Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) - R6 - Pacific Northwest Region, Malheur National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R6 - Pacific Northwest Region, Malheur National Forest, Occurring in more than one District (excluding Forestwide) - R6 - Pacific Northwest Region, Malheur National Forest, Blue Mountain Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Malheur National Forest, Emigrant Creek Ranger District (excluding Projects occurring in more than one District) - R6 - Pacific Northwest Region, Malheur National Forest, Prairie City Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 12/18/2009 Est. DEIS NOA in Federal Register 12/2010 |
Expected:11/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 01/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Blue Mountains Forest Plan Revision EIS |
- Land management planning |
In Progress: NOI in Federal Register 03/29/2010 Est. DEIS NOA in Federal Register 04/2011 |
Expected:03/2012 |
04/2012 |
Kathleen Countryman 541-523-1264 kcountryman@fs.fed.us |
| Description: Revision of Land Management Plans (Forest Plans) for the Malheur, Umatilla, & Wallowa-Whitman Forests. Forest Plans provide stategic, program-level guidance for future management of forests and their natural resources for the next 10-15 years.
Web Link: http://www.fs.fed.us/r6/uma/blue_mtn_planrevision/ |
|||||
| Location: UNIT - Malheur National Forest All Units, Wallowa Valley Ranger District, Eagle Cap Ranger District, La Grande Ranger District, Umatilla National Forest All Units, Whitman Ranger District. STATE - Oregon, Washington. COUNTY - Asotin, Columbia, Garfield, Walla Walla, Baker, Grant, Harney, Malheur, Morrow, Umatilla, Union, Wallowa, Wheeler. Forest-wide for Malheur, Umatilla, & Wallowa-Whitman (except for the HCNRA). | |||||
| Back To Top | |||||
Malheur National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Malheur NF Travel Management EA |
- Recreation management - Watershed management - Road management |
In Progress: Scoping Start 10/26/2010 Est. 215 Comment Period Legal Notice 03/2011 |
Expected:07/2011 |
09/2011 |
Richard Vetter 541-573-4369 rvetter@fs.fed.us |
| Description: Implement the Travel Management Rule (prohibiting motorized travel off of existing designated routes where it is not currently prohibited) and continue to provide motorized access for dispersed camping.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33448 |
|||||
| Location: UNIT - Malheur National Forest All Units. STATE - Oregon. COUNTY - Baker, Crook, Grant, Harney. Malheur National Forest and that portion of the Ochoco National Forest that is administered by the Malheur NF. | |||||
|
Malheur National Forest Invasive Plants Treatment EIS |
- Vegetation management (other than forest products) | On Hold | N/A | N/A |
Carole Holly 541-575-3026 cholly@fs.fed.us |
| Description: Treatment of known and newly discovered invasive plants using herbicide, manual, mechanical, biological, and/or cultural methods. | |||||
| Location: UNIT - Malheur National Forest All Units. STATE - Oregon. COUNTY - Baker, Crook, Grant, Harney, Malheur. LEGAL - Forest wide. Forest wide. | |||||
|
University of Florida: Idaho-Oregon Passive Seismic Survey 2011-2013 CE *NEW LISTING* |
- Special use management | Completed | Actual: 11/22/2010 | 05/2011 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Eight seismic stations will be temporarily installed on the Malheur National Forest to record natural earthquake activity. The instruments will help to delineate the current geometry of the major geologic units of the Western Idaho Shear Zone. | |||||
| Location: UNIT - Malheur National Forest All Units. STATE - Oregon. COUNTY - Grant. LEGAL - Blue Mountain, Emigrant Creek, and Prairie City Ranger Districts. Malheur National Forest. | |||||
| Back To Top | |||||
Malheur National Forest, Occurring in more than one District (excluding Forestwide) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Campground Tent Pad Maintenance CE |
- Recreation management | Cancelled | N/A | N/A |
Ryan Falk 541-820-3890 rfalk@fs.fed.us |
| Description: Leveling and gravel surfacing of existing tent pad areas in Parish Cabin, Trout Farm, and Magone Campgrounds. | |||||
| Location: UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T14S R34E, section 31; T32S R12E, section 6; and T16S R33E, section 16. Trout Farm, Magone, and Parish Cabin Campgrounds. | |||||
|
Cole Outfitter Guide Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 10/26/2009 |
Expected:10/2011 |
10/2011 |
Shannon Winegar 541-820-3863 swinegar@fs.fed.us |
| Description: Issuance of a special use permit to authorize outfitter guiding and camps for big game hunting of big horn sheep, muzzleloading, and rifle elk. | |||||
| Location: UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Base camps would be located at T15S R28E section 3, T16S R331/2 E section 3, and T14S R27E section 11. Murders Creek Hunt Unit, West Murders Creek Hunt Unit, East Grant Hunt Unit, Beulah Hunt Unit. | |||||
|
SodaBear Project EA |
- Fuels management |
In Progress: Scoping Start 08/31/2010 Est. Objection Period Legal Notice 01/2011 |
Expected:04/2011 |
05/2011 |
Daniel Hubbard 530-279-8330 dhubbard02@fs.fed.us |
| Description: Approximately 20,000 acres of thinning in timber stands to reduce fire hazard, insect and disease risk, improve old growth, identify / plan biomass stands, restore riparian aspen, restore mountain mahogany, and maintain wildlife habitat.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28992 |
|||||
| Location: UNIT - Blue Mountain Ranger District, Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant, Harney. Lower Bear, Middle Bear, and Soda Valley Subwatersheds near Seneca, Oregon. | |||||
| Back To Top | |||||
Malheur National Forest, Blue Mountain Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Abandoned Mine Closures 2010/2011 CE |
- Minerals and Geology |
In Progress: Scoping Start 07/22/2009 |
Expected:02/2011 |
06/2011 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Close abandoned mine hazards by filling in adits/trenches/shafts with earth and rock from existing mine spoil piles; and recontour slopes adjacent to work area. If bats are present, a bat gate structure may be installed rather than an earthen plug. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Middlefork John Day River / Susanville area T. 10S. R.34E., Sec.30/31; T.10S., R.32E. Sec 12; etc. Specific mines include 2010-986 shaft, Bell of the Hills shaft on road 2000-808, Stithum, Pacman, Blue Rock Telluride. | |||||
|
Blue Mountain Ranger District Fence Projects CE |
- Wildlife, Fish, Rare plants - Grazing management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:03/2011 | 03/2011 |
Kelly Ware 541-575-3432 kware@fs.fed.us |
| Description: Erect fencing to enhance management of rangeland and riparian resources. The fencing would be located on allotments: Camp Creek, Jack Creek, Murderers Creek, Mt. Vernon, Indain Ridge, Dixie, Lower Middle Fork, and Upper Middle Fork. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. South Fork of the John Day, Silvies, Middle Fork, John Day River watersheds. | |||||
|
Camp Creek Road Decommission Project EA |
- Road management | On Hold | N/A | N/A |
Jessi James 541-575-3130 jjames@fs.fed.us |
| Description: Decommission 83 miles of road in the Camp Creek Watershed. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Camp Creek Watershed. | |||||
|
Closure of Upper Lemon Cabin Abandoned Mine Adit & Removal of Granite Boulder Creek Bridge CE |
- Minerals and Geology |
In Progress: Scoping Start 11/19/2009 |
Expected:02/2011 |
06/2011 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Close the Upper Lemon Cabin abandoned mine adit and remove the deteriorated Granite Boulder Cr. Bridge in order to protect public health and safety. The adit would be closed either by plugging the adit with earth or installation of a bat gate. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T. 10 N., R. 34 E., SW 1/4 Sec. 14 (adit) and T. 10 S., R. 34 E., NE1/4 Sec. 22 (bridge). Granite Boulder Creek area along FDR 4559 on the Blue Mt. Ranger District. | |||||
|
Crawford Aspen CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:04/2011 | 07/2011 |
Lori Stokes 541-575-3331 lstokes@fs.fed.us |
| Description: Cutting of conifers that are overtopping and shading out aspen, treating the created slash, and fencing the aspen stands. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T 10S R 35E, T 10S R 351/2E, T10S R36E, T 11S, R35E, T11S, R351/2E, T11S, R36E. Aspen stands are within the Mill Creek subwatershed Blue Mtn Ranger District. | |||||
|
Galena EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: NOI in Federal Register 03/12/2009 Est. DEIS NOA in Federal Register 01/2011 |
Expected:04/2011 |
08/2011 |
Eric Wunz 541-575-3000 ewunz@fs.fed.us |
| Description: Reducing fire hazard and improving forest health at the landscape level.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25337 |
|||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T10S, R34-35E; T11S, R34-35E; and T12S, R34-35E. Located in the Little Boulder/Deerhorn and Vinegar subwatersheds. | |||||
|
Murderer's Creek Juniper Management CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Grazing management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:05/2011 | 05/2011 |
Robbie Piehl 907-789-6223 robbiepiehl@fs.fed.us |
| Description: Remove post-settlement juniper to improve big game winter range, increase late season stream flow, and reduce competition between wild horses, cattle, and wildlife. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Located in the Bark Cabin and Lower Deer Creek subwatersheds. | |||||
|
North Finger Grazing Authorization Project EA *NEW LISTING* |
- Grazing management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:09/2011 | 06/2012 |
Nick Stiner 541-575-3496 nstiner@fs.fed.us |
| Description: Analyzes cattle grazing authorizations on six existing allotments for Donaldson, Deer, Hamilton, King, Indian Ridge, Highway allotments | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Upper Deer Creek, Lower Fox Creek, Lower Basin Creek, Middle Fox Creek, Belshaw Creek, and North Face Creek subwatersheds. | |||||
|
Plantation Maintenance, Long Creek CE *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:04/2011 | 06/2011 |
Amanda Lindsay 541-575-3333 alindsay@fs.fed.us |
| Description: Precommercial thinning plantations to improve tree growth and vigor, and fuels treatment to reduce fire hazard. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T09S R31-32E; T10S R28-32E; and T11S R30-32E. Plantations are located west of Grant County Road 18 to HWY 395, Plantations are located west of Grant County Road 18 to HWY 395 in the Slide and Long Crk drainages and Long Creek Mountain area. | |||||
|
Renewal of Spring Development Special Use Permit on Tributary of Jungle Creek CE |
- Special use management | Completed | Actual: 11/18/2010 | 12/2010 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Renewal of a Special Use Permit for maintenance and operation of an existing spring development. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - SW1/4NE1/4, Sec. 14, T 10 S., R32 E. Tributary to Jungle Creek. | |||||
|
Renewal of Spring Development and Convenience Enclosure Special Use Permits in Sloan Gulch area CE |
- Special use management |
In Progress: Scoping Start 09/15/2010 |
Expected:03/2011 |
04/2011 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Renewal of special use permits for operation and maintenance of an existing domestic spring development, and maintaining a fenced enclosure area adjacent to private home (to prevent livestock from entering yard area). | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.15S., R32E., Sec. 30. Sloan Gulch (above Canyon Creek). | |||||
|
Starr HFRA Project EA |
- Forest products - Fuels management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:06/2011 | 06/2011 |
Lori Stokes 541-575-3331 lstokes@fs.fed.us |
| Description: The project area will be treated to reduce fuel loading and improve forest health. This project area is within the Grant County Community Fire Protection Plan. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T15S, R29-31E, and T16S, R29-30E. Located on the north and west side of Bear Valley in the Starr Creek subwatershed. | |||||
|
Virginia Tech: Idaho-Oregon Refraction and Reflection Survey 2011 CE |
- Special use management |
In Progress: Scoping Start 04/06/2010 |
Expected:01/2011 |
08/2011 |
Pamela Uebler 541-575-3462 puebler@fs.fed.us |
| Description: Small seismometers will be placed along Hwy. 26 from Prairie City to Unity to record seismic vibrations produced from shot hole blasts detonated on private lands. The seismometers will help to image the subsurface geology of eastern Oregon. | |||||
| Location: UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Seismometers will be temporarily buried along the R-O-W of Hwy 26 from Prairie City to Unity Oregon. | |||||
| Back To Top | |||||
Malheur National Forest, Emigrant Creek Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bear Creek Riparian Juniper Thinning CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:05/2011 | 07/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Thin approximately 47 acres of juniper trees from riparian zones along Bear Creek. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R29E sections 4-6. Bear Creek, Forest Road 3750. | |||||
|
Copper Creek Culvert Replacement Project CE |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
Completed | Actual: 10/07/2010 | 10/2010 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Replace an existing culvert that blocks fish passage on Forest Road 4170. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R25E, section 13. Forest Road 4170 at Copper Creek. | |||||
|
Dairy EA EA |
- Forest products - Road management |
In Progress: Scoping Start 12/16/2010 Est. 215 Comment Period Legal Notice 04/2011 |
Expected:05/2011 |
07/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Timber harvest and road closures
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=8187 |
|||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Crook, Harney. LEGAL - T10-22S R24-25E. Nicoll/ Dairy Creeks. | |||||
|
Grapple Fire Salvage CE |
- Forest products - Fuels management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:06/2011 | 06/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Salvage less than 250 acres of trees weaken by the 2007 Grapple Fire and killed by beetles. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T18S R32E section 1. The 2007 Grapple Fire. | |||||
|
Key-Izee Fence Realignment Project CE |
- Grazing management |
In Progress: Scoping Start 04/21/2010 |
Expected:04/2011 |
06/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Reconstruct up to 1.25 miles of 4-stand barbed wire fence with T-posts and wood stays to realign an existing Forest Boundary fence and bring it back on line with the surveyed boundary. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T18S, R27E, section 18. Key-Izee Area. | |||||
|
Pine Creek Allotment Boundary Fence Realignment and Drift Fence Construction Project CE |
- Grazing management |
In Progress: Scoping Start 04/21/2010 |
Expected:04/2011 |
06/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Realignment of a portion of the southern allotment boundary fence to bring on line with forest boundary. Construct a 4-wire barbed fence segments to control livestock entering the lower pine creek canyon. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T20S, R33E. sections 25, 36; and T21S, R33E, sections 5, 6, and 8. Pine Creek Allotment. | |||||
|
South Fork John Day Riparian Juniper Thinning CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:05/2011 | 07/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Thin approximately 90 acres of juniper trees from riparian zones along the South Fork of the John Day River. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R28 E sections 13 and 24; and T19S, R29E sections 6, 7, 18. South Fork of the John Day River, and some associated unnamed tributaries. | |||||
|
Venator Creek Riparian Juniper Thinning CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:04/2011 | 06/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Thin approximately 77 acres of juniper trees from riparian zones along Venator Creek. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T18S, R29E sections 15, 16, 17, 20. Venator Creek, Forest Road 3150. | |||||
|
Yellowjacket Juniper Project CE |
- Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:05/2011 | 06/2011 |
Lori Bailey 541-573-4300 labailey@fs.fed.us |
| Description: Juniper management. Juniper cutting, juniper slash removal through firewood cutting and/or piling and burning, and underburning. | |||||
| Location: UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T.19S. R.28 E. Sections 24, 26, 26, 35, 36, T. 19 S. R. 29 E. Sections 4-10, 16-20, 30, 31, T. 20 S. R. 28 E. Sections 1, 12. The area bounded by Forest Roads 3750 to the north, 3740 & 3745 to the east and 4700 to the west. | |||||
| Back To Top | |||||
Malheur National Forest, Prairie City Ranger District (excluding Projects occurring in more than one District) |
R6 - Pacific Northwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Black Canyon Lodgepole Salvage and Sanitation CE |
- Forest products - Vegetation management (other than forest products) - Road management |
Cancelled | N/A | N/A |
William Brendecke 541-820-3840 wbrendecke@fs.fed.us |
| Description: Cutting and removal of dead and dying lodgepole for post and pole, firewood, and biomass material. Cutting of danger trees along Forest Roads 1647, 1647446, 1647441, and 1450448. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T17S 34E sections 2-4, 9-11. Project area is approximately 247 acres located within the Cliff Creek subwatershed. | |||||
|
Deardorff Water Source Project CE |
- Grazing management | Completed | Actual: 09/24/2010 | 10/2010 |
Shannon Britt (541) 820-3865 sbritt@fs.fed.us |
| Description: Recondition three spring developments in the Deardorff Allotment. The existing sources would be reconditioned by replacing head boxes, pipelines, and water troughs. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.14S., R.35E., Section 3. Deardorff Creek drainage. | |||||
|
Elk 16 EA |
- Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
Ryan Falk 541-820-3890 rfalk@fs.fed.us |
| Description: Application of thinning, slash treatments, and prescribed fire stands to reduce fire hazard. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S R34E, T16S R35E, T17S R34E, T17S 35E. Elk Creek and Crane Creek subwatersheds. | |||||
|
North Fork Lodgepole Salvage and Sanitation CE |
- Forest products - Road management |
Completed | Actual: 10/16/2010 | 10/2010 |
William Brendecke 541-820-3840 wbrendecke@fs.fed.us |
| Description: Salvage of trees killed by bark beetles for personal firewood use. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T14S R351/2E sections 3, 10, 15. Project area is approximately 100 acres located in the Swamp Creek subwatershed. North of the Short Creek Guard Station along Forest Road 13. | |||||
|
Plantation Thinning with Biomass Removal CE |
- Forest products - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:08/2011 | 10/2011 |
William Brendecke 541-820-3840 wbrendecke@fs.fed.us |
| Description: Precommercial thinning plantations to improve tree growth and vigor. Fuel treatments are proposed to reduce fire hazard, including use of equipment to remove biomass material. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Multiple sections in T12S R34E, T12S R35E, and T13S R35E. Upper Middle Fork John Day River and Upper John Day River watersheds. | |||||
|
Riparian Hardwood Planting Restoration CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 10/01/2010 |
Expected:01/2011 |
10/2011 |
William Wall 928-339-4384 wwall@fs.fed.us |
| Description: Planting of hardwood cuttings along approximately 1.2 miles of Lake Creek and 2.5 miles of Big Creek to restore shade and cover. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S R331/2E. Lake Creek and Big Creek within the Lake Creek subwatershed. | |||||
|
Summit / Logan Valley Grazing Authorization Project EA |
- Grazing management |
In Progress: Scoping Start 10/07/2008 Est. 215 Comment Period Legal Notice 01/2011 |
Expected:06/2011 |
07/2011 |
Susan Burton 541-575-3849 sburton@fs.fed.us |
| Description: Analyzes of cattle grazing authorizations on four existing allotments. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16 and 17S, R33 1/2 and 34E, Summit Prairie and Logan Valley Areas. This project analizes the following four grazing allotments: Logan Valley, McCoy, Summit Prairie, and Lake Creek. | |||||
|
Summit Prairie Lodgepole Salvage Sanitation CE |
- Forest products - Road management |
Completed | Actual: 10/16/2010 | 10/2010 |
William Brendecke 541-820-3840 wbrendecke@fs.fed.us |
| Description: Salvage of bark beetle killed trees for personal firewood use along Forest Road 16 and nearby travel routes. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S R34E, sections 10, 11, 14. The approximately 250 acre project area is located south and east of Prairie City within the Summit Creek subwatershed. | |||||
|
Wickiup Springs and Skookum Springs Fence and Spring Source Project CE |
- Grazing management | Completed | Actual: 09/24/2010 | 10/2010 |
Shannon Britt (541) 820-3865 sbritt@fs.fed.us |
| Description: Rebuild buck and pole fence at Wickiup Springs and Skookum Springs. Develop water source at Wickup Springs and relocate existing water trough at Skookum Springs. | |||||
| Location: UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T. 16S., R34E., Section 33 and T.17S., R34E., Section 35. Wickiup Springs and Skookum Springs. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||