| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide) - R5 - Pacific Southwest Region, Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R5 - Pacific Southwest Region, Plumas National Forest, Occurring in more than one District (excluding Forestwide) - R5 - Pacific Southwest Region, Plumas National Forest, Beckwourth Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Plumas National Forest, Feather River Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Plumas National Forest, Mt. Hough Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS *NEW LISTING* |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 09/2011 |
Expected:10/2011 |
10/2011 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 05/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Sierra Nevada Forest Plan Amendment (SNFPA) EIS |
- Land management planning | On Hold | N/A | N/A |
Donald Yasuda 916-640-1168 dyasuda@fs.fed.us |
| Description: Prepare a narrowly focused analysis to comply with two orders issued by the Eastern District Court of California on November 4, 2009. Correct the 2004 SNFPA Final SEIS to address range of alternatives and analytical consistency issues.
Web Link: http://www.fs.fed.us/r5/snfpa/2010seis |
|||||
| Location: UNIT - Eldorado National Forest All Units, Lassen National Forest All Units, Modoc National Forest All Units, Sequoia National Forest All Units, Tahoe National Forest All Units, Lake Tahoe Basin Mgt Unit, Carson Ranger District, Bridgeport Ranger District, Plumas National Forest All Units, Sierra National Forest All Units, Stanislaus National Forest All Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Alpine, Amador, Butte, Calaveras, El Dorado, Fresno, Inyo, Kern, Lassen, Madera, Mariposa, Modoc, Mono, Nevada, Placer, Plumas, Shasta, Sierra, Siskiyou, Tulare, Tuolumne, Yuba, Douglas, Esmeralda, Mineral. LEGAL - Along the Sierra Nevada Range, from the Oregon/California border south to Lake Isabella as well as lands in western Nevada. Sierra Nevada National Forests. | |||||
| Back To Top | |||||
R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Mammoth Mountain Base Area Land Exchange EA |
- Land ownership management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:11/2011 | 01/2012 |
Sheila Irons 760-924-5534 sirons@fs.fed.us |
| Description: Land exchange with Mammoth Mountain Ski Area of approximately 21 acres of land, currently under special use authorization, located at the Main Lodge area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30428 |
|||||
| Location: UNIT - Mammoth Ranger District, White Mountain Ranger District, Mount Whitney Ranger District, Mt. Hough Ranger District, Mi-Wok Ranger District. STATE - California. COUNTY - Inyo, Mono, Plumas, Tuolumne. LEGAL - Land to be exchanged is located in T.3S, R. 27E., Sec 30, MDM. Proposal includes the acquisition of non-federal parcels to the Plumas and Stanislaus National Forests. Main Lodge, Mammoth Mountain Ski Area. | |||||
| Back To Top | |||||
Plumas National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
California Department of Water Resources - new permit for existing water monitoring sites CE |
- Special use management |
In Progress: Scoping Start 03/02/2010 |
Expected:04/2011 |
06/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued use and maintenance of 20 existing facilities and accessory structures needed to gather data on rainfall and snow depth forest wide. Current permit terminates 12/31/2010. | |||||
| Location: UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Butte, Plumas, Sierra. 20 locations Forest Wide. | |||||
|
Feather River College - Special Use Permit Reissuance CE |
- Special use management | Completed | Actual: 02/04/2011 | 03/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Reissue a five year permit to Feather River College for outdoor recreation and other college courses on the Plumas National Forest | |||||
| Location: UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Plumas. LEGAL - areas throughout Plumas National Forest. National Forest System lands throughout Mt. Hough, Feather River, and Beckwourth Ranger Districts. | |||||
|
PSREC Mid-Mile Fiber Project CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 03/02/2011 |
Expected:04/2011 |
06/2011 |
Dana Walsh 530-836-7141 danawalsh@fs.fed.us |
| Description: The Plumas National Forest Proposes to issue a special use permit to Plumas Sierra Rural Electrict to install, maintain, and operate 13 miles of fiberoptic cable to be attached to overhead poles within in existing powerline right away. | |||||
| Location: UNIT - Plumas National Forest All Units. STATE - California. COUNTY - Plumas. LEGAL - Sections of T22N R11E, T22N R12E, T23N R13E, T23N R14E, T23N R15E, T23N R16E, T24N R09E, T24N R10E, T24N R11E, T24N R14E, T25N R10E, T25N R14E, T26N R14E, T26N R15E, T27N R14E, adn T28N R13E. The portion of the project that includes the Plumas National Forest would extend from Portola to Quincy, in Plumas County, California. | |||||
| Back To Top | |||||
Plumas National Forest, Occurring in more than one District (excluding Forestwide) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Veg Management Program for 14 PG&E Transmission line ROWs EA *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:09/2011 | 10/2011 |
David Wood 530-283-7772 dcwood@fs.fed.us |
| Description: PG&E proposes to perform vegetation management practices in the right of way of 14 transmission lines in order to reduce the risk of fire and maintain a high standard of reliability. Activities include brush cutting, thinning, and herbicide. | |||||
| Location: UNIT - Mt. Hough Ranger District, Feather River Ranger District. STATE - California. COUNTY - Plumas. Located on the Plumas National Forest within 14 different transmission power lines. | |||||
| Back To Top | |||||
Plumas National Forest, Beckwourth Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Big Hill Project EA *NEW LISTING* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
Developing Proposal Est. Scoping Start 05/2011 |
Expected:01/2012 | 06/2012 |
Dana Walsh 530-836-7141 danawalsh@fs.fed.us |
| Description: Strategically place DFPZ and WUI treatments to modify fire behavior and improve forest resilience. Activities include mechanical thinning, hand thinning, piling, mastication, group selection, prescribed burning, and associated transportation planning | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Sec 11-15, 22-26,36 T23N R10E; Sec 1-11 T22N R11E; Sec 1-24, 27-34, 36 T23N R11E; Sec 26, 34-36 T24N R11E; Sec 6-7, 18-19, 30-32 T23N R12E; Sec 5-9 T22N R12E. The project area is located northwest of the town of Graeagle in the vicinity of Eureka Ridge and in the vicinity of the Cromberg and Sloat Communities. | |||||
|
Frenchman WC Aspen Hand Thin Project CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 07/2010 |
Expected:09/2010 | 06/2011 |
Russell Nickerson 530-836-2575 rnickerson@fs.fed.us |
| Description: Over the next several years Frenchman Work Center will conduct project work within aspen stands. Confier trees less than 11 inches dbh will be hand thinned within aspen stands and within 50 feet of the stands. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 24N, R 16E, Sec: 32, T 25N, R 15E, Sec: 2, 10-11, 14-15, 17, 20-23, 27. Located northwest of Frenchman Lake in the Dixie State Game Refuge and between the Frenchman Work Center and Cottonwood Spring Campground. | |||||
|
Goat Grazing Tall Whitetop CE |
- Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 03/2009 |
Expected:04/2009 | 06/2009 |
Michael Friend 530-836-7167 mjfriend@fs.fed.us |
| Description: The Beckwourth Ranger District proposes to use goats to treat the infestation of the noxious weed, tall whitetop (Lepidium latifolium) in the Ramelli Ranch allotment. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The legal description of the area is: T23N, R14E Sec. 26, 27, 28, and 29. It is comprised of the river corridor on both sides of County Road A-23, south of State Highway 70, and north of the railroad. | |||||
|
Gold Lake Campground Toilets 3 & 4 EA |
- Recreation management |
In Progress: Scoping Start 01/05/2011 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:08/2011 |
10/2011 |
Judy Schaber (530) 836-7126 jschaber@fs.fed.us |
| Description: Install two new vault toilets at Gold Lake Campground. These toilets would replace the portable toilets that are now being used. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T21N R12E Section 17. Gold Lake Campground. | |||||
|
Grizzly Valley, Grizzly Valley Community, and Humbug Allotments EA |
- Grazing management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:04/2011 | 08/2011 |
Kyla Sabo 530-836-2575 kylasabo@fs.fed.us |
| Description: Range Environmental Assessment
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31015 |
|||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R13E, multiple sections, T 23N, R 12 E and 13E, multiple sections. Beckwourth Ranger District near Lake Davis. | |||||
|
Ingalls Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 05/12/2010 Est. Objection Period Legal Notice 04/2011 |
Expected:06/2011 |
07/2011 |
Kyla Sabo 530-836-2575 kylasabo@fs.fed.us |
| Description: Defensible Fuel Profile Zone, group selection, riparian hardwood restoration, road reconstruction, decommissioning, temporary road construction and subsequent decommissioning.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29414 |
|||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 24N R 13E Sec. 3-10, 14-20, 22, 23,25, 26, T 24N R 12E Sec. 1, 2, 11-15, 21-24, T 25N R 12E Sec. 1, 12, 13, 22-27, 33-36, T 25N R 13E Sec. 2-11, 15-22, 27-34. The project area is located near Lake Davis and is approximately 5-10 miles north of the town of Portola. | |||||
|
Jackson Project (old name Happy Jack Project) EA |
- Fuels management - Watershed management |
In Progress: Scoping Start 09/25/2010 Est. Objection Period Legal Notice 01/2011 |
Expected:04/2011 |
06/2011 |
Russell Nickerson 530-836-2575 rnickerson@fs.fed.us |
| Description: Defensible Fuel Profile Zone (DFPZ), Group Selection (GS) in addition to, Wildland Urban Interface fuels reduction. Road reconstruction, decommissioning and construction, approx. 10-miles of temp road construction and subsequent decom.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=20332 |
|||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T22N, R11E; T22N, R12E; T23N, R11E; T23N, R12E. Approximately 4-11 miles northwest of Portola and 1-7 miles north of Graeagle. | |||||
|
Lake Davis Kiosk Remodel EA |
- Facility management |
In Progress: 215 Comment Period Legal Notice 03/23/2011 |
Expected:04/2011 |
05/2012 |
Judy Schaber (530) 836-7126 jschaber@fs.fed.us |
| Description: Remodel the existing kiosk into a sheltered picnic area. Install a new vault toilet with the Sweet Smelling Toilet Design. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N R13E Section 2. Lake Davis Recreation Area, at dam. | |||||
|
Lake Davis Trail phase 2 CE |
- Recreation management |
In Progress: Scoping Start 12/08/2010 |
Expected:04/2011 |
06/2012 |
Judy Schaber (530) 836-7126 jschaber@fs.fed.us |
| Description: Continue the non-motorized Lake Davis Trail around Lake Davis from just south of Lightning Tree Campground around the northwest side of the lake. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R13E Sections 20, 21, 2229, 32, & 33 and T23N R13E Sections 3 & 10. Lake Davis Recreation Area. | |||||
|
Last Chance Creek Watershed Restoration Project Phase II EA |
- Watershed management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:11/2011 | 06/2012 |
Antonio Duenas 530-836-7156 tduenas@fs.fed.us |
| Description: Restore the hydrologic function of approximately 8 miles (5 miles located on public lands) of Last Chance Creek . | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N R13E Sections 14, 12 & 11 and T26N R14E Sections 27, 26, 23, 22, 18, 17, 16, 15, 8 & 7. Last Chance HUC 5 Watershed. | |||||
|
Meadow Restoration Monitoring and Evaluation CE |
- Research |
In Progress: Scoping Start 11/17/2010 |
Expected:06/2011 |
06/2011 |
Antonio Duenas 530-836-7156 tduenas@fs.fed.us |
| Description: A Standford University Graduate Student will be monitoring and evaluating the state of the hydrologic system and flows of water across the meadow landscape within meadow restoration sites on the Beckwourth Ranger District. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R13E, S4, T25N, R13E, S2, 25, 33&36, T26N R13E, S 1, 3, 10&14, T26N R14E, S 16, 17, 19, 23, 24, 29&30, and T27N R13E, S 36,. Eighty-four Individual monitoring site locations throughout the Beckwourth Ranger District. | |||||
|
Meadowview/Rowland Restoration Project EA |
- Watershed management |
In Progress: Scoping Start 03/17/2010 Est. 215 Comment Period Legal Notice 05/2011 |
Expected:08/2011 |
08/2012 |
Brendan Waterman 530-836-2575 bwaterman@fs.fed.us |
| Description: Project consists of restoring two eastside montane meadows (252 acres) and improving channel stability for 2.3 miles within the Upper Feather River Watershed on Last Chance and Rowland Creeks.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28848 |
|||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N R16E, Section 13 and T25N R15E, Sections 7, 8, 18 & 19. Last Chance Creek and Frenchman Lake Hydrologic Unit Code (HUC) 5 Watershed. | |||||
|
Nelson Creek Historic Trail EA |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 11/17/2010 |
Expected:04/2011 |
06/2011 |
Judy Schaber (530) 836-7126 jschaber@fs.fed.us |
| Description: Reopen the historic Nelson Creek Trail from Zumwalt Flat to the LaPorte Rd. Add a few sections of new trail to connect existing trail or correct over grade problems is also being planned. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N R10E Sections 36,35, 26, 23, 22, 15. Zumwalt Flat to the La Porte Rd. | |||||
|
Peters Road Project EA |
- Road management | Completed | Actual: 02/22/2011 | 02/2011 |
Kyla Sabo 530-836-2575 kylasabo@fs.fed.us |
| Description: Construct a new road to provide access through the Plumas National Forest to a private land parcel that currently is inaccessible. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 25N, R 16E, Sections 19 and 30. Four miles north of Frenchman Lake, Plumas County, CA. | |||||
|
Sulphur and Barry Creek Restoration Project EA |
- Watershed management |
Developing Proposal Est. Scoping Start 03/2012 |
Expected:10/2012 | 06/2013 |
Antonio Duenas 530-836-7156 tduenas@fs.fed.us |
| Description: Project consist of restoring approximately 0.5 mile of Sulphur Creek (0.28 mile) and Barry Creek (0.24 mile). Project may also include a Timber Sale component for the removal of encroaching conifers on cottonwood stands within the project area. | |||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R13E Sections 4 & 5. Lake Davis - Long Valley Hydrologic Unit Code (HUC) 5 Watershed. | |||||
|
Upper Dotta Canyon Restoration Project EA |
- Watershed management |
In Progress: Scoping Start 03/17/2010 Est. 215 Comment Period Legal Notice 03/2011 |
Expected:07/2011 |
08/2011 |
Brendan Waterman 530-836-2575 bwaterman@fs.fed.us |
| Description: Project consists of restoring an eastside montane meadow (253 acres) and improving channel stability for 2.9 miles on Red Clover Creek within Dotta Canyon.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28849 |
|||||
| Location: UNIT - Beckwourth Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N R14E, Sections 25, 26, & 36. Red Clover Creek Hydrologic Unit Code (HUC) 5 Watershed. | |||||
| Back To Top | |||||
Plumas National Forest, Feather River Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bloomer and Sawmill Fire Lookout Hazard Reduction/Sight Path Clearing CE *NEW LISTING* |
- Forest products - Fuels management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:01/2012 | 05/2012 |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: The intent of these projects is to clear a site path to reestablish view path from the lookouts to communities, and individual homes at risk, and high hazard/risk areas that have been obscured by tree growth since the lookouts were established. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Bloomer Lookout- T. 21N R. 5E, Section 30. Sawmill Peak Lookout- T. 23N R. 4E, Section 32. Bloomer Lookout, in Butte County, near Berry Creek off Rd 21N39 (50 acres NW of tower.) Sawmill Peak Lookout, in Butte County, near Magalia (20 acres East of tower). | |||||
|
Burnt Bridge/Cottage Creek Blackoak Enhancement CE |
- Wildlife, Fish, Rare plants | On Hold | N/A | N/A |
Cindy Roberts 530-532-7467 ckroberts@fs.fed.us |
| Description: Thin out small size conifers, less than 10 inch diameter, within a blackoak habitat area. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Yuba. LEGAL - T19N R7E Sections 15 and 26. Dobbins watershed; near Challenge., CA. | |||||
|
California Department of Water Resources - Amend permit to install a streamgauge at 2nd location CE |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:04/2011 | 06/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: CA DWR proposes to install a streamgauge station at the PG&E Miocene Dam near Magalia. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - SE 1/4 of SW 1/4 of Section 30, T23N, R4E. Miocene Dam near Magalia, California. | |||||
|
Challenge Work Center Invasive Species Management Project CE |
- Vegetation management (other than forest products) - Facility management |
Cancelled | N/A | N/A |
Chris Christofferson 530-532-7473 cchristofferson@fs.fed.us |
| Description: This project is designed to control non-native invasive plant species at the Challenge Work Center Administrative Site utilizing IPM practices. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Yuba. LEGAL - T21N, R6E, Sec 7. Challenge Work Center, Feather River Ranger District located in the town of Challenge, CA. | |||||
|
Concow Hazardous Fuels Reduction Project EIS |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: DEIS NOA in Federal Register 09/30/2010 Est. FEIS NOA in Federal Register 03/2011 |
Expected:05/2011 |
03/2011 |
Carol Spinos 530-534-6500 cspinos@fs.fed.us |
| Description: Reduce hazardous fuels and restore ecosystems affected by high-intensity wildfire near Paradise, Magalia, Yankee Hill, and Concow.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=10083 |
|||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Townships 22, 23, and 24 north and Ranges 3, 4, 5, and 6 east. The Concow Project Area is bounded by the No. Fork of the Feather River on the east and Little Butte Creek on the west, in the Wildland Urban Interface near Paradise, Magalia, Pulga, and Concow, CA. | |||||
|
Grizzly Summit Hazard Tree Project CE |
- Forest products | On Hold | N/A | N/A |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: Hazard tree removal along Oro-Quincy Highway. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N, R6E, Sections 28, 21, 22, 15, 14 and 11, MDM. Seven miles southwest of Bucks Lake on Highway 162. | |||||
|
Hawkeye Tunnel Mining Plan of Operation CE |
- Minerals and Geology |
In Progress: Scoping Start 11/25/2009 |
Expected:01/2011 |
06/2011 |
Donna Duncan 530-532-7461 dmduncan@fs.fed.us |
| Description: Underground mining operation, gravel washing and incidental occupancy for purpose of minerals extraction. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Sierra. LEGAL - T21N, R9E, Sec. 5, off Sierra County 690 Rd. Howland Flat, Sierra County. | |||||
|
Howland Flat Reforestation CE |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 05/2011 |
Errol Solomon 530-532-7413 esolomon@fs.fed.us |
| Description: The Feather River Ranger District (PNF) is proposing to reforest and release 30 acres of high mortality (burned) areas within the Howland Flat fire boundary over the next 5 years. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T21N R9E S12. Adjacent to the Howland Flat Cemetary and the La Porte community. | |||||
|
Know Nothing Roadside Timber Sale CE |
- Forest products - Road management |
On Hold | N/A | N/A |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: Removal of hazard trees along approximately 4 miles of forest roads 20N24, 22N24, and 21N16in the vicinity of Sly Creek Res (roads are near Know Nothing Creek). (R. 7& 8 E., T. 20N) | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - All or portions of Sections 4, 5, 7, 8, & 18 T. 20 N. R. 8 E. and Sections 1, 2, & 12 T. 20 N. , R. 7 E. MDM. Near Strawberry Valley CA, in Butte County along approximately 4 miles of forest roads 20N24, 22N24, and 21N16in the vicinity of Sly Creek Res. (R. 7& 8 E., T. 20N). | |||||
|
La Porte-Quincy Hazard Tree CE *NEW LISTING* |
- Forest products - Fuels management - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:01/2012 | 06/2012 |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: Tree mortality is occurring along La Porte Quincy Highway from the intersection with FS Road 514 to the intersection with 23N60Y. The unit includes areas in T. 21N, R9E, Secs. 2,3,10. and T. 22N, R9E., Secs. 5, 8, 17, 18, 19, 25, 30, 32, 35, 36 | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T. 21N, R9E, Sections 2,3, and 10. and T. 22N, R9E., Sections 5, 8, 17, 18, 19, 25, 30, 32, 35, 36. MDM. La Porte-Quincy Hwy in Plumas County near La-Porte, along approx 6 miles, from intersection with FS Road 514 to the intersection with 23N60Y Rd. | |||||
|
Little Grass Valley Campground Restoration CE |
- Land management planning - Recreation management - Vegetation management (other than forest products) |
In Progress: Scoping Start 06/01/2009 |
Expected:07/2010 |
07/2010 |
Errol Solomon 530-532-7413 esolomon@fs.fed.us |
| Description: This project involves interplanting conifers for forest health while providing privacy screening within the campgrounds | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - 5 sites in T22N R9E S27, 28, 31, 33, 34. Little Grass Velley Campground - Road 57. | |||||
|
Milsap Bar Campground Rehabilitation CE |
- Recreation management | On Hold | N/A | N/A |
Deb Schoenberg 530-532-7460 dschoenberg@fs.fed.us |
| Description: The project consists of maintenance, rehabilitation, modernization and resource protection within the footprint of an existing developed campground. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. T21N, R6E, Sec.2, on the Middle Fork Feather River at 22N62 Road, within the footprint of the Milsap Bar campground. | |||||
|
On Top Hazardous Fuels Reduction Project EIS EIS |
- Vegetation management (other than forest products) - Fuels management |
In Progress: NOI in Federal Register 02/22/2011 Est. DEIS NOA in Federal Register 06/2011 |
Expected:10/2011 |
05/2012 |
Carol Spinos 530-534-6500 cspinos@fs.fed.us |
| Description: This project proposes to reduce the risk from wildfires to rural communities and forest resources, improve forest health and contribute to the economic stability of rural communties near Bucks Lakes and surrounding areas.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31263 |
|||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte, Plumas. LEGAL - T22N, R6E, S1-2, 11. T22N, R8E, S5-6. T23N, R6E, S2-3, 10-15, 19-23, 26-30, 33-36. T23N, R7E, S7, 10, 12-16, 18, 21-25, 36. T23N, R8E, S18-20, 29-35. Bucks Lake area from Soapstone Hill on the west, to Mt. Ararat on the east. | |||||
|
Pacific Gas and Electric Company - 12 KV power line extension CE |
- Special use management | On Hold | N/A | N/A |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Extension of an existing 12 KV power line in the Concow area along the Rim Road (FS Road 23N06). The proposed line extension is approximately 1900' with approximately 875' on National Forest System lands. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - SW 1/4 Section 12, T22N, R4E. Along the Rim Road in the Concow area. | |||||
|
Pendola Silviculture Project CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 05/2011 |
Errol Solomon 530-532-7413 esolomon@fs.fed.us |
| Description: The Feather River Ranger District (PNF) is proposing to treat a minimum of 160 acres of plantation ground within the Pendola boundary. Treatments will include: mastication, hand cutting and piling, pile burning, under burning, reforesting and release | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T18N R7E S2,11,12, 14, 15, and 26. Located near Bullards Reservoir and adjacent to the Challenge community. | |||||
|
Provost, Leonard - new permit for existing access road. CE |
- Special use management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:06/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued use and maintenance of an existing access road, approximately 150' on National Forest System lands, to private property. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T22N, R9E, Section 34. Near Little Grass Valley Reservoir, north of La Porte, California. | |||||
|
Silvertip Roadside Hazard Timber Sale CE |
- Forest products - Road management |
Completed | Actual: 02/25/2011 | 07/2011 |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: Removal of hazard trees along approximately 4 miles of forest road 22N60 road (silvertip road) in T.22N R.9E. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - All or portion of Sections 12, 13, 14, 22, 23, and 27 - T. 22N., R. 9E. MDM. Silvertip Rd in Plumas County near LaPorte, along approximately 4 miles of forest road 22N60 (silvertip road) from pvt boundary in sec 27 to junction with 22N27 in sec 12 - T.22N R.9E. | |||||
|
South Feather Water & Power Agency - Special Use Authorization CE |
- Special use management | Cancelled | N/A | N/A |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of facilities and campgrounds associated with the Sly Creek Recreation Area near Strawberry Valley, CA. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Portions of Sections 16, 17, 18, & 19, T20N, R8E, MDM. Approximately 2 miles north of Strawberry Valley, CA. | |||||
|
South Feather Water & Power Agency Antennae Placement CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:04/2011 | 06/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: SFW&PA proposes to install an 18' tall antennae approximately 25' from the existing South Fork Feather River stream gauge station to provide for realtime data relay of instream flows. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Plumas. LEGAL - SW 1/4 Section 22, T22N, R9E. South Fork Feather River, just above Little Grass Valley Reservoir. | |||||
|
Sunset Lookout Hazard Reduction and Sight Path Clearing CE *NEW LISTING* |
- Forest products - Fuels management - Facility management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:09/2011 | 01/2012 |
Eric Murphy 530-532-8922 ejmurphy@fs.fed.us |
| Description: The intent of this project is to clear a site path to reestablish a view path from the lookout to communities, and individual homes at risk, and high hazard/risk areas that have been obscured by tree growth since the lookouts were established. | |||||
| Location: UNIT - Feather River Ranger District. STATE - California. COUNTY - Butte. LEGAL - Township 19 North Range 6b East, Northwest corner of Section 9. Sunset Hill Lookout in Butte County near Forbestown, off Forbestown Road, in T 19N. R. 6E. Section 9. | |||||
| Back To Top | |||||
Plumas National Forest, Mt. Hough Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
ATT Passive Reflector Amendment Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 07/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Amend the current permit to include a new location along Forest road 26N26 and an existing repeater site would be developed by installing two 35 foot poles, 6 feet apart to house microwave antennaes, solar charger & panel and radio cabinet. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N R7E Section 7 and T25N R8E Section 28. Forest road 26N26 and Twelve Mile Bar. | |||||
|
American Valley Hazardous Fuels Reduction Project CE |
- Fuels management |
In Progress: Scoping Start 02/03/2010 |
Expected:04/2011 |
04/2011 |
Ryan Bauer 530-283-7673 rbauer@fs.fed.us |
| Description: Hand-thinning, piling and burning, mastication, and underburning to reduce hazardous fuels on approximately 346 acres of public land adjacent to private lands within the WUI around Quincy, CA.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30042 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R10E, Sections 8, 15, 16, 17, 19 and 22. T24N, R9E, Section 24. East and south of American Valley and the community of East Quincy, California. | |||||
|
Antelope Lake Eagle Nest Stand Fuels Reduction CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Fuels management |
Completed | Actual: 02/16/2011 | 06/2011 |
Gary Rotta 530-283-0555 grotta@fs.fed.us |
| Description: This project proposes to reduce ground fuels in order to help protect residual pines of all ages within the Boat Ramp Bald Eagle nest stand from wildfire or a future underburn. Additional standing dead ladder fuels would be felled, piled and burned.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34923 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N, R12E, Section 23 MDBM. The Antelope Lake Eagle Nest Stand Fuels Reduction Project is located near the boat ramp at Antelope Lake. | |||||
|
Antelope Lake Picnic Rehabilitation CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 07/2012 |
Peggy Gustafson 530-283-7622 jschaber@fs.fed.us |
| Description: Remove existing toilet building and install new vault toilet. Replace existing picnic tables with refurbished tables and expand to 10 picnic sites. Install barriers to allow access to picnic sites and prevent driving outside sites. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N R12E Section 23. Antelope Picnic Area, Antelope Lake. | |||||
|
Belden, Eva, Alta, Long Bar Placer Exploration Project EA |
- Minerals and Geology | Cancelled | N/A | N/A |
Leslie Edlund 530-283-7650 ledlund@fs.fed.us |
| Description: Exploratory mining operation involving removal of flood overburden with a backhoe and bulldozer. Samples would be transported to a processing unit consisting of a wash plant, sluice boxes and settling pond using water from the river. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R6E, Section 24, MDBM. Belden, CA along the south side of the Feather River. | |||||
|
Bucks Lake Fuels Reduction and Roadside Hazard Tree Removal Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:04/2012 | 08/2012 |
Michelle Coppoletta 530-285-0555 mcoppoletta@fs.fed.us |
| Description: Removing hazardous trees along roads and recreation sites, thinning along roadways to reduce fuels, and implement road maintenance activities to restore watershed health.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=18963 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N, R7E, Sections 1,3,4,9,11,12. T23N, R8E, Sections 5,6,7,18. T24N, R7E, Sections 27, 28, 29, 32, 36. T24N, R8E, Sections 18 and 32. The project is located about 10 miles west of Quincy, California. National Forest System Roads 24N24, 24N29Y, 24N33, 24N34, 24N87X and Plumas County roads 414 and 423. | |||||
|
Bucks Lake Lodge Reconstruction Project EA |
- Recreation management |
In Progress: Scoping Start 12/22/2010 Est. 215 Comment Period Legal Notice 04/2011 |
Expected:05/2011 |
06/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Reconstruction of the main building of the Bucks Lake Lodge which burned in Jan 2010. The lodge would consisit of a restaurant, bar and store approximately 1400 to 2000 square feet in size. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N, R7E, Section 3, MDBM. Bucks Lake along the Oroville-Quincy Highway. | |||||
|
Cattle Springs MYLF Project CE |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 10/07/2010 |
Expected:04/2011 |
06/2011 |
George Garcia 530-283-7828 gcgarcia@fs.fed.us |
| Description: This project will deepen two existing ponds at Cattle Springs in order to provide better overwintering habitat for first year Mountain Yellow-legged Frog tadpoles. This project will also construct a small exclosure fence around the ponds.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34125 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 23N, R9E, Section 9. This project is located at Cattle Springs where NFS Road 23N68 terminates. | |||||
|
Dark Ravine Placer Exploration Project CE |
- Minerals and Geology |
In Progress: Scoping Start 12/14/2010 |
Expected:05/2011 |
06/2011 |
Leslie Edlund 530-283-7650 ledlund@fs.fed.us |
| Description: This mining exploration project would first using a mini excavator and highbanker to process gravel deposits in the upper portion of the claim. The next phase would use a portable trommel and backhoe to test the thicker gravel deposits. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R8E, Sections 23 & 24, MDBM. 5 miles southwest of Greenville, CA in Dark Ravine. | |||||
|
Dawn Institute - new permit for existing water system CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued use and maintenance of an existing water system that supplies water, including two spring boxes, one pump housing, electrical box and appurtenances, and approximately 1600' of pipe line. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R9E, Section 3. Near Indian Falls. | |||||
|
Farnworth, Melvin & Dorothy - new permit for existing water system. CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of a water system, including reservoir and access road. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R10E, Section 15. Approximately 2 miles east of Quincy, California. | |||||
|
Greenhorn Creek Restoration Project EA |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 09/15/2010 Est. 215 Comment Period Legal Notice 05/2011 |
Expected:07/2011 |
08/2011 |
Kelby Gardiner 530-283-7686 kgardiner@fs.fed.us |
| Description: A RAC project proposed to restore trout populations and bank stability to Greenhorn Creek in American Valley. Fish passage and bank stabilization improvements would be made in six locations along Greenhorn Creek.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31639 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - The project is located in Township 24N, Range 10E and Sections 21, 16, 17, 8 and 7. The project area encompasses private lands and NFS land along Greenhorn Creek in American Valley. | |||||
|
Hallsted Campground Rehabilitation Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 08/2011 |
Erika Brenzovich 530-283-5189 ebrenzovich@fs.fed.us |
| Description: Rehabilitatation of Hallsted Campground includes replacing the restroom and campground amenities, resurfacing camp spurs and roads, replacing the electrical distribution and water systems, and developing accessible campsites and river access. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T 25N, R8E, Section 22. Hallsted Campground is located approximately 18 miles from Quincy; the nearest town is Twain. | |||||
|
Halstead Campground Timber Sale CE |
- Recreation management - Facility management |
Completed | Actual: 01/06/2011 | 06/2011 |
Andrew Hart 530-283-7643 ajhart@fs.fed.us |
| Description: The purpose of this project is to remove approximately 25 hazard trees and slash within Halstead Campground in order to create a safer facility.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34128 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R8E, section 22 MDBM. The Halstead Campground Timber Sale is located northeast of Twain on Highway 70. | |||||
|
Hyde, David - new permit for existing water system CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of a water system that includes an intake box and approximately 200' of 4" pipe line is on National Forest System lands. Supplies water for domestic purposes. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R10E, Section 12. 3 1/2 miles southeast of Taylorsville. | |||||
|
Jatczak, Casimir and Diane - new permit for existing water system CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued use and maintenance of an existing water system, including 1550' of 4" water line and a collection box. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R8E, Section 14. Highway 70 corridor near Twain. | |||||
|
Keddie Hazardous Fuels Reduction Project EIS |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: NOI in Federal Register 04/01/2010 Est. DEIS NOA in Federal Register 02/2011 |
Expected:08/2011 |
06/2012 |
Katherine Carpenter 530-283-7619 kacarpenter@fs.fed.us |
| Description: Construction of fuelbreaks known as Defensible Fuel Profile Zones, thinning and group selection harvests, protection and enhancement of sensitive plant and wildlife habitat, road improvements, and noxious weed treatments.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=19040 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - Keddie Project is 103,329 acres. Please see "Other Project Information" for the "Legal Land Description". Keddie Project is within the vicinity of Keddie Ridge, Round Valley Reservoir, and Mt. Jura. Communities within include Greenville, Crescent Mills, and Taylorsville, California. | |||||
|
Keddie Ridge Roadside and Deck Salvage Sale Project CE |
- Forest products - Vegetation management (other than forest products) |
In Progress: Scoping Start 10/14/2010 |
Expected:04/2011 |
06/2011 |
Andrew Hart 530-283-7643 ajhart@fs.fed.us |
| Description: This project proposes to remove three decks on National Forest System roads 27N19 and 27N19X created during the Moonlight Fire of 2007. Additionally, this project would remove roadside hazards along nine miles of NFS roads 28N32, 27N19, and 27N19X.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34562 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N, R10E, Sections 17, 20, 28, and 29. The three decks lie along NFS roads 27N19X and 27N19 and the roadside hazard tree removal would occur along nine miles of NFS roads 28N32, 27N19, and 27N19X south of the Lassen County line. | |||||
|
Lost Cove Boat Launch Maintenance and Improvements CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 09/2012 |
Peggy Gustafson 530-283-7622 jschaber@fs.fed.us |
| Description: Maintain existing parking area with chipseal overlay and replace substandard boat ramp with V grooved cement. Install: Two ADA parking spaces with pathway; a vault toilet; 3 picnic tables with shade structure; and 7 boat trailer parking spaces. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N R12E Section 23. Lost Cove Boat Launch, Antelope Lake. | |||||
|
Massack Water User Association - new permit for an existing water system. CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of an existing water system, including approximately 6,900' of 2" diameter pipeline, a storage tank, and springbox, which supplies water to the Association. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R10E, Sections 23 and 26. Approximately 5 miles east/southeast of Quincy, California. | |||||
|
Meadow Valley Barracks PSW CE *NEW LISTING* |
- Facility management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 08/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Demolish the existing Teachers Assistant building and replace it with a new Region 5 standard barracks building. Install new septic system and well and electrical hookup. The construction site would be approximately .25 acres. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R8E, Section 27. U.C. Berkeley Forestry Camp, Meadow Valley. | |||||
|
Mt. Hough Deer Habitat Improvement Burn CE *NEW LISTING* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 02/28/2011 |
Expected:07/2011 |
03/2012 |
Gary Rotta 530-283-0555 grotta@fs.fed.us |
| Description: This project is proposed to set back the successional growth of existing 45+ year old shrubland habitat to allow for improved forage quality and foraging access for mule deer by broadcast burning 730 acres between Tollgate Creek and Gilson Creek.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35174 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R9E, Sections 20, 21, 28, and 29. The proposed action would occur between Tollgate Creek and Gilson Creek on the west side of Mt. Hough, near Quincy, CA. | |||||
|
Oakland Camp water and sewer improvements CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 07/2011 |
Peggy Gustafson 530-283-7622 jschaber@fs.fed.us |
| Description: Sewer improvements include relocation of the existing leach field and replacement a portion of exisiting sewer line. Water system improvements would add a new 10,000 gallon tank. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N R10E Section 31. Oakland Camp, Oakland Camp Road. | |||||
|
Peter, James - new permit for existing water system. CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of a water system that includes a concrete diversion dam (2' x 15'), and 3,380' of 8" diameter pipeline. Supplies water for irrigation purposes and hydroelectric power. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T26N, R10E, Sections 7 and 8. Approximately 5 miles northeast of Taylorsville, CA. | |||||
|
Rattlesnake Hill Timber Sale CE |
- Vegetation management (other than forest products) - Special use management |
In Progress: Scoping Start 10/12/2010 |
Expected:04/2011 |
06/2011 |
Andrew Hart 530-283-7643 ajhart@fs.fed.us |
| Description: This project is proposed to sell trees felled and left in place by CA Department of Water Resources near the Rattlesnake Hill snow sensor site. This project would also fell and remove roadside hazard trees on NFS road 26N38 leading to the site.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34163 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T27N, R8E, Sections 33, 35, and 35; T26N, R8E, Sections 2 and 11. Trees would be removed at the Rattlesnake Hill snow sensor site and along 4.6 miles of NFS road 26N38 from Seneca road up to the snow sensor site. | |||||
|
Robbins, James & Lois - new permit for an existing water system. CE |
- Special use management | Completed | Actual: 03/03/2011 | 07/2011 |
Linda Morehouse Braxton 530-534-6500 lmorehousebraxton@fs.fed.us |
| Description: Continued operation and maintenance of an existing water system, consisting of a stream diversion with a 2' x 4' collection box and approximately 1,260' of buried steel and plastic pipeline. Supplies water for irrigation and firefighting purposes. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R8E, Section 23. Approximately 1 1/2 miles east of Twain, California. | |||||
|
Snake Lake Campground Enhancement Project EA |
- Recreation management |
In Progress: Scoping Start 12/29/2010 Est. 215 Comment Period Legal Notice 04/2011 |
Expected:05/2011 |
06/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Improvements to the existing Snake Lake CG including 8 new equestrian campsites, 15 picnic tables, fire rings, grills, handicapped accessible route to the restroom, 8 horse corrals and mounting ramps, access road and spurs for new sites and thinning. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T25N, R9E, Section 6, MDBM. Snake Lake Campground, 4 miles northwest of Quincy, CA. | |||||
|
Snake Lake Meadow Thinning II Project CE *NEW LISTING* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 12/01/2010 |
Expected:04/2011 |
06/2011 |
Gary Rotta 530-283-0555 grotta@fs.fed.us |
| Description: This joint project with the Mule Deer Foundation proposes to improve summer range foraging habitat and maintain habitat diversity for the Sloat Deer Herd through piling and burning in order to maintain open, early seral and meadow habitat.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34921 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R9E, Section 5, MDBM. Project treatments would occur on the east side of Snake Lake. | |||||
|
Taylor Made Placer Exploration CE *NEW LISTING* |
- Minerals and Geology |
In Progress: Scoping Start 02/02/2011 |
Expected:05/2011 |
06/2011 |
Peggy Gustafson 530-283-7650 ledlund@fs.fed.us |
| Description: Plan of Operations for exploratory trenching in the Taylor Gulch area. The proposal includes excavation with a mini excavator to remove overburden. Material would be screened with a metal detector. Material will be replaced after processing. | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R8E, Sections 33 & 34, MDBM. Taylor Gulch, access is through Meadow Valley to NFS Road 23N16 to NFS Road 23N16A. | |||||
|
Union Pacific Railroad, Canyon Subdivision, Culvert Replacement Project EA |
- Land ownership management |
In Progress: Scoping Start 11/10/2010 Est. 215 Comment Period Legal Notice 06/2011 |
Expected:08/2011 |
09/2011 |
Peggy Gustafson 530-283-7620 pgustafson@fs.fed.us |
| Description: Installing new culverts and construction of staging areas & access roads to facilitate the replacements. New culverts will be installed either in place of the existing culverts or above the existing structures (some existing culverts will be plugged) | |||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Butte, Plumas. LEGAL - T22N, R4E, Sec 30; T22N, R4E, Sec 22; T24N, R6E, Sec 10; T25N, R6E, Sec 35; T25N, R9E, Sec 15 MDBM. Multiple Locations in Plumas and Butte Counties. | |||||
|
Waters 2011 Timber Stand Improvement Project CE *NEW LISTING* |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 01/12/2011 |
Expected:07/2011 |
08/2011 |
Linda Smith 530-283-7628 llsmith@fs.fed.us |
| Description: The project would masticate approximately 589 acres of plantations in order to improve growth and vigor of residual trees, reduce stand brush fuel accumulations, and enhance the development of existing plantations into mature timber stands.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34893 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T23N, R8E, Sections 1-4, 8, 10-14, 17. T23N, R9E, Sections 6, 7, 18. T24N, R8E, Section 36. T24N, R9E, Sections 31 and 32. Project units surround Third Water Creek in Meadow Valley, CA between the Big Creek drainage and Deanes Valley. | |||||
|
Wildcat/Boulder Restoration Project EA |
- Watershed management |
Developing Proposal Est. Scoping Start 09/2011 |
Expected:07/2012 | 08/2012 |
Kelby Gardiner 530-283-7686 kgardiner@fs.fed.us |
| Description: Stabilize stream bed, improve aquatic species passage, and reduce sediment transport rates.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32416 |
|||||
| Location: UNIT - Mt. Hough Ranger District. STATE - California. COUNTY - Plumas. LEGAL - T24N, R12E, Sections 2 and 15; T24N, R 13E, Section 31; T28N, R12E, Sections 21, 26, 27 and 36. Boulder Creek and Thompson Creek, north of Antelope Lake. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||