Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R5 - Pacific Southwest Region, R5 - Pacific Southwest Region All Units, Forestwide (excluding Projects occurring in more than one Forest) - R5 - Pacific Southwest Region, Six Rivers National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R5 - Pacific Southwest Region, Six Rivers National Forest, Occurring in more than one District (excluding Forestwide) - R5 - Pacific Southwest Region, Six Rivers National Forest, Gasquet Ranger District/Smith River NRA (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Six Rivers National Forest, Lower Trinity Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Six Rivers National Forest, Mad River Ranger District (excluding Projects occurring in more than one District) - R5 - Pacific Southwest Region, Six Rivers National Forest, Orleans Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 12/18/2009 Est. DEIS NOA in Federal Register 12/2010 |
Expected:11/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 01/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R5 - Pacific Southwest Region All Units, Forestwide (excluding Projects occurring in more than one Forest) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Historic Facilities BMP Retrofit CE *NEW LISTING* |
- Facility management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:03/2011 | 09/2011 |
Ashley Sommer 530-543-2615 asommer@fs.fed.us |
| Description: Water quality BMP installation at the Tallac Historic Site (inc. Kiva Beach), the Newhall House at Skunk Harbor, Meiss Cabin and Old Mill. | |||||
| Location: UNIT - R5 - Pacific Southwest Region All Units. STATE - California, Nevada. COUNTY - El Dorado, Placer, Carson City (city). Tallac Historic Site, Kiva Beach, Skunk Harbor and Meiss. | |||||
|
Meeks Bay Resort BMP Retrofit CE *NEW LISTING* |
- Facility management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:03/2011 | 08/2011 |
Ashley Sommer 530-543-2615 asommer@fs.fed.us |
| Description: Implement water quality BMP's at the resort | |||||
| Location: UNIT - R5 - Pacific Southwest Region All Units. STATE - California. COUNTY - El Dorado. Meeks Bay Resort. | |||||
|
Willaim Kent Campground BMP Retrofit and Administrative Site Redevelopment EA *NEW LISTING* |
- Recreation management - Facility management |
In Progress: Scoping Start 11/26/2010 Est. 215 Comment Period Legal Notice 05/2011 |
Expected:06/2011 |
09/2011 |
Ashley Sommer 530-543-2615 asommer@fs.fed.us |
| Description: BMP retrofit of campground and day use beach site. Redevelopment of administrative site to include a fire station, employee offices and public information center. | |||||
| Location: UNIT - R5 - Pacific Southwest Region All Units. STATE - California. COUNTY - Placer. William Kent Campgrond, day use beach site and adminisrative site. | |||||
| Back To Top | |||||
Six Rivers National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Forest-Wide Integrated Management of Invasive Non-Native Plant Species CE *NEW LISTING* |
- Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:01/2011 | 04/2011 |
Lisa Hoover 707-441-3612 lhoover@fs.fed.us |
| Description: To manually treat invasive non-native plants by hand or hand-tools in previously disturbed sites Forest-wide. Integrated methods include temporary placement of weed cloth to reduce seed bank germination and revegetation with native plants. | |||||
| Location: UNIT - Six Rivers National Forest All Units. STATE - California. COUNTY - Del Norte, Humboldt, Siskiyou, Trinity. Forest Wide, Humboldt, Del Norte, Trinity and Siskiyou Counties. | |||||
| Back To Top | |||||
Six Rivers National Forest, Occurring in more than one District (excluding Forestwide) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
PG&E Forest Wide Powerline Authorization CE |
- Special use management |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:12/2010 | 01/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Reauthorization of all of PG&E's existing uses on the Six Rivers NF and the Ukonom RD of the Klamath NF | |||||
| Location: UNIT - Orleans Ranger District, Lower Trinity Ranger District, Mad River Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T11N R5&6 E, T10N R5E, T7N R4&5E, T6N R4,5&6E, T5N R5&6E, T4N R4&5E, T1N R5&6E, T1S R6&7E, T2S R7&8E, T3S R6&8E, HM. Projects crosses many of the Forests Management Areas within the Mad, Van Dusen, Trinity and Klamath River. | |||||
| Back To Top | |||||
Six Rivers National Forest, Gasquet Ranger District/Smith River NRA (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Abandoned Mine Safey Closure Project CE |
- Minerals and Geology - Land ownership management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:01/2011 | 06/2011 |
Curtis Cross (707) 441-3508 ccross@fs.fed.us |
| Description: Installation of gates or barriers to keep people out of abandoned mines | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - T18N, R1E - SEC.26, 35, 36; T17N, R2E - SEC.19 & 20; T18N, R2E- SEC. 3 & 10. Smith River National Recreation Area. | |||||
|
Gasquet Rock Pit Management Project CE |
- Road management | On Hold | N/A | N/A |
Kurt Werner 707-441-3633 kdwerner@fs.fed.us |
| Description: Reopening existing rock pit or develop new pits on existing distrubed sites to obtain gravel for road maintnenace projects | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - 18N 3E, S9; 16N, 2E, S11; and 15N, 2E, S4. Smith River National Recreation Area. | |||||
|
Gordon Hill Vegetation Management Project EA |
- Heritage resource management - Special area management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:08/2011 | 10/2011 |
Brenda Devlin 707-457-3131-3862 bdevlin@fs.fed.us |
| Description: Integrated vegetation manamgment oproject that will meet objectives for fuels treatment, habiat restoration, and timber products | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - All or partially within T.17N.,R.1E.,Section 25; T.17N.,R.2E.,Sections 29-34; T.16N.,R.1E.,Sections 12,13; T.16N.,R.2E.,Sections 3, 5, 6, 8, 13, 14, 15, 17, 18, 20, 21, 22, 24, 25, 27, 28, 29, 35, 36;. The project area is located entirely within the French Hill Road area and Craigs, Coon, and Gordon drainages. | |||||
|
Klamath CSD Water Tank CE |
- Special area management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:12/2010 | 01/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Feasibility Study to place a new water tank within permit area Klamath Community Services District. | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - T13N R1E Sec 10, HM. Management Area - Recreation River; Watershed - Lower Klamath. | |||||
|
Smith River NRA Road Management and Route Designation Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Watershed management - Road management |
On Hold | N/A | N/A |
Mike McCain 707-457-3853 mmccain@fs.fed.us |
| Description: Road management, including improvements and restoration, and off-highway vehicle route desination. | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - T13N to T19S, R1E to R5E. Smith River National Recreation Area, Del Norte County, California. | |||||
|
Station 3 Fuel Break CE |
- Fuels management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:03/2011 | 06/2011 |
Sheila Balent 707-457-3968 sbalent@fs.fed.us |
| Description: roadside fuels treatment in a Wildland Urban Interface (WUI) | |||||
| Location: UNIT - Gasquet Ranger District/Smith River NRA. STATE - California. COUNTY - Del Norte. LEGAL - T17N, R1E, S 14, 15 HB&M. 17N21 road on Smith River NRA. | |||||
| Back To Top | |||||
Six Rivers National Forest, Lower Trinity Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Horse Linto Threatened and Endangered Fish and Wildlife Habitat Improvement Project CE *NEW LISTING* |
- Recreation management - Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:01/2011 | 07/2011 |
Andrea Collins 530-629-4930 acollins03@fs.fed.us |
| Description: Maintain existing fisheries instream structures and wildlife riparian habitat enhancements, as well as the recreational interpretive trail found within the Horse Linto and Cedar Creek watershed. | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T7N R5E, Sections 2, 3, &4; T8N R5E, Sections 34 &35. Lower Trinity Ranger District, Willow Creek, CA, Humboldt County, Riparian Reserve, Key Watershed-Horse Linto/Cedar Creek. | |||||
|
Kimtu CE |
- Special use management |
In Progress: Scoping Start 04/01/2003 |
Expected:12/2010 |
01/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Issuance of a term permit for use of Kimtu by the WIllow Creek Community Services District. | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T7N R5E Sec 28 HM. Management Area - Retention VQO, Watershed - Main Fork Trinity River. | |||||
|
Lower Trinity Plantation Thin and Timber Stand Improvement Project CE |
- Land management planning - Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:03/2011 | 06/2011 |
Daniel Wooden 541-560-3416 ddwooden@fs.fed.us |
| Description: Thinning of overstocked plantations and other previously managed stands that are less than 40 years of age to improve vigor and reduce hazardous fuels on the Lower Trinity Ranger District.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32315 |
|||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T4N, R5E, Sec. 3-5, 10-12, 15; T5N, R4E, Sec. 1-3, 11, 12, 24, 25; T5N, R5E, Sec. 3, 4, 8-11, 14-17, 19-24, 26-30, 32-35; T5N, R6E, Sec. 3-8, 17, 18, 30; T6N, R4E, Sec. 12-15, 22, 24, 25, 27, 34, 35. Lower Trinity Ranger District, Six Rivers Nation Forest, Trinity and Humbodlt Counties, California. | |||||
|
Mercer Fraser Gravel Storage Facility CE |
- Special use management |
Developing Proposal Est. Scoping Start 06/2011 |
Expected:11/2011 | 12/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Storage of river gravel associated with Mercer Fraser's adjacent gravel processiong operation. | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Section 29, T7N, R5E, HM, Allocation - VQO Retention, Watershed - Lower Trinity. UNIT - Lower Trinity RD, STATE - California, COUNTY - Trinity. | |||||
|
Mill Creek and Trinity Summit Allotments EIS |
- Grazing management |
In Progress: NOI in Federal Register 04/17/2009 Est. DEIS NOA in Federal Register 01/2011 |
Expected:05/2011 |
10/2011 |
Randi Paris 530-629-2118 rbparis@fs.fed.us |
| Description: Lower Trinity Ranger District proposes to authorize livestock grazing | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - within all or portions of T9NR5E, T9NR6E, T8NR5E, T8NR6E, T8NR7E, T7NR6E, T7NR7E. Lower Trinity Ranger District located adjacent to the the eastern boundary of Hoopa reservation includes portions of the Trinity Alps Wilderness area. | |||||
|
Oakes Waterline CE |
- Special use management |
In Progress: Scoping Start 10/01/2004 |
Expected:05/2011 |
06/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Springbox, storage tank and waterline | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Retention VQO, Riparian, Main Fork Trinity River. Lower Trinity Ranger District, California. Trinity T6N, R6E, Sec 14, HM. | |||||
|
Salyer VFD Waterline CE |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:07/2011 | 08/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Construct, use and maintain a 400 foot waterline and diversion from Salyer VFD station to Trinity River. | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Section 14, T6N, R6E, HM, Allocation - VQO Retention, Watershed - Middle Trinity. UNIT - Lower Trinity RD, STATE - California, COUNTY - Trinity. | |||||
|
Trinity River Community Protection Fuels Project CE |
- Fuels management |
In Progress: Scoping Start 12/06/2007 |
Expected:02/2011 |
04/2011 |
Daniel Wooden 530-629-2118 ddwooden@fs.fed.us |
| Description: Vegetation manipulation and dead fuel removal | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T7N R5E Sec 17,20,28,29,33; T6N R5E Sec 4,9,10,12,13,14,15,22,24,25,26; T6N R6E Sec 19,21,28,29,33,34. Lower Trinity Ranger District Watershed - Mainstem Trinity River. | |||||
|
Waterman West Integrated Vegetation Management Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 12/03/2009 Est. Objection Period Legal Notice 11/2010 |
Expected:01/2011 |
04/2011 |
Randi Paris 530-629-4289 rbparis@fs.fed.us |
| Description: Integration of fuel reduction and timber management under Healthy Forest Restoration Act. Commercial and pre-commercial thinning of natural and plantation stands. Emphasis on fuel reduction, biomass utilization and other commercial forest products. | |||||
| Location: UNIT - Lower Trinity Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T7N, R5E, SEC 9-11, 13-16, 21-28, 33-35; T7N, R6E, SEC 30-32; T6N, R5E, SEC 1-4, 10-12, 14-15; T6N, R6E, SEC 5-6. Waterman, Campbell, and Baldwin Ridges on the Lower Trinity Ranger District of Six Rivers National Forest. | |||||
| Back To Top | |||||
Six Rivers National Forest, Mad River Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Beaverslide Timber Sale and Fuel Treatment Project EIS |
- Forest products - Fuels management |
In Progress: FEIS NOA in Federal Register 10/22/2010 |
Expected:01/2011 Actual: 11/06/2009 |
03/2011 |
James Coots 707-574-6233 jcoots@fs.fed.us |
| Description: Timber harvesting through commercial thinning on about 2,800 acres, and non-commercial fuel treatment using manual,mechanical and prescribed burning methods on 2,700 acres. A supplemental EIS is in progress as a result of a decision reversal.
Web Link: http://www.fs.fed.us/r5/sixrivers/projects/ea/beaverslide |
|||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T2S, R7E; T2S, R8E; T3S, R7E and T3S, R8E Humboldt B&M; T26N, R12W and T27N, R12W Mount Diablo B&M. LRMP Management Areas: General Forest, Partial Retention Visual Quality Objective, Retention Visual Quality Objective, and Riparian Reserve. Non-key Watershed: Upper Mad River. | |||||
|
Buck Mountain Vegetation and Fuel Management Project EIS |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. NOI in Federal Register 01/2011 |
Expected:11/2011 | 08/2012 |
Jeff Jones 707-574-6845 jkjones@fs.fed.us |
| Description: Commercial thinning on about 1300 acres, oak release on 150 acres, timber stand improvement on about 500 acres, and fuel treatment in strategic locations on about 1500 acres. | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T1N, R5&6E, Humboldt B&M. LRMP Management Areas: Late-Successional Reserve, Riparian Reserve. Non-key Watershed: Van Duzen River. Van Duzen and Dinsmore WUI areas. | |||||
|
Don Bridge Waterline CE |
- Special use management |
In Progress: Scoping Start 04/01/2005 |
Expected:04/2011 |
06/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Use and Maintenance a spring diversion and waterline | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Trinity. LEGAL - Sec 20, 29 and 30 T2S R8E HM. Mgmt Area - VQO Retention, General Forest, Watershed - Upper Mad River. | |||||
|
George Wilson Water Use Permit CE |
- Special use management |
In Progress: Scoping Start 10/01/2004 |
Expected:08/2011 |
10/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Special use permit for water spring box and waterline. | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T1N R6E Sec 7, HM. Management Area - General Forest, Riparian; Watershed - Upper Van Duzen. | |||||
|
IPN Fiber Optic Cable Line CE |
- Special use management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:12/2010 | 05/2011 |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Installing 2.5 miles of fiber optic cable to existing PG&E Cottonwood-Humboldt Transmission line No.2 | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Humboldt, Trinity. LEGAL - T2N R5E Sec 2 and 12, T2N R6E Sec 17 and 35, T1NR6E Sec 1 HM. Management Area - Special Habitate and Partial Retention; Watershed Van Duzen and Middle Mad. | |||||
|
KZ Oak Restoration Project CE |
- Wildlife, Fish, Rare plants - Fuels management |
On Hold | N/A | N/A |
Daniel Dill 707-574-6849 drdill@fs.fed.us |
| Description: Fuel reduction and oak woodland restoration on approximately 895 acres of oak woodlands with conifer encroachment. Removal of brush and small diameter trees. | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T3S, R6E; T3S, R7E and T4S, R7E Humboldt B&M. LRMP Management Areas: General Forest, Special Habitat, and Riparian Reserve. Key Watershed: North Fork Eel River. | |||||
|
Kelsey Peak Timber Sale and Fuelbreak Project EIS |
- Recreation management |
In Progress: DEIS NOA in Federal Register 04/30/2010 Est. FEIS NOA in Federal Register 01/2011 |
Expected:01/2011 |
04/2011 |
Daniel Dill 707-574-6849 drdill@fs.fed.us |
| Description: Timber harvesting through commercial thinning on about 2,250 acres and fuelbreak construction of about 2540 acres along strategic roads.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30389 |
|||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T2S, R8E & T3S, R8E Humboldt B&M; T28N, R12W & T27N, R12W Mt. Diablo B&M. LRMP Management Areas: General Forest, Partial Retention Visual Quality Objective, Retention Visual Quality Objective, and Riparian Reserve. Non-key Watershed: Upper Mad River. | |||||
|
Mad River Modular Barracks Installation CE |
- Facility management | On Hold | N/A | N/A |
Richard Falk 707-574-6233 richardfalk@fs.fed.us |
| Description: Site preparation and installation of a modular barracks unit on the Mad River District residential compound.at an existing stockpile facility. | |||||
| Location: UNIT - Mad River Ranger District. STATE - California. COUNTY - Trinity. LEGAL - T1N, R7E, Sec. 17, Humboldt B&M. LRMP Management Area: General Forest. Non-key watershed: Van Duzen River. | |||||
| Back To Top | |||||
Six Rivers National Forest, Orleans Ranger District (excluding Projects occurring in more than one District) |
R5 - Pacific Southwest Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2011 Wildfire Reforestation CE CE *NEW LISTING* |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:03/2011 | 03/2011 |
Roberto Beltran 530-627-3334 rbeltran@fs.fed.us |
| Description: Aprox. 160 acres within the 2009 Mill Fire will be replanted and grubbed (4 ft. diameter) with mixed Douglas Fir and Ponderosa Pine at variable spacing resulting in between152 - 225 per acre. No site prep will occur. Subsequent Release may occur. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T10N R5E Sections 32,33,and 34 HBM. T10N R5E Sections 32,33,and 34 HBM. | |||||
|
Aikens Creek Campground Gate Reinstallation CE |
- Facility management | Cancelled | N/A | N/A |
Bob Hemus 530-627-3291 bhemus@fs.fed.us |
| Description: Reinstall an existing gate at Highway 96 entrance for resource protection. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T9N R4E Section 30, HBM. UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. Management Area - Late Succesional Reserve, VQ Retention, Riparian Reserve. Watershed - Aikens Creek. | |||||
|
Cedar Vegetation Management Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:05/2011 | 09/2011 |
Todd Salberg 530-627-3337 tsalberg@fs.fed.us |
| Description: Commercially thin natural stands and plantations and treat fuels on approximately 1700 acres. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T 11N, R5E, Secs. 21-22, 26-28, 33-36 and T10N, R5E, Secs. 2-4, 8-10, and 16-17, HBM. UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. Management Area - General Forest, Matrix and Late Successional Reserve. Watershed - Lower Middle Klamath. | |||||
|
Orleans Barracks Replacement Project CE |
- Facility management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:12/2011 | 06/2012 |
Thomas Annand 530-627-3291x 3255 tannand@fs.fed.us |
| Description: Replaces an older barracks facility on the Orleans statiion with a new one. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - LEGAL - T11N R6E Sec 31 HBM. UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. Management Area - General Forest, Watershed - Middle Klamath. | |||||
|
PG&E 12kv Powerline Realignment CE |
- Special use management | On Hold | N/A | N/A |
George Frey (707) 441-3631 gfrey@fs.fed.us |
| Description: Realignment of 4 miles of PG&E powerline along Hwy 96 | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - Sec . 2, 9, 10, 11, 16, 17, 18, 19, 30 & 31 T10N, R5E, HM. Allocation - VQO Partial Retention, Watershed - Middle Klamath. UNIT - Orlean RD, STATE - California, COUNTY - Humboldt. | |||||
|
Ridgetop RAWS Installation CE |
- Facility management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:11/2010 | 12/2010 |
Thomas Annand 530-627-3291x 3255 tannand@fs.fed.us |
| Description: Install remote automated weather station (RAWS) near the junction of forest roads 12N12 and 11N05. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T11N R4E Sec. 13. HBM. UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. Management Area - Late Successional Reserve. Watershed - Slate Creek. | |||||
|
Seasonal Gate Closure to Prevent Spread of Port-Orford Cedar Root Disease CE *NEW LISTING* |
- Vegetation management (other than forest products) - Road management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:01/2011 | 02/2011 |
LeRoy Cyr 530-627-3291 lcyr@fs.fed.us |
| Description: Project proposes to seasonally close existing gates to prevent the spread of the lethal root disease,. Infected site is southwest of Louse Camp, on the Orleans Ranger District, Humboldt County. Gates are located at FS Route 12N13 and FS Route 12N10 | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Humboldt. LEGAL - T12N R4E Sec 33, Humboldt Meridian. Orleans/Ukonom Ranger District, Bluff Creek Watershed, Humboldt County. Gate locations: FS Route 12N13 & FS Route12N10 a. | |||||
|
Siskiyou Telephone Line Extention CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 02/2011 |
Thomas Annand 530.627.3333 rcoragliotti@fs.fed.us |
| Description: Amend existing special use permit to extend cable from existing box approximately 650 feet southwest along existing road toward the Salmon River. This will provide phone service to a new home built on Indian Allotment Land. | |||||
| Location: UNIT - Orleans Ranger District. STATE - California. COUNTY - Siskiyou. LEGAL - T11N R6E Section2. The proposed project is located along the existing access road off of the Salmon River Road near the Forest Service Compound at Oak Bottom. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||