of a special use permit, currently held by El Paso Corporation / Southern Natural Gas, to allow for the use of pesticide along existing gas pipeline right-of-way.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37894 |
|||||
| Location: UNIT - Shoal Creek Ranger District. STATE - Alabama. COUNTY - Calhoun, Cleburne, Perry. LEGAL - T16S, R10E, S18; T16S, R9E, S12 & 13, 17, 18, 20 in Cleburne & Calhoun counties T21N, R8E, S13;T21N, R9E, S30-32 in Perry County. Right-of-way's through the Oakmulgee and Shoal Creek Ranger Districts. | |||||
|
Rattlesnake Environmental Assessment EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Cancelled | N/A | N/A |
Kimberly Bittle 256-463-2272 kbittle@fs.fed.us |
| Description: Conduct commercial thinning and restoration treatments, and wildlife stand improvment for the RCW and forest health. | |||||
| Location: UNIT - Shoal Creek Ranger District. STATE - Alabama. COUNTY - Calhoun, Cleburne. Calhoun and Cleburne Counties, Talladega National Forest, Shoal Creek Ranger District. | |||||
| Back To Top | |||||
National Forests in Alabama, Talladega Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bell Springs Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 833 acre prescribed burn unit in the Bell Springs area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33383 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 22, 23, 26, 27 and 34; Township 17s; Range 7e. FS lands west of FSRs 644 and 644C. | |||||
|
FY2012 TLRD Midstory Removal CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
In Progress: Scoping Start 12/06/2011 |
Expected:01/2012 |
07/2012 |
Art Henderson 256-362-2909 arthenderson@fs.fed.us |
| Description: Removal of hardwood midstory on approximately 157 acres of upland pine timber.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37630 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay. Compartment 284 Stands 1, 3 & 5 and Compartment 285 Stand 21. | |||||
|
Marlow Branch Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 796 acre prescribed burn umit in the Germany Mtn area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34917 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 23, 25, 26, 35 and 36; Township 19s; Range 5e. FS lands west of CR 234. | |||||
|
Mump Creek Prescribed Burn Addition CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: Add an additional 826 acre block in the SE corner of the existing Mump Creek burn.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34919 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 14, 15, 22, 23 and 26; Township 19s; Range 6e. FS lands west of CR 310 and south of Union Church to CSX RR. | |||||
|
Salt Creek Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 805 acre prescribed burn unit in the Salt Creek area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34927 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 25, 26, 35 and 36; Township 17s; Range 7e. FS lands between CR 486 and FSR 644 west of Salt Creek Church. | |||||
|
Southern Electric Generation Co. - Gaston - Yellow Dirt 230kv TL EA *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:06/2012 | 07/2012 |
Mary Humphries 256-362-2909 x 145 mhumphries@fs.fed.us |
| Description: Renew existing permit along with the replacement of four (4) existing structures and allow the use of herbicides to maintain vegetation on existing easement
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37629 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay, Talladega. Talladega Co - S28 T20S R5E; Clay Co - S25, 26, 27 T20S R5E & S30 T20S R6E. | |||||
|
Talladega Mtn Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 1106 acre prescribed burn unit in the Chandler Springs area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34920 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Talladega. LEGAL - Sections 26, 27, 33, 34, 35; Township 19s; Range 6e and Section 4; Township 20s; Range 6e. FS lands east of SR 77, north of CR 307, east of Talladega Creek and south of FSR 699. | |||||
|
Tree Farm Prescribed Burn CE |
- Fuels management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:06/2012 | 01/2013 |
Scott Layfield 256-362-2909 slayfield@fs.fed.us |
| Description: A new 2640 acre prescribed burn unit located west of Turnipseed Camp.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34922 |
|||||
| Location: UNIT - Talladega Ranger District. STATE - Alabama. COUNTY - Clay. LEGAL - Sections 13-15, 22-24, 25, 26 and 36; Township 18s; Range 7e and Sections 19, 30; Township 18s; Range 8e. FS lands south of Cheaha Creek, north of Hubbard Creek and west of SR 281. | |||||
| Back To Top | |||||
National Forests in Alabama, Tuskegee Ranger District (excluding Projects occurring in more than one District) |
R8 - Southern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Annual Wildlife Opening Maintenance CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 08/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: We will be bush hogging, disking, fertilizing and planting existing wildlife openings. Some are for the annual Youth Dove Hunt and others as a supplemental food source during the cool weather season. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Selected location within the Tuslegee National Forest. Tuskegee National Forest. | |||||
|
Construction of loop trail at Tsinia CE |
- Recreation management - Facility management |
On Hold | N/A | N/A |
Darrius Truss 334-727-2652 dtruss@fs.fed.us |
| Description: Construct a a one mile interpretative loop trail, complimenting an existing 1/4 mile linear trail. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Control of Woody Vegetation Using Herbicides EA |
- Recreation management - Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 05/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Use of herbicides to control woody vegetation along the cleared limits of forest service roads, including culverts, bridges, trail bridges, boardwalks, trail improvements such as benches, blinds, and access to fishing ponds. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Forest-Wide. Tuskegee National Forest. | |||||
|
Culvert Installation CE |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
On Hold | N/A | N/A |
Jorge Hersel 334-727-2652 jorgehersel@fs.fed.us |
| Description: Install new culvert on FS Road 900, gravel nearby parking area, reduce surface runoff. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Horse Trailhead Parking Area Expansion CE |
- Road management - Facility management - Watershed management - Vegetation management (other than forest products) - Recreation management |
On Hold | N/A | N/A |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Accomodate weekend and holiday overflow parking by getting trucks and trailers off the roadway and increase visitor safety by expanding current parking area | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Pre-Commercial thinning CE |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:03/2011 | 04/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Reduce the number of trees per acre using hand tools, reducing competition, allowing light to reach the forest floor, concentrate available moisture and nutrients to the remaining trees, increasing their vigor and reducing the risk of bark beetles. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - R24E, T17N, Section 11. Tuskegee National Forest. | |||||
|
Release of Advanced Oak Regeneration CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 02/2011 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Release young oak regeneration in an oak-loblolly pine stand using hand tools to reduce competetion for light, moisture and nutrients, improve stand vigor and improve native wildlife food sources for game and non game species. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - R 24E, T17N, Section 1 and R24E T17N, Section 11. Tuskegee National Forest. | |||||
|
Road Maintenance (Daylighting) CE |
- Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:08/2011 | 03/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Clear trees and brush 25-30 feet from the center of the roadway, remove any trees which may fall onto the roadway out to 100 feet from the road center. This will reduce maintenance and improve safety of visitors and employees. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. LEGAL - Tuskegee National Forest Ownership. Forest-wide. | |||||
|
Road construction & or road realignment at the Uchee Shooting Range, & parking lot improvement. EA |
- Recreation management - Facility management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:12/2010 | 12/2010 |
Darrius Truss 334-727-2652 dtruss@fs.fed.us |
| Description: Construct an additional lane or loop road to provide more structured access that will mitigate the current safety threat and provide additional parking for the increased use at Uchee. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Silt removal from fishing ponds CE |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
On Hold | N/A | N/A |
Jorge Hersel 334-727-2652 jorgehersel@fs.fed.us |
| Description: Remove accumulated silt from fishing ponds, remove trees growing on dam, brush around pond edges to reduce button bush and repair breach in upper dam. Work dependant on funding. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
Tuskegee Forest Health and Longleaf Pine Restoration 2 EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:12/2012 | 12/2012 |
Willie Humphrey 334-727-2652 whumphrey@fs.fed.us |
| Description: Restoring longleaf pine to proper sites by harvesting off-site loblolly and slash pines. Overstocked pine stands will be thinned. | |||||
| Location: UNIT - Tuskegee Ranger District. STATE - Alabama. COUNTY - Macon. Tuskegee National Forest. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||