Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R4 - Intermountain Region, Caribou-Targhee National Forest, Occurring in more than one District (excluding Forestwide) - R4 - Intermountain Region, Caribou-Targhee National Forest, Ashton/Island Park (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Caribou-Targhee National Forest, Montpelier Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Caribou-Targhee National Forest, Palisades Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Caribou-Targhee National Forest, Soda Springs Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Caribou-Targhee National Forest, Teton Basin Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Caribou-Targhee National Forest, Westside Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 12/18/2009 Est. DEIS NOA in Federal Register 12/2010 |
Expected:11/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 01/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Expansion of Broadband Access to Under-Served Users EA |
- Special use management |
In Progress: 215 Comment Period Legal Notice 11/26/2010 |
Expected:01/2011 |
04/2011 |
Deidre Witsen 307-739-5434 dwitsen@fs.fed.us |
| Description: Burial of approximately 35 miles of two 1.25inch conduits containing fiber optic broadband cable via plowing technique. Route will primarily be within existing road right-of-ways and utility right-of-ways.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33847 |
|||||
| Location: UNIT - Jackson Ranger District, Teton Basin Ranger District, Wind River Ranger District, Buffalo Ranger District. STATE - Wyoming. COUNTY - Teton, Fremont. Teton Pass via Old Pass Road, BPA ROW roads, & within Highway 22 ROW; Within Highway 26/287 ROW from Moran to Wind River Lake, FS Roads 30060 & 30040. | |||||
|
Gateway West 230/500 kv Transmission Line Project EIS |
- Special use management |
In Progress: NOI in Federal Register 05/16/2008 Est. DEIS NOA in Federal Register 12/2010 |
Expected:09/2012 |
11/2012 |
Misty Hays 307-358-4690 mahays@fs.fed.us |
| Description: Idaho Power and Rocky Mountain Power propose to construct electric transmission lines from the proposed Windstar Substation near the Dave Johnston Power Plant at Glenrock, WY to the proposed Hemingway substation near Melba, Idaho
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25265 |
|||||
| Location: UNIT - Douglas and Thunder Basin Ranger District, Montpelier Ranger District. STATE - Idaho, Wyoming. COUNTY - Bear Lake, Albany, Converse, Natrona. Montpelier District, CTNF - northern most corridor designated in the Caribou NF Plan, Doulgas Distict MBRNF northern most corridor designated in the MBR Plan. | |||||
|
Mountain States Transmission Intertie EIS |
- Special use management | On Hold | N/A | N/A |
Patty Bates 406-329-3979 pbates@fs.fed.us |
| Description: Issue easement to Northwestern Energy to construct and maintain a 500 KV electricity transmission line on National Forest System lands in Montana and Idaho. BLM is lead agency and Forest Service is cooperating agency. | |||||
| Location: UNIT - Butte Ranger District, Jefferson Ranger District, Pintler Ranger District, Dubois Ranger District, Dillon Ranger District. STATE - Idaho, Montana. COUNTY - Clark, Beaverhead, Deer Lodge, Jefferson, Silver Bow. Various locations depending upon the alternative route locations. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Occurring in more than one District (excluding Forestwide) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Proposed Targhee Revised Forest Plan Amendment EIS |
- Land management planning |
In Progress: NOI in Federal Register 10/29/2010 Est. DEIS NOA in Federal Register 02/2011 |
Expected:04/2011 |
05/2011 |
Megan Bogle 208-354-6613 mbogle@fs.fed.us |
| Description: Proposes to amend the 1997 Revised Forest Plan for the Targhee portion of the Forest to address direction for "old-growth" and "late-seral" forested vegetation, snags and wildlife habitat for select cavity-nesting species.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25461 |
|||||
| Location: UNIT - Palisades Ranger District, Teton Basin Ranger District, Dubois Ranger District, Ashton/Island Park. STATE - Idaho, Wyoming. COUNTY - Bonneville, Butte, Clark, Fremont, Jefferson, Lemhi, Madison, Teton, Teton, Lincoln. Targhee portion of the Caribou-Targhee National Forest. | |||||
|
Wells Canyon, Stewart Canyon and Green Mountain Sheep Grazing Reauthorization EA |
- Grazing management |
In Progress: Scoping Start 10/22/2010 Est. 215 Comment Period Legal Notice 02/2011 |
Expected:03/2011 |
06/2011 |
Vic Bradfield 208-547-4356 vbradfield@fs.fed.us |
| Description: Re-authorize sheep grazing on the Wells Canyon, Stewart Canyon, and Green Mountain sheep allotments
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33647 |
|||||
| Location: UNIT - Montpelier Ranger District, Soda Springs Ranger District. STATE - Idaho. COUNTY - Caribou. LEGAL - Townships 9 and 10 South, Ranges 44 and 45 East. 15,500 acres along the east side of the Caribou National Forest, within the Montpelier and Soda Springs Ranger Districts. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Ashton/Island Park (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bear Gulch Road Closure (Forest Road 159) EA |
- Wildlife, Fish, Rare plants - Road management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:05/2011 | 07/2011 |
Lee Mabey 208-557-5784 lmabey@fs.fed.us |
| Description: Close the .5 mile segment of Bear Gulch Road159 and create a trail. The road is in the bottom of the drainage and cannot be maintainted to a usable standard. Closure is proposed to protect resource values.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30806 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - T. 10 N. R 44 E. Sec 31, 32. Road is located at the site of the old Bear Gulch Ski Hill off of the Mesa Falls Scenic Byway, Northeast of Ashton, ID. | |||||
|
Green Canyon Road Fuelbreak CE |
- Fuels management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:08/2011 | 09/2011 |
Robert Albano 208-558-7301 ralbano@fs.fed.us |
| Description: Masticate dead and down fuels and remove ladder fuels along the south side of the Green Canyon Road (FS Road # 167) for approx. 4 miles. The area would be 200 feet from the borrow pit.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33914 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - T.12N., R.42E., Sections 32-35. South side of the Green Canyon Road (FS Road #167) from the junction of Hwy 20 to approx. 4 miles west. Cutting would occur 200 feet from the borrow pit. | |||||
|
Macks Inn Sewer Expansion EA |
- Special use management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:05/2011 | 07/2011 |
Bill Davis 208-652-1228 bdavis@fs.fed.us |
| Description: Fremont County is seeking to expand the Macks Inn Sewer Treatment Facility by increasing the irrigation field (not the leach field) by approximately 50 acres to handle increased needs in the North Island Park area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34041 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - T.14N., R.44E., Section 30. The project is located south of the North Big Springs Road and southeast of Island Park Lodge. | |||||
|
North Antelope Powerline CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:05/2011 | 07/2011 |
Bill Davis 208-652-1228 bdavis@fs.fed.us |
| Description: Fall River Electric proposes to install approx. 13,000 ft of buried power cable to provide power to a cell phone tower that would be constructed on Idaho Departmet of Lands land.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34051 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - T.11N., R.42E., Sections 14 and 15. Project starts at Pinehaven and travels west along the North Antelope Flat Road to the State Dept. of Lands Section. | |||||
|
North Island Park WUII EA *NEW LISTING* |
- Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:05/2011 | 02/2012 |
Jim Cox 208-558-7301 jcox@fs.fed.us |
| Description: Proposes to reduce hazardous fuels adjacent to private property on approximately 950 acres. A fuel break would be created in three treatment units by thinning, hand-piling, commercial logging, firewood gathering and prescribed burning.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34413 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - Bighorn Hills Estates T.15N., R.44E., Secs 6 & 7; Bootjack T.15N., R.43E., Secs 28-30 & T.15N. R.42E. Sec 25; Meadow Cr. T.14N., R.44E., Secs 3, 4, 10, 15, 21, & 22; Moose Cr. T.13N., R.44E., Sec 4. North Island park area near Henry's Lake - Bighorn Hills Estate, Bootjack area, Meadow Creek area, and Moose Creek Summer Homes. | |||||
|
Wood Road 16 Watershed Restoration CE |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
In Progress: Scoping Start 05/27/2009 |
Expected:05/2011 |
07/2011 |
Lee Mabey 208-557-5784 lmabey@fs.fed.us |
| Description: Implement the 1997 Travel Plan by obliterating nonsystem roads and improving drainage on system roads in the vicinity of Wood Road 16, Forest Road 313. The purpose of the project is to reduce sediment into the Henry's Fork of the Snake River.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27939 |
|||||
| Location: UNIT - Ashton/Island Park. STATE - Idaho. COUNTY - Fremont. LEGAL - T. 11N., R. 42E. Sections 1 and 12, T. 11N., R. 43E. Sections 5 and 6. Site is the access road to the lowest reach of the Ranch or Harriman State Park across from Pine Haven. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Montpelier Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Cache Roads Hazardous Fuels Treatment EA |
- Vegetation management (other than forest products) - Fuels management - Road management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:10/2011 | 06/2012 |
Rebecca Phelps 208-847-0375 roophelps@fs.fed.us |
| Description: Treat 3900 acres of hazardous fuels 300 feet off of open forest roads. Smaller diameter conifer and dead and down fuels will be cut, piled and burned to reduce hazardous fuels.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32346 |
|||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Bear Lake, Caribou, Franklin. LEGAL - The project is located in T9S to T16S, R40E to R43E, and all sections. All open forest roads on the Cache Forest that is administered by the Caribou National Forest. | |||||
|
Elbow Hollow Prescribed Burn CE |
- Vegetation management (other than forest products) - Fuels management |
Cancelled | N/A | N/A |
Rebecca Phelps 208-847-0375 roophelps@fs.fed.us |
| Description: Use prescribed fire to treat a 5,000 acre landscape dominated by a mountain big sagebrush community type. Approximately 650 ac. of sagebrush, 300 ac. of aspen and 400 ac. of mountain brush sites would be targeted to be burned in a mosaic pattern. | |||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Bear Lake. LEGAL - Township 12S, Range 45E, Sections 32, 33, 34, and 35 and T13S, Range 45E, Sections 1, 2, 3, 4, 5, 10, 11, and 12 in Bear Lake County, Idaho. The project area is located between Highway 89 and Banks Valley, approximately five miles east of Montpelier, Idaho. | |||||
|
Ephraim Valley Aspen Treatment CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 05/31/2007 |
Expected:05/2011 Actual: 11/21/2008 |
07/2011 |
Devon Green 208-259-3361 dhgreen@fs.fed.us |
| Description: Use prescribed fire to restore aspen, by killing invading conifer on approximately 500 acres, and increase shrub diversity on approximately 150 acres to improve wildlife habitat in an 800 acre project area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=18640 |
|||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Caribou. LEGAL - T10S, R46E, Sec 29-32. Boise Meridian. Ridge between Ephraim Valley and Elk Valley within the Gannett Hills between Crow Creek and the Wyoming State line. | |||||
|
Main Canyon Vegetation Management Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 06/2011 |
Expected:02/2012 | 06/2012 |
Jane Rushane 208-847-0375 jrushane@fs.fed.us |
| Description: Use prescribed fire and timber harvest to change species composition and structure on 3600 acres in several different vegetation cover types in the Main Canyon area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27028 |
|||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Franklin. LEGAL - Township 12 S, Range 41 E Sections 1, 2, 3, 10-15, 22 and 28. Approximately 13 mile south of Grace, Idaho. Access is via Forest roads 440 and 442. | |||||
|
Strawberry Aspen Treatment CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 10/23/2009 |
Expected:05/2011 |
09/2011 |
Jared Mattson 208-847-8946 jaredmattson@fs.fed.us |
| Description: Use prescribed fire and mechanical thinning to reduce conifer encroachment in aspen forest (1400 acres), to improving wildlife habitat and reducing fuel loading in the 2600 acre project area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27026 |
|||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Franklin. LEGAL - T12S, R42E, Sec 30-31, T12S,R41E, Sec 36, T13S, R42E, Sec 6 and T13S, R41E, Sec 1,6,7,12 Boise Meridian. Southwest of Montpelier, ID on Hwy. 30 in Emigration Canyon. | |||||
|
Telegraph Hollow WUI EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 06/21/2010 Est. 215 Comment Period Legal Notice 05/2011 |
Expected:10/2011 |
06/2012 |
Rebecca Phelps 208-847-0375 roophelps@fs.fed.us |
| Description: Reduce understory tree and brush densisites to change stand age, composition and structure to mimic historic fire regimes and improve wildlife habitat. Masticator would be used and slash piled/burned. No commercial harvest or road construction.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30071 |
|||||
| Location: UNIT - Montpelier Ranger District. STATE - Idaho. COUNTY - Bear Lake. LEGAL - Township 14S Range 42E Sections 13,24. 15 miles Southwest of Montpelier, Idaho in Bloomington Canyon. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Palisades Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Caribou Subsection Summer Travel Plan Revision EA |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 08/23/2008 |
Expected:01/2011 |
07/2011 |
Ron Dickemore 208-523-1412 rdickemore@fs.fed.us |
| Description: Develop a clear plan for mix of trails designed and managed specifically for ATVs, motorcycles, mountain bikes and non-motorized uses. Create a trail network that is safe, environmentally sound, affordable to maintain and responsive to public need.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=23264 |
|||||
| Location: UNIT - Palisades Ranger District. STATE - Idaho, Wyoming. COUNTY - Bonneville, Lincoln. The Caribou subsection is located south and west of Swan Valley, Idaho. | |||||
|
Hoffman Area Mountain Pine Beetle Infested Tree Removal Project CE *NEW LISTING* |
- Recreation management - Fuels management - Facility management |
In Progress: Scoping Start 12/27/2010 |
Expected:02/2011 |
02/2011 |
Randy Griffith 208-542-5812 rsgriffith@fs.fed.us |
| Description: Remove lodgepole pine trees infested with Mountain Pine Beetles in the area around Hoffman Summer Home and McCoy Creek Campgrounds, which are dead, dying, and hazard trees.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34861 |
|||||
| Location: UNIT - Palisades Ranger District. STATE - Idaho. COUNTY - Bonneville. LEGAL - T3S, R46E, Sec.5, and 8. The area surrounding of the Hoffman Summer Home and McCoy Creek Campgrounds, near the Southwest shore of Palisades Reservoir. | |||||
|
Lower Valley Power and Light Special Use Permit Re-issuance CE |
- Special use management | On Hold | N/A | N/A |
Ron Dickemore 208-523-1412 rdickemore@fs.fed.us |
| Description: Lower Valley Power & Light Co. has several special use permits for overhead and buried transmission and distribution lines. Some permits have expired or are nearing expiration. Project proposes combining permits, an administrative action.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27472 |
|||||
| Location: UNIT - Palisades Ranger District. STATE - Idaho, Wyoming. COUNTY - Bonneville, Lincoln. Within existing utility corridors on the southern portion of the Palisades Ranger District, near Palisades Reservoir. | |||||
|
Old Ranger Trail (FS #287) CE |
- Recreation management |
In Progress: Scoping Start 03/06/2010 |
Expected:04/2011 |
09/2011 |
Ron Dickemore 208-523-1412 rdickemore@fs.fed.us |
| Description: Reconstruct approximately 6.96 miles of the old trail. Rerouting three sections of trail to reduce existing and future erosion problems. The trail is managed for single-track motorized use.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32455 |
|||||
| Location: UNIT - Palisades Ranger District. STATE - Idaho. COUNTY - Bonneville, Madison. LEGAL - Sections 2, 3, 4, 5, 11, 12, and 13, T3N, R42E. Big Hole Mtns., parallels the River Road (FS 206), beginning in the Wolverine Creek drainage crossing down to the Burns Creek drainage, crossing Burns Creek and ending at the mouth of Blacks Canyon. | |||||
|
Upper Palisades Creek Trail Rehab CE |
- Recreation management | On Hold | N/A | N/A |
David Woodcock 208-523-1412 dwoodcock@fs.fed.us |
| Description: Relocate approximately 0.5 mile of the trail out of the riparian bottoms onto the adjacent hill side. Beaver dams often cause this section of trail to become submerged and impassible. All work will be done using hand crews.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27927 |
|||||
| Location: UNIT - Palisades Ranger District. STATE - Idaho. COUNTY - Bonneville. LEGAL - Section 3, T1N, R45E. Upper Palisades Creek Drainage, Snake River Range. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Soda Springs Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Dairy Syncline Mine Project Meterological Tower Installation CE |
- Minerals and Geology | Completed | Actual: 09/29/2010 | 10/2010 |
Jack Isaacs 208-547-4356 jisaacs@fs.fed.us |
| Description: Construction and installation of a meteorological tower to gather and collect air quality and meteorological monitoring data. The project encompasses 1.8 acres on National Forest lands
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33809 |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Caribou. LEGAL - T9S R44E, Section 26. Approximately 12 miles southeast of Soda Springs, Idaho. | |||||
|
Dairy Syncline Phosphate Mine EIS |
- Minerals and Geology |
In Progress: NOI in Federal Register 04/13/2010 Est. DEIS NOA in Federal Register 01/2012 |
Expected:10/2013 |
09/2014 |
Jack Isaacs 208-547-4356 jisaacs@fs.fed.us |
| Description: Analyze a proposed new phosphate mine plan and associated projects and infrastructure on existing lease I-28115 and I-0258, encompassing approximately 1,500 acres on lease and approximately 400 acres off lease. Considers land exchange proposal.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27958 |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Bear Lake, Caribou. LEGAL - Portions of T9S, R44E Sections 6, 7, 16-21, 28, 29, 32, 33. East flank of the Aspen Range, approximately 12 miles east of Soda Springs, Idaho. | |||||
|
Hooper Springs Transmission Line EIS |
- Special use management |
In Progress: NOI in Federal Register 07/08/2010 Est. DEIS NOA in Federal Register 04/2012 |
Expected:10/2012 |
06/2013 |
Glenn Lackey 208-677-8303 glackey@fs.fed.us |
| Description: Build a new 20 mile double circuit 115-KV powerline from Soda Springs to the existing powerline in Lanes Creek. The new line will cross about 2 miles of the Forest. Alternate route that avoids all National Forest System lands is being considered.
Web Link: http://www.efw.bpa.gov/environmental_services/Document_Library/HooperSprings/ |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Caribou. LEGAL - T 7 S, R 44 E, Sections 19-22, 26-29. Across the Forest, just south of the Blackfoot River. | |||||
|
Jackknife Trail and Stream Enhancement EA |
- Recreation management - Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 02/22/2010 Est. 215 Comment Period Legal Notice 01/2011 |
Expected:03/2011 |
06/2011 |
Corey Lyman 208-557-5838 clyman@fs.fed.us |
| Description: Re-locate Trail #448 (nonmotorized) to replace the section of Road #136 closed due to landslide. Replace road bridge with a longer span trail bridge, rehabiliate the stream channel and restore riparian function and critical fisheries habitat.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31216 |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Bonneville. LEGAL - R 45 E; T 4 S; Section 25. Approx. 6 miles northwest of Freedom, WY. Bridge is approx. 2 miless west of the Forest Boundary. | |||||
|
Tincup Mountain Aspen Restoration CE |
- Fuels management |
In Progress: 215 Comment Period Legal Notice 03/21/2008 |
Expected:10/2011 |
09/2012 |
Rebecca Phelps 208-547-1118 roophelps@fs.fed.us |
| Description: Treat a total of 3,000 acres of aspen and sub-alpine with prescribed fire to promote aspen regeneration. Some mechanical treatments may be used to construct fire lines.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=23217 |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Caribou. LEGAL - Township 5S Range 44 and 45 E Sections 1, 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18. 35 miles North East of Soda Springs; North of Highway 34. | |||||
|
Winschell Dugway ATV Trail System EA |
- Recreation management - Heritage resource management - Watershed management |
In Progress: 215 Comment Period Legal Notice 11/09/2008 |
Expected:03/2011 |
09/2011 |
Glenn Lackey 208-547-4356 glackey@fs.fed.us |
| Description: Construct and reconstruct 7.8 miles of ATV trail from Caribou City to Morgan Meadows. New construction will connect the historic Dugway with abandoned mining road down the Bilk Creek drainage and into Caribou City. Install 2 bridges across Bilk Ck.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=20098 |
|||||
| Location: UNIT - Soda Springs Ranger District. STATE - Idaho. COUNTY - Bonneville. LEGAL - Range 44 East, Township 4 South sections 2,3,7,9,10,15,18 and 22. South, East and North aspects of Caribou Mountain on the Soda Springs Ranger District, Caribou-Targhee National Forest. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Teton Basin Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Darby Canyon Trailhead Relocation EA |
- Recreation management - Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 06/2011 |
Lee Mabey 208-557-5784 lmabey@fs.fed.us |
| Description: Relocate trailhead .25 miles west to a location away from Darby Creek to protect water quality, fisheries and reduce trailhead congestion. Rehabilitate the road beyond new trailhead and convert to a nonmotorized trail. Replace main trail bridge.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30799 |
|||||
| Location: UNIT - Teton Basin Ranger District. STATE - Wyoming. COUNTY - Teton. LEGAL - T. 43 N. R 118 W. Sec 14. End of Forest Road 012, Darby Canyon, Southeast of Driggs, Idaho. | |||||
|
Kirkham Hollow Conifer Thinning and Aspen Enhancement Project CE *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:06/2011 | 08/2011 |
Dave Ovard 208-354-6616 dovard@fs.fed.us |
| Description: Thin conifer in 20 year old clear-cuts to 16 ft spacing, favoring aspen clumps. Stands with >300 aspen saplings per acre would be enhanced by removing all conifer. Stands without aspen would favor Douglas-fir, lodgepole pine, then subalpine-fir.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34868 |
|||||
| Location: UNIT - Teton Basin Ranger District. STATE - Idaho. COUNTY - Madison. LEGAL - T5N, R43E, Sections 30 and 31. West of Driggs, ID on Forest Road 816, a closed road originating on FR 328 (Kirkham Hollow) which is accessed via State Highway 33. | |||||
|
North Teton Trail Reconstruction Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2011 | 07/2011 |
Chad Grossenburg 208-354-6612 cgrossenburg@fs.fed.us |
| Description: Reconstruct less than one-half mile of former trail. Returning the trail tread to it's previous location will eliminate two creek crossings. The abandoned trail section and crossings will be rehabilitated.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34859 |
|||||
| Location: UNIT - Teton Basin Ranger District. STATE - Wyoming. COUNTY - Teton. LEGAL - T 44 N; R 117 W; Sections 16 & 21. West of Driggs, Idaho. Two miles up the North Teton Trail (#024) in the Jedediah Smith Wilderness. | |||||
|
Teton Front Travel Plan Amendment EA |
- Recreation management |
In Progress: Scoping Start 04/09/2010 Est. 215 Comment Period Legal Notice 01/2011 |
Expected:02/2011 |
05/2011 |
Dave Ovard 208-354-2312 dovard@fs.fed.us |
| Description: Change the 3.2(b) management prescription areas to 3.2(d) to eleminate cross-country motorized travel. This decision would implement the intent of the 11/09/05 Travel Management Rule, amend the 1997 Revised Forest Plan and amend the 1999 Travel Plan
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30069 |
|||||
| Location: UNIT - Teton Basin Ranger District. STATE - Wyoming. COUNTY - Teton. Western slope of the Teton Range, includes several areas outside of the Widlerenss from Moose Creek north to Dry Ridge. | |||||
|
Upper Horseshoe Creek Aspen Protection CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:06/2011 | 08/2011 |
Dave Ovard 208-354-6616 dovard@fs.fed.us |
| Description: Remove seral conifer from healthy aspen clumps to assure the persistence of the aspen for the next 50 to 100 years. The confier less than 5 inches in diameter would be cut while the larger confier would be ringed, or girdled, to kill th tree.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34867 |
|||||
| Location: UNIT - Teton Basin Ranger District. STATE - Idaho. COUNTY - Teton. LEGAL - T5N, R44E, Section 29; T5N, R43E, Section 24. Approximately 11 miles west of Driggs, Idaho; within 500 feet of Forest Road 235, on the upper two miles of Horseshoe Creek. | |||||
| Back To Top | |||||
Caribou-Targhee National Forest, Westside Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Curlew Sagebrush Protection & Restoration Project EA |
- Wildlife, Fish, Rare plants - Fuels management |
In Progress: Scoping Start 11/05/2010 Est. 215 Comment Period Legal Notice 02/2011 |
Expected:05/2011 |
06/2011 |
Mathew Fitch 208-236-7508 mfitch@fs.fed.us |
| Description: Create strategic fuel breaks to protect mature/developing sagebrush/grass communities from wildfire by mowing and/or masticating roadside and fence line vegetation to reduce fuel loads and protect sage grouse habitat.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32438 |
|||||
| Location: UNIT - Westside Ranger District. STATE - Idaho. COUNTY - Oneida. LEGAL - Portions of T13-16 and R31-33. The Curlew National Grassland is approximately 20 miles west of Malad, ID and surrounds the community of Holbrook, ID Hwy 37 and the Arbon Valley Highway. | |||||
|
Cusick Creek-Gibson Jack Connector Non-Motorized Trail EA |
- Recreation management |
In Progress: Scoping Start 06/10/2010 Est. 215 Comment Period Legal Notice 01/2011 |
Expected:03/2011 |
06/2011 |
Debrah Tiller 208-557-5779 dtiller@fs.fed.us |
| Description: Build 4 miles of new non-motorized single-track trail to connect the City Creek non-motorized trail system to the Gibson Jack non-motorized trail. Project includes expanding Gibson-Jack Trailhead parking lot.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32447 |
|||||
| Location: UNIT - Westside Ranger District. STATE - Idaho. COUNTY - Bannock. LEGAL - T. 7 S., R 34 E, Sections 14,15, 22,23, 26. Both drainages are located just west of the City of Pocatello. . | |||||
|
Pocatello, Michaud, and Midnight Cattle Grazing Reauthorization EA |
- Grazing management |
In Progress: Scoping Start 12/01/2010 Est. 215 Comment Period Legal Notice 01/2011 |
Expected:06/2011 |
09/2011 |
Hans Bastian 208-236-7526 hbastian@fs.fed.us |
| Description: Reauthorize grazing on the Pocatello, Michaud, and Midnight Cattle allotments.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33644 |
|||||
| Location: UNIT - Westside Ranger District. STATE - Idaho. COUNTY - Bannock, Power. LEGAL - Portions of T7S, R34E; T8S, R34E; T9S, R34E; T8S, R35E; T9S, R35E. These allotments are in the Lower Portneuf watershed south and west of Pocatello. | |||||
|
South Mink Prescribed Fire CE |
- Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 01/02/2008 |
Expected:04/2011 Actual: 01/07/2010 |
09/2011 |
Arik Jorgensen 208-236-7540 ajorgensen@fs.fed.us |
| Description: Use prescribed fire to reduce hazardous fuel accumulations, regenerate brush communities, increase the amount of young aspen and reduce conifer encroachment across the project area. No road construction or reconstruction will be necessary.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=23542 |
|||||
| Location: UNIT - Westside Ranger District. STATE - Idaho. COUNTY - Bannock. LEGAL - T9S, R35E, Sections 4, 5, 6, 7, 8, 9 and a portion of T9S, R34E, Section 1. 15 Miles South of Pocatello Idaho. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||