Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) - R6 - Pacific Northwest Region, Umatilla National Forest, Heppner Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, North Fork John Day Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, Pomeroy Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Umatilla National Forest, Walla Walla Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 12/2011 |
Expected:03/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 05/13/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Blue Mountains Forest Plan Revision EIS |
- Land management planning |
In Progress: NOI in Federal Register 03/29/2010 Est. DEIS NOA in Federal Register 12/2011 |
Expected:03/2013 |
04/2013 |
Kathleen Countryman 541-523-1264 kcountryman@fs.fed.us |
| Description: Revision of Land Management Plans (Forest Plans) for the Malheur, Umatilla, & Wallowa-Whitman Forests. Forest Plans provide stategic, program-level guidance for future management of forests and their natural resources for the next 10-15 years.
Web Link: http://www.fs.fed.us/r6/uma/blue_mtn_planrevision/ |
|||||
| Location: UNIT - Malheur National Forest All Units, Wallowa Valley Ranger District, Eagle Cap Ranger District, La Grande Ranger District, Umatilla National Forest All Units, Whitman Ranger District. STATE - Oregon, Washington. COUNTY - Asotin, Columbia, Garfield, Walla Walla, Baker, Grant, Harney, Malheur, Morrow, Umatilla, Union, Wallowa, Wheeler. Forest-wide for Malheur, Umatilla, & Wallowa-Whitman (except for the HCNRA). | |||||
|
Granite Creek Watershed Mining Plans EIS |
- Minerals and Geology |
In Progress: NOI in Federal Register 10/11/2011 Est. DEIS NOA in Federal Register 11/2012 |
Expected:03/2013 |
05/2013 |
Sophia Millar 541-426-5540 smillar@fs.fed.us |
| Description: Analyze proposed mining plans of operations within the Granite Creek Watershed on the Umatilla and Wallow-Whitman NFs.
Web Link: http://www.fs.fed.us/r6/w-w/projects/nepa_project.shtml?project=2209 |
|||||
| Location: UNIT - North Fork John Day Ranger District, Whitman Ranger District. STATE - Oregon. COUNTY - Baker, Grant. LEGAL - T8-10S R34-36 E WM. Granite Creek Watershed. | |||||
| Back To Top | |||||
Umatilla National Forest, Heppner Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
District Wide Underplanting CE |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:03/2012 | 03/2012 |
Pam Arbogast 541-676-2156 parbogast@fs.fed.us |
| Description: Planting for species diversification in recently thinned lodgepole pine stands on approximately 400 acres. | |||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Morrow. LEGAL - T.5S, R.22E, section 2; T.5S, R.25E, section 4; T.5S, R.28E, sections 1, 3, and 10-12; and T.5S, R.29E, sections 5 and 7. Located approximately 25 miles east of Heppner, OR near FS Road 5300. | |||||
|
Ditch Creek Fence and Spring CE |
- Grazing management | On Hold | N/A | N/A |
Tim Collins 541-676-2114 tcollins@fs.fed.us |
| Description: Replace 6.5 miles of electric fence with 3-strand barbed wire fence along Mallory and Little Potamus and Gilbert creeks. Develop 5 spring sites to provide water in the uplands for cattle and wildlife. | |||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant, Morrow. LEGAL - T5S, R28E, Sec 10,14, & 25. T8S, R26S Sec 22. T6S, R28E, Sec 12, 13, & 24. T6S, R29E, Sec 8, 9, & 17. South of Heppner along Mallory, Little Potamus, and Gilbert creeks. | |||||
|
Hog Creek Fence Replacement CE |
- Grazing management | On Hold | N/A | N/A |
Tim Collins 541-676-2114 tcollins@fs.fed.us |
| Description: Replace an existing 1.75 miles of electric fence with a 3-strand barbed-wire fence. | |||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Morrow. LEGAL - Township 6 South, Range 27 East, Sections 3, 10, and 11. One and a half miles east of the Tupper Work Center running west along Skookum Creek. | |||||
|
Potamus Fuels Reduction EA |
- Fuels management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:08/2012 | 10/2012 |
Scott Wryn 541-676-2138 swryn@fs.fed.us |
| Description: Identify and reduce wildfire risk to public and private lands within the Potamus subwatersheds as identified in the Morrow County Community Wildfire Protection Plan.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29191 |
|||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant, Morrow. LEGAL - T5S R28E, T5S R29E, T6S R28E, and T6S R29E. Within the Potamus WUI area as identified in the Morrow County Community Wildfire Protection Plan. | |||||
|
Swale Creek C & H Allotment EA |
- Grazing management |
In Progress: Scoping Start 08/21/2009 Est. 215 Comment Period Legal Notice 02/2012 |
Expected:05/2012 |
08/2012 |
Tim Collins 541-676-2114 tcollins@fs.fed.us |
| Description: Authorization for the continued cattle grazing of the Swale Creek Allotment.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29190 |
|||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant, Morrow. LEGAL - T 5 S., R 27 E., Sections 13, 14, 22-27, and 34-36; T. 5 S., R28E., Sections 17-20, and 29-33; T. 6 S., R 27 E., Sections 1, 2, 11-14 and 22-26; T. 6 S., R 28 E., Sections 3-11, 15- 22 and 28-33; a. Central portion of the district approximately 14 miles north of the town of Monument; Penland Lake, Ditch Creek area. | |||||
|
Wall Creek Road and Watershed Improvement EA |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
In Progress: Scoping Start 04/19/2011 Est. 215 Comment Period Legal Notice 12/2011 |
Expected:02/2012 |
05/2012 |
Kate Day 209-795-1381 kateday@fs.fed.us |
| Description: Reconstruction, decommissioning, storm damage risk reduction including culvert removal and waterbar construction, and aquatic organism passage improvement on selected roads throughout the Wall Creek watershed.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34891 |
|||||
| Location: UNIT - Heppner Ranger District. STATE - Oregon. COUNTY - Grant, Morrow, Wheeler. LEGAL - T6S, R26E, Sec 13, 24, 25, 36, T6S, R27E, Sec 8, 9, 15, 16, 24, 31, 32, T6S, R28E, Sec 4,T7S, R26E, Sec 6-9, 15, 17, 18, 22, 24, 27, 31-34, T7S, R27E, Sec 5-9, 17, 19, 32, 33, T8S, R26E, Sec 9, 13. Selected roads throughout the Wall Creek Watershed, including the 21, 23, and 24 roads and their associated secondary roads. | |||||
| Back To Top | |||||
Umatilla National Forest, North Fork John Day Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Clear Creek Tailings Road Realignment EA |
- Wildlife, Fish, Rare plants - Road management |
Developing Proposal Est. Scoping Start 05/2012 |
Expected:01/2013 | 07/2013 |
Joy Archuleta 541-427-5364 jearchuleta@fs.fed.us |
| Description: Move dredge tailings and relocate about 3100 feet of Grant County Road 13. Survey and design in FY2010, NEPA analysis & documentation FY 2011, implementation FY 2012/2013. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T9S, R35E, Sec 10, 14, 15. The project is located in Grant County, Oregon, in the Clear Creek Watershed on Grant County Road 13. | |||||
|
Columbia Power Special Use Authorization for a New Term CE |
- Special use management |
In Progress: Scoping Start 07/15/2010 |
Expected:02/2012 |
03/2012 |
Christine Helberg 541-427-5351 chelberg@fs.fed.us |
| Description: Use and maintenance of the existing utility corridor. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Umatilla. LEGAL - T2-5S R32E, T5-8S R31-33E, and T4-5S R31-35E (Willamette Principal Meridian). Powerline corridors that cross FS lands: (1)near Albee, (2) east of Ukiah near Hwy 244 and (3) near Dale along Hwy 395 and FS road 3980. | |||||
|
District Wide Gopher Trapping CE *NEW LISTING* |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 11/22/2011 |
Expected:01/2012 |
04/2012 |
Joy Archuleta 541-427-5373 lbaxter@fs.fed.us |
| Description: Pocket gophers are causing measurable damage and mortality to conifer seedlings in reforestation units.
The goal of this project is to reduce gopher populations within reforestation units using mechanical traps.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37527 |
|||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Umatilla. LEGAL - T3SR32Es25,28- 34T3SR33Es15,T4SR30Es29,31-32,T4 SR32Es3,6,10,13, T4SR33Es6,28,33,T5SR33Es4-5,9,T6SR29Esec14-15,T6SR32Es24,T6SR33Es17-21, 33,T7SR31Es4,T7SR33Es18,29-31,T8SR33Es31-33,T9SR33Es4-6,9. North Fork John Day Ranger District- District wide. | |||||
|
Hidaway Mining EA EA |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 12/2011 |
Expected:09/2012 | 10/2012 |
Christine Helberg 541-427-5351 chelberg@fs.fed.us |
| Description: Expansion of current exploration pits to a maximum of 30 ft wide by 25 ft deep using hand tools & limited mechanical equipment. Use of an existing closed road & shelter. Placement of an outhouse. Limited use of a spring for hand-washing of rock. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - T5S R33 1/2E Sections 22, 23. Hidaway Creek drainage, Umatilla County, Oregon. | |||||
|
Junkens and Beeman Creek Culvert Project CE *NEW LISTING* |
- Watershed management |
Developing Proposal Est. Scoping Start 01/2012 |
Expected:07/2012 | 07/2013 |
Allison Johnson 541-427-5305 ajohnson04@fs.fed.us |
| Description: Removal/replacement of one culvert on the Beeman – Junkens Creek 3015 OHV trail (1007140 rd) and removal/replacement of two culverts on the FS 1007000 rd and two culvert removal/replacements on the FS 1007100 road. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Umatilla. LEGAL - T8S, R33E, Sec. 18, 19, 30 and T8S, R32E, Sec. 24, 25. Junkens Creek and Beeman Creek, in the Desolation watershed. | |||||
|
NFJD Aspen Restoration CE |
- Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:05/2012 | 07/2012 |
Diane Shirley 541-427-5315 dshirley@fs.fed.us |
| Description: Restoration projects to protect/enhance/restore declining stands of quaking aspen to improve wildlife habitat. Includes buck & pole fencing, tree planting and girdling, felling or removal of conifers up to 21" DBH. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Morrow, Umatilla. LEGAL - Entire North Fork John Day Ranger District; see project file for legal locations. District-wide, wherever aspen stands occur. | |||||
|
Olive Lake Dam Maintenance CE |
- Facility management |
In Progress: Scoping Start 01/03/2011 |
Expected:03/2012 |
07/2012 |
Joe Neer 541-278-3749 jneer@fs.fed.us |
| Description: Clean out logs and debris from dam spillway. Add more rip-rap to lake side of dam to reduce erosion. | |||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T9S R34E Sec 15. East end of Olive Lake. | |||||
|
Oriental Loop OHV Trail Construction CE |
- Recreation management |
In Progress: Scoping Start 01/03/2011 |
Expected:05/2012 |
06/2012 |
Janel Lacey 541-427-5394 jlacey@fs.fed.us |
| Description: Designate 9.6 miles of new OHV trail to provide additional access to the Winom-Frazier OHV Complex from the Oriental Campground. Most of the route would occur on existing open and closed roads, with only 1-2 miles of new construction.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35259 |
|||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant, Umatilla. LEGAL - Follows existing open and closed roads beside Oriental Creek from Oriental Creek Campground on the N. Fork John Day River to the Winom-Frazier OHV Trail system. T. 6 S. R. 33 E., sections 26, 27, 34, and 35; and T. 7 S., R. 33 E., sections 3 and 10. | |||||
|
Paradise Trail Reroute CE |
- Recreation management |
In Progress: Scoping Start 01/03/2011 |
Expected:03/2012 |
04/2012 |
Janel Lacey 541-427-5394 jlacey@fs.fed.us |
| Description: Reroute the lower portion of the Paradise Trail to install grade-reducing switchbacks (3.4 miles), bringing the grade from 40% to 10-15% for the entire trail. Decommission 1.1 miles of existing, steep trail.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35258 |
|||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T 6 S., R. 34 E. sections 2 and 3. . The trail is located within the North Fork John Day Wilderness. | |||||
|
Ruby Creek Snowmobile Trail Grooming CE |
- Recreation management |
Developing Proposal Est. Scoping Start 02/2012 |
Expected:05/2012 | 07/2012 |
Janel Lacey 541-427-5394 jlacey@fs.fed.us |
| Description: This is an existing, un-groomed snowmobile trail. In order to groom the trail, a bridge will be constructed over Ruby Creek and trees less than six inches DBH along each side of the trail will be removed to a 14-foot width.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33727 |
|||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T9S R35E Secs 14, 15, 17 & 18. Approximately three miles southwest of the town of Granite, OR. | |||||
|
Wilkins Dry Forest Restoration Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 12/06/2011 Est. 215 Comment Period Legal Notice 04/2012 |
Expected:07/2012 |
09/2012 |
Lea Baxter 541-427-5373 lbaxter@fs.fed.us |
| Description: Restore upland forest conditions, encourage growth of large trees, and move the analysis area towards its Historical Range of Variability (HRV) in tree density, species composition and stand structure using commercial and noncommercial thinning.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37146 |
|||||
| Location: UNIT - North Fork John Day Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - T5S, R30E multiple sections including 3, 10, 11, 14 , 15, 22, 23, 26, 27. 10 miles east of Ukiah, Oregon, off the 53 road system, Deerlick Creek and Wilkins Creek drainages. | |||||
| Back To Top | |||||
Umatilla National Forest, Pomeroy Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Asotin Creek Prescribed Fire Project CE |
- Fuels management |
In Progress: Scoping Start 03/14/2011 |
Expected:11/2012 |
10/2013 |
Tara Hanger 509-843-4676 thanger@fs.fed.us |
| Description: Implement prescribed fire on approx. 7900 acres of FS land & 2400 acres of WA Dept of Fish and Wildlife land to reduce fuels (ground, ladder, canopy biomass) and rehabilitate grass and shrubs to improve wildlife forage. Will be rescoped Feb 2012.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34631 |
|||||
| Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin, Garfield. LEGAL - T9N,R4E, Sections 14-16, 21-23, 24-28 and 35; T9N, R43E Sections 2-4, 9-10 and; T9N, R44E, Sections 16-17, 19-21 and 30. Forest Service and WA Dept of Fish and Wildlife land in Garfield and Asotin Counties, WA. | |||||
|
Personal Use Firewood - 2012 Program CE *NEW LISTING* |
- Forest products |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:05/2012 | 05/2012 |
Billy Bowles 509-843-4673 bbowles@fs.fed.us |
| Description: Gathering of fuelwood for personal use. | |||||
| Location: UNIT - Pomeroy Ranger District. STATE - Oregon, Washington. COUNTY - Asotin, Columbia, Garfield, Wallowa. Pomeroy Ranger District. | |||||
|
Personal Use Post and Poles - 2012 Program CE *NEW LISTING* |
- Forest products |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:05/2012 | 05/2012 |
Billy Bowles 509-843-4673 bbowles@fs.fed.us |
| Description: Removal of green and dead lodgepole pine up to 10 inches diameter at breast height (DBH) for personal use purposes. | |||||
| Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin, Columbia, Garfield. Pomeroy Ranger District. | |||||
|
Seven Sisters Spring Development CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 04/27/2011 |
Expected:05/2012 |
06/2012 |
William Dowdy 509-843-4687 wdowdy@fs.fed.us |
| Description: Fence off the spring area to exclude cattle. Water will be piped to a new trough approximately 100 feet away from spring. Trough will be outside of fenced area on a gravel pad. Overflow water will be piped back inside fenced area. | |||||
| Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin. T7N., R43E, Section 1. | |||||
|
South George Vegetation and Fuels Management Project EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: NOI in Federal Register 03/09/2009 Est. DEIS NOA in Federal Register 02/2012 |
Expected:05/2012 |
09/2012 |
Dan Castillo 406-827-3533 docastillo@fs.fed.us |
| Description: Vegetation management project to improve vigor, health, and fire resistence within a forested ecosystem. It includes timber harvest, treatment of acitivity and natural fuels, landscape prescribed burning, and non-commercial treatments.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26469 |
|||||
| Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin, Garfield. LEGAL - T7N,R44E,sec1; T7N,R43E,sec 1-2; T8N,R43E,sec 1,2,10-15,21-28,33-36; T8N,R44E,sec 5-8,17-20,26-36; T9N,R43E,sec 35. Project planning area is approx. 21,000 acres. Treatments proposed on approx. 4,500 acres. | |||||
|
Wenatchee Creek Prescribed Fire CE |
- Wildlife, Fish, Rare plants - Fuels management |
In Progress: Scoping Start 11/17/2010 |
Expected:01/2012 |
05/2012 |
Tara Hanger 509-843-4676 thanger@fs.fed.us |
| Description: Implement prescribed fire on approx. 7,600 acres to reduce ground fuel accumulations, tree densities, and ladder fuels. Reduce canopy biomass to historical levels, improve timber stand resistance to disease and insects, and improve wildlife forage.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34241 |
|||||
| Location: UNIT - Pomeroy Ranger District. STATE - Washington. COUNTY - Asotin, Garfield. LEGAL - T7N, R43E, Sections 1-6 and 8-12; T7N, R44E, Sections 6 and 7; and T8N, R43E, Sections 31-35. Area east of Forest road 40 from the junction of the 40 and 44 road. North of Monument Ridge. NW of Indian Tom Trail. South of road 43. | |||||
| Back To Top | |||||
Umatilla National Forest, Walla Walla Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Cobbler II Timber Sale and Fuel Reduction Project Supplemental Environmental Impact Statement (SEIS) EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: DEIS NOA in Federal Register 08/12/2011 Est. FEIS NOA in Federal Register 02/2012 |
Expected:02/2012 |
06/2012 |
Kimpton Cooper 509-522-6009 kmcooper@fs.fed.us |
| Description: A Supplemental Environmental Impact Statement (SEIS) is being prepared to clarify and revise aspects of the analysis disclosed within the October 2010 Cobbler II Timber Sale and Fuels Reduction Project Final Environmental Impact Statement (FEIS).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36006 |
|||||
| Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Union, Wallowa. LEGAL - T4N. R40E; T5N R40E; T4N R41E; T5N R41E; T5N R42E; T6N R41E; T6N R42E. Elk Flat to Long Meadow between the Grande Ronde River and the Wenaha-Tucannon Wilderness. | |||||
|
SF Walla Walla Trail Bridge Replacement CE |
- Recreation management | On Hold | N/A | N/A |
Steve Anderson 509-522-6041 sranderson@fs.fed.us |
| Description: This project would replace a native log stringer bridge with a pressure treated glue-laminated bridge. This trail is a multi-use trail. The design standard for the bridge is to facilitate safe pack and saddle horse use. | |||||
| Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - T4N., R37E., Section 14. Located on SF Walla Walla Trail. | |||||
|
Tollgate Fuels Reduction Project EIS |
- Fuels management |
In Progress: NOI in Federal Register 10/19/2010 Est. DEIS NOA in Federal Register 04/2012 |
Expected:09/2012 |
09/2012 |
Kimpton Cooper 509-522-6009 kmcooper@fs.fed.us |
| Description: The project seeks to conduct fuels reduction activities within the Tollgate Wildland Urban Interface (WUI).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28356 |
|||||
| Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Umatilla. Located within Tollgate Wildland Urban Interface, established in Umatilla County CWPP. | |||||
|
Union Pacific Underground Utility Project CE |
- Special use management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:05/2012 | 06/2012 |
Jeff Bloom 509-522-6277 jhbloom@fs.fed.us |
| Description: Relocation of existing above ground utility lines to an underground location within the existing railroad service road. | |||||
| Location: UNIT - Walla Walla Ranger District. STATE - Oregon. COUNTY - Umatilla. LEGAL - Portions of T. 1S., R. 36E., Section 5 and T. 1N., R.36E., Section 32. Along the Railroad service road within Meacham Canyon. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||