Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R4 - Intermountain Region, Sawtooth National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R4 - Intermountain Region, Sawtooth National Forest, Occurring in more than one District (excluding Forestwide) - R4 - Intermountain Region, Sawtooth National Forest, Fairfield Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Sawtooth National Forest, Ketchum Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Sawtooth National Forest, Minidoka Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Sawtooth National Forest, Sawtooth National Recreation Area (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 12/18/2009 Est. DEIS NOA in Federal Register 12/2010 |
Expected:11/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 01/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
Sawtooth National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Wildlife Conservation Strategy (Forest Plan Amendment) EA |
- Land management planning - Wildlife, Fish, Rare plants |
In Progress: Scoping Start 09/14/2007 Est. 215 Comment Period Legal Notice 10/2010 |
Expected:02/2011 |
04/2011 |
Bobbi Filbert 208-727-5003 bfilbert@fs.fed.us |
| Description: Short- and long-term management strategies and priorities for maintaining and restoring habitats associated with terrestrial wildlife species. | |||||
| Location: UNIT - Sawtooth National Forest All Units. STATE - Idaho, Utah. COUNTY - Blaine, Boise, Camas, Cassia, Custer, Elmore, Twin Falls, Box Elder. Sawtooth National Forest. | |||||
| Back To Top | |||||
Sawtooth National Forest, Occurring in more than one District (excluding Forestwide) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Little Smoky Placer Dredge Reclamation and Warm Springs Creek Channel Relocation EA |
- Watershed management | On Hold | N/A | N/A |
Dan Kenney 208-764-3472 dkenney@fs.fed.us |
| Description: Restore placer mine site in Little Smoky between the Ditto Flat crossing and Sawmill Creek to a more natural condition. Restore two sites in Warm Springs Creek where the stream channel has been modified. | |||||
| Location: UNIT - Fairfield Ranger District, Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine, Camas. LEGAL - T2N R15E Sections 4, 5 and 8 and T4N R16E Sections 20 and 21,Boise Meridian. Little Smoky Creek between the Ditto Flat crossing and Sawmill Creek; Bassett Gulch and old CCC camp in Warm Springs. | |||||
|
Prospectus for shuttle service to recreation sites - Ketchum District & Sawtooth Nat'l. Rec. Area CE |
- Special use management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:05/2011 | 06/2011 |
Joe Miczulski 208-622-0087 jmiczulski@fs.fed.us |
| Description: Issue a permit to a qualified operator for shuttle service to recreation sites on the Ketchum Ranger District and Sawtooth Nat'l Recreation Area. Operator will be selected based on the responses to the Prospectus criteria. | |||||
| Location: UNIT - Sawtooth National Recreation Area, Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. District wide. | |||||
|
Seismic Research - University of Florida CE |
- Research |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:04/2011 | 05/2011 |
Jackie Richter 208-737-3247 jsrichter@fs.fed.us |
| Description: Burial of passive seismic instrument with an above ground solar panel and data station box at three locations on the forest to collect data for NSF funded Earthscope project. | |||||
| Location: UNIT - Sawtooth National Recreation Area, Fairfield Ranger District, Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine, Camas. LEGAL - Gladiator Creek Rd. T6N, R15 E, Sec. 3; Warm Springs Rd. T3N, R15E, Sec. 11; Jumbo Creek T3N, 12 E, Sec. 8. Sawtooth NRA - Gladiator Creek Rd.; Ketchum RD - Warm Springs Rd.; Fairfield RD - Jumbo Creek. | |||||
| Back To Top | |||||
Sawtooth National Forest, Fairfield Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Cannonball-Liberal ATV Trail CE |
- Recreation management |
In Progress: Scoping Start 12/02/2010 |
Expected:03/2011 |
07/2011 |
Ann Frost 208-764-3216 afrost@fs.fed.us |
| Description: Construct approximately two miles of ATV Trail and re-open an old road of approximately three miles to connect the Cannonball and Liberal Creek Trails. | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T2N R15 E Sections 19, 20 and 29, Boise Meridian. Cannonball/Liberal Creek. | |||||
|
Chimney Creek Road and Trail Easements CE |
- Recreation management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:04/2011 | 06/2011 |
Ann Frost 208-764-3478 afrost@fs.fed.us |
| Description: Establish road and trail easements and access points across Idaho Department of Lands and BLM managed lands in the Chinmey Creek and South Fork Lime Creek areas. | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T1 and 2 N, Range 12E, Boise Meridian. Chimney Creek and South Fork Lime Creek. | |||||
|
Faulkner Group 3 Allotment Complex Allotment Managment Plan EA *NEW LISTING* |
- Grazing management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:05/2011 | 06/2011 |
John Shelly 208-764-3474 jshelly@fs.fed.us |
| Description: Proposal to authorize continued sheep grazing in the Lick Creek, Bluff Creek, Big Peak and Liberal Allotments. | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T 3,4 and 5 N; R 13, 14 and 15 East, Boise Meridian. Lick Creek, Bluff Creek, Big Peak Creek and Liberal Creek; 15 to 33 miles north and east of Fairfield, Idaho. | |||||
|
Liberal-Willow HFRA Project EA |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 03/22/2010 Est. Objection Period Legal Notice 03/2011 |
Expected:04/2011 |
06/2011 |
Anthony Davis 208-764-3462 apdavis@fs.fed.us |
| Description: Vegetative treatments in the Liberal and Willow Creek Areas. 22,600 acres of treatment are proposed to be carried out over ten years under HFRA authority addressing insect and disease outbreaks | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T 2-3 N. R 14-16 East, Boise Meridian. Liberal and Willow Creek drainages. | |||||
|
Little Water Trail Reroute CE |
- Recreation management |
In Progress: Scoping Start 12/02/2010 |
Expected:02/2011 |
06/2011 |
Jennifer Hulme 208-764-3471 jhulme@fs.fed.us |
| Description: Reroute the Little Water Trail #7020 to a more sustainable grade and location | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T3N, R12 E, Sections 5 and 6, B.M. Little Water Trail #7020, South Fork Boise River drainage. | |||||
|
Raymond Mine Plan of Operations EA *NEW LISTING* |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 11/22/2010 |
Expected:04/2011 |
06/2011 |
Heidie Torrealday 208-677-8310 htorrealday@fs.fed.us |
| Description: Proposed expansion and operation of the Raymond Mine located at the head of Emma Creek. | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T5N R14E, Sections 6 and 7, Boise Meridian. Head of Emma Creek, South Fork Boise River drainage. | |||||
|
Soldier Front Trail Reroute CE |
- Recreation management |
In Progress: Scoping Start 12/02/2010 |
Expected:03/2011 |
06/2011 |
Ann Frost 208-764-3478 afrost@fs.fed.us |
| Description: Reroute and establish an ATV trail across the Soldier Mountain Front from Free Gold trail to Chimney Creek. Establishment of a trailhead at Free Gold Trail with signing, parking and restroom will be analyzed separately. | |||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T2N, R 12-14 E, B.M. Free Gold Creek and the Soldier Mountain Front. | |||||
|
Winter Travel Plan Revisions - Fairfield Ranger District EA |
- Recreation management |
In Progress: Scoping Start 02/19/2010 Est. 215 Comment Period Legal Notice 02/2011 |
Expected:05/2011 |
12/2011 |
Ann Frost 208-764-3478 afrost@fs.fed.us |
| Description: Evaluate the revision of access restrictions to the winter backcountry areas of the Upper South Fork Boise River.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31915 |
|||||
| Location: UNIT - Fairfield Ranger District. STATE - Idaho. COUNTY - Camas. LEGAL - T 2-6 N and R 12-154 E, Boise Meridian. Road Corridor from Couch Summit to Fleck Summit and the Upper South Fork Boise River area. | |||||
| Back To Top | |||||
Sawtooth National Forest, Ketchum Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bodie Lode Access CE |
- Land management planning |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:09/2011 | 09/2011 |
Kurt Nelson 208-622-5371 kjnelson@fs.fed.us |
| Description: Clear out existing road in order to access patented mining claims via off road vehicle. | |||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. LEGAL - Section 6, T.2N., R.17E. Bodie Claim, 1/4 mile West of Wolftone drainage,north side of Deer Creek road. | |||||
|
Bridge replacements in Greenhorn, Adams, Chocolate, & Oregon Gulches CE |
- Recreation management | Completed |
Actual: 07/15/2010 07/15/2010 |
06/2011 |
Dan Kenney 208-622-0094 dkenney@fs.fed.us |
| Description: Replacing bridges, and ford rehabilitation on trails in Greenhorn, Adams Gulch, Chocolate Gulch, and Oregon Gulch. Change the first 1.9 miles of Adams Gulch from road to trail designation. No change in alignment.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32071 |
|||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. LEGAL - (T4N, R17E,S15&16), (T4N, R17E, S2&3) (T5N, R17E, S.15) (T5N, R17E, S.10). Greenhorn gulch, OregonGulch, Chocolate gulch, adn Adams gulch,. | |||||
|
Bucks Camp Administrative Site Conveyance CE |
- Land ownership management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:08/2011 | 10/2011 |
Kurt Nelson 208-622-5371 kjnelson@fs.fed.us |
| Description: Proposal is to offer for sale a 40 acre parcel of land in the Hyndman creek drainage. Property was set aside as an administrative site in 1908. Site was used as administrative pasture, and grazing allotment. | |||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine, Camas. LEGAL - NW1/4 Sec. 20, T. 4N.; R. 19E. Located off Hyndman Creek road, a tributary to the East Fork of Wood River, Approx. 13 miles southeast of Ketchum, ID. | |||||
|
Ketchum Ditch Bill Easement CE |
- Land ownership management |
In Progress: Scoping Start 03/28/2005 |
Expected:09/2011 |
10/2011 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Pursuant to applications for irrigation and stockwatering easements for Eagle Creek Irrigation Company;analyze what operating and maintenance conditions should be required. | |||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. LEGAL - T5N R17E Sec 13. 6 mi N of Ketchum, between Hwy 75 and Neal Canyon on Eagle Creek. | |||||
|
McClusky Water transmission line CE |
- Special use management | Completed | Actual: 10/01/2010 | 10/2010 |
Mike OFarrell 208-622-0082 mofarrell@fs.fed.us |
| Description: Issue new permit for existing project without modifications. | |||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. LEGAL - Sec. 15, T.5N. R.17E. Lot 3 ,Graham tract. | |||||
|
Oregon Gulch water users transmission line CE |
- Special use management |
Developing Proposal Est. Scoping Start 03/2011 |
Expected:09/2011 | 10/2011 |
Kurt Nelson 208-622-5371 kjnelson@fs.fed.us |
| Description: Install Parshall Flume (device for measurement of flow of water in open channels) and an 8" pipeline to replace existing irrigation ditch.which delivers water from National Forest to private lands. | |||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine, Camas. LEGAL - SE1/4 Sec. 9, NW1/4 Sec. 10, T.5N.; R.17E. Oregon Gulch, approximately 10 miles North of Ketchum, Blaine Co. Idaho. | |||||
|
Trail Creek and Cove Creek Livestock Allotment Analysis EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 05/19/2010 |
Expected:02/2011 |
06/2011 |
Kurt Nelson 208-622-5371 kjnelson@fs.fed.us |
| Description: Analyzing whether and under what circumstances to authorize sheep grazing on the Trail Creek and Cove Creek Sheep and Goat allotments.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31103 |
|||||
| Location: UNIT - Ketchum Ranger District. STATE - Idaho. COUNTY - Blaine. LEGAL - T5N. R. 18E. ; T3N. R. 19E. Trail Cr. 3 miles North East of Ketchum Idaho; Cove Cr. 7 miles southwest of Ketchum. | |||||
| Back To Top | |||||
Sawtooth National Forest, Minidoka Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Beaver Dam Trough Relocation CE |
- Grazing management |
In Progress: Scoping Start 11/01/2008 |
Expected:01/2011 |
05/2011 |
Lucas Phillips 208-678-0430 ljphillips@fs.fed.us |
| Description: Relocate existing trough away from spring. Install new pipe and new trough | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Twin Falls. LEGAL - T15S R20E SEC 34. Cassia County. | |||||
|
ENXCO Temporary Meteorological Towers CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 09/20/2010 |
Expected:01/2011 |
05/2011 |
David Ashby 208-678-0430 dashby@fs.fed.us |
| Description: The Minidoka Ranger District is proposing to issue a special use permit to enXco, Evergreen Wind Power Partners, L.L.C. for the installation and operation of two temporary meteorological towers. | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia. LEGAL - T14S, R19E, Sec. 25 & T15S, R19E, Sec 15 Minidoka Ranger District, Cassia Division, Sawtooth National Forest. UNIT-Minidoka Ranger District. STATE-Idaho. COUNTY-Cassia. | |||||
|
Grape Creek C&H Allotment Management Plan Update EA *NEW LISTING* |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 03/17/2010 |
Expected:09/2011 |
10/2011 |
Gilbert Jackson 208-677-8296 grjackson@fs.fed.us |
| Description: Analyze continued livestock grazing use withing the Grape Creek Cattle & Horse Allotment | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia. LEGAL - Township 14 South, Range 24 East, Sections 22, 23, 24, 25, 26, 27. Sawtooth National Forest, Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia. | |||||
|
Howell Canyon Potable Water Station CE |
- Recreation management | Cancelled | N/A | N/A |
Scott Nannenga 208-678-0430 snannenga@fs.fed.us |
| Description: Replace 25 year old potable water systems with new well system near Thompson Flat campground | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia. LEGAL - R24E, T13S, Sec 2. Albion Division. | |||||
|
Mineral Gulch Exploration Project EA *NEW LISTING* |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 10/01/2010 |
Expected:04/2011 |
06/2011 |
Heidie Torrealday 208-737-3224 htorrealday@fs.fed.us |
| Description: The Minidoka Ranger District of the Sawtooth National Forest is proposing to approve a Plan of Operations submitted by Western Pacific Resources Corporation for exploration drilling on the Black Pine Division of the Sawtooth National Forest. | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia. LEGAL - Boise Meridian, T.15S, R29E, Sections 26, 33, 34 & 35. UNIT-Minidoka Ranger District, STATE-Idaho, COUNTY-Cassia. | |||||
|
Sublett Fuels Reduction/Vegetation Management Project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:06/2011 | 07/2011 |
Dena Santini 208-678-0430 dsantini@fs.fed.us |
| Description: Vegetation and Fuels management for the Sublett Division of the Minidoka Ranger District | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Cassia, Oneida, Power. LEGAL - The boundaries of the Sublett Division. Sublett Division, Minidoka Ranger District, Sawtooth National Forest. | |||||
|
Thoroughbred Springs Pre-Commercial Thinning Project CE *NEW LISTING* |
- Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:05/2011 | 08/2011 |
Karl Fuelling 208-678-0430 kfuelling@fs.fed.us |
| Description: Pre-Commercially thin Lodgepole Pine to increase growth on the residual stand. | |||||
| Location: UNIT - Minidoka Ranger District. STATE - Idaho. COUNTY - Twin Falls. LEGAL - Thoroughbred Springs T14S, R18E, Secs. 33 & 34 - T15S, R18E, Secs. 3 & 4. UNIT-Minidoka Ranger District, STATE-Idaho, COUNTY-Twin Falls. | |||||
| Back To Top | |||||
Sawtooth National Forest, Sawtooth National Recreation Area (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Baker Creek Recreation Residences - Outhouse Replacement and Relocation CE |
- Special use management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:01/2011 | 07/2011 |
Stacey Clark 208-727-5008 staceyclark@fs.fed.us |
| Description: Replacement and relocation of two outhouses inside the floodplain at recreation residences in the Baker Creek Tract, Lots A 5 and 6, to locations outside the floodplain. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Blaine. LEGAL - NW 1/4 NE 1/4 Sec. 9, T. 5 N., R. 16 E. Baker Creek Recreation Residence Tract, 15 miles north of Ketchum, ID, southwest of Highway 75 off Baker Creek Road, Forest System Road #70162. | |||||
|
Bein Private Road Special Use Permit CE |
- Special use management - Road management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:12/2011 | 01/2012 |
Stacey Clark 208-727-5008 staceyclark@fs.fed.us |
| Description: To provide year-round access across approximately 1400 feet existing non-system forest road acrossing national land to the Bien's private property. The road would be plowed during the winter months. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - B.M., T11N, R12E, NW1/4SE1/4 Sec. 14, portion of H.E.S 577, Lots 5 and 6. The project area is seven miles west of Stanley, ID off Highway 21 across from Park Creek Recreation Site. | |||||
|
Boulderview Recreation Residence - Septic Replacement and Relocation CE |
- Special use management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:01/2011 | 07/2011 |
Stacey Clark 208-727-5008 staceyclark@fs.fed.us |
| Description: Replacement and relocation of septic system at recreation residence in the Boulderview Tract, Lot 14, to a location away from residence and away from nearby stream. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Blaine. LEGAL - SW 1/4 NE 1/4 Sec. 6, T. 5 N., R. 16 E., B. M. Boulderview Recreation Residence Tract: 16 miles north of Ketchum, ID, southwest of Hwy 75 off Forest System Road #70172. | |||||
|
Cabin Creek Road Reallignment and Reconstruction EA |
- Wildlife, Fish, Rare plants - Road management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:05/2011 | 05/2012 |
Mark Moulton 208-727-5000 mmoulton@fs.fed.us |
| Description: Realign 1 mile of the existing southern end of Cabin Creek Road (FSR 207) to a more sustainable location, passing over Alturas Lake Cr via a bridge. The former route, including culvert crossings of Cabin Creek, and 0.4 miles would be rehabilitated. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Blaine. LEGAL - Sec. 17 & 20, T7N, R14E, B. M. Within the Alturas Lake complex, approximately three miles west of Sawtooth City, Idaho, off Hwy 75 and FSR 205. | |||||
|
Elkhorn Placer Tramway Special Use Permit Renewal CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2010 |
Expected:12/2011 | 05/2012 |
Stacey Clark 208-727-5008 staceyclark@fs.fed.us |
| Description: Issuance of a special use permit for the continued operation and maintenance of a tramway crossing the Salmon River that provides access to private land at Treon Creek. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T. 11 N., R. 15 E., Section 25, NE1/4. Access to tramway is from a pull out along Highway 75, just east of Peach Creek, approximately 25 miles east of Stanley, ID. | |||||
|
ID Trans. Dept. (ITD) Stanley Mtce. Site & Custer Co. Sheriff's Site Permit Reissuance & Expansion EA |
- Special area management |
In Progress: Scoping Start 05/14/2009 Est. 215 Comment Period Legal Notice 11/2010 |
Expected:12/2010 |
06/2011 |
David Fluetsch 208-727-5001 dfluetsch@fs.fed.us |
| Description: The project evaluates the reissuance of permits held by ITD for a 36-acre permit area and Custer Co.for a 0.4-ac. permit area. ITD has requested a new shed, storage bldg. and 4th housing site, and an expansion to the existing mtce. warehouse. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T. 10 N., R. 13 E., Section 6 NE, NW, B.M. . The project area is located approximately 2.5 miles west of Stanley, ID on the south side of Highway 21. | |||||
|
Iron Creek Road Realignment and Reconstruction EA |
- Watershed management - Road management |
In Progress: Scoping Start 07/02/2009 Est. 215 Comment Period Legal Notice 10/2010 |
Expected:11/2010 |
07/2011 |
Mark Moulton 208-727-5000 mmoulton@fs.fed.us |
| Description: Replace a culvert encumbrance to fish migration at the crossing of the Iron Creek Subdivision Road (FSR 692) with a new bridge at a more suitable location upstream. Approximately 1/4 mile of existing road would be realigned. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T. 10 N., R. 13 E., Section 7, NE, NE, B. M. The project is located approximately three miles west of Stanley, ID off Highway 21 and Forest System Road #619. | |||||
|
Redfish Lake Complex - Road and Bridge Reconstruction EA |
- Recreation management - Road management |
In Progress: 215 Comment Period Legal Notice 07/08/2010 |
Expected:01/2011 |
06/2011 |
Brenda Geesey 208-737-3304 bgeesey@fs.fed.us |
| Description: Remove two timber bridges over Redfish Creek and replace the bridges in their existing location or reroute the Redfish Lake Road (FR #70214) and create a new crossing; and reconstruct the sharp curve on the Redfish Lake Road.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25738 |
|||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T 10 N, R 13E, Sections 34, 35; T 9N, R13E, Sections 2, 3. Redfish Lake Road - #70214 (approx. 8 miles south of Stanley Idaho). | |||||
|
Road Obliteration within Sawtooth Wilderness Boundary CE |
- Recreation management - Special area management - Watershed management - Road management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:04/2011 | 07/2011 |
Liese Dean 208-774-3017 ldean@fs.fed.us |
| Description: Relocate upper trailhead for Hell Roaring Trail #097 outside of Wilderness boundary and obliterate 1 mile of Hell Roaring Road #315 connecting to foot and horse trailhead. Obliterate and restore ¼ mile of Mays Creek Road #037. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - Hell Roaring Road #097, T8N, R13E, S13; Mays Creek Road #037, T8N, 13E, S24. The proposed project is within and adjacent to the Sawtooth Wilderness boundary, off Highway 75, approximately 13 miles south of Stanley. | |||||
|
Robinson Bar Domestic Hot Water Lines Special Use Permit CE |
- Special use management |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:02/2012 | 05/2012 |
Stacey Clark 208-727-5008 staceyclark@fs.fed.us |
| Description: Issuance of a special permit for the continued operation and maintenance of two existing spring boxes and pipelines that transport water from two hot springs to private land at Robinson Bar. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - Project is approx. 13 miles east of Stanley, ID in the Warm Springs drainage, tributary to the Salmon River. T. 11 N., R. 15 E., Section 34. | |||||
|
Salmon River Electric Special Use Permit Issuance EA |
- Special use management |
In Progress: Scoping Start 03/11/2009 Est. 215 Comment Period Legal Notice 10/2010 |
Expected:11/2010 |
01/2011 |
David Fluetsch 208-727-5001 dfluetsch@fs.fed.us |
| Description: Verification of facilities, consolidation and issuance of special use permits for Salmon River Electric Coop powerlines and associated facilities within the Sawtooth NRA. Reauthorization of existing facilities.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=13316 |
|||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Blaine, Custer. LEGAL - Sawtooth NRA - wide. Sawtooth National Recreation Area in Blaine and Custer Counties in Idaho. | |||||
|
Salmon River Outfitter and Guide Permit Re-Issuance EA |
- Special use management |
In Progress: Scoping Start 01/19/2010 Est. 215 Comment Period Legal Notice 09/2010 |
Expected:10/2010 |
02/2011 |
Ed Cannady 208-727-5004 ecannady@fs.fed.us |
| Description: Re-issuance of six special use permits for commercial outfitted and guided floatboating and four special use permits for commercial outfitted and guided angling. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - About 30 miles of the upper main Salmon River from the Sawtooth Fish Hatchery to the eastern boundary of the Sawtooth NRA. The upper Main Salmon River is located in Central Idaho near the town of Stanley. | |||||
|
Seismic Research - Virginia Tech CE |
- Special use management - Research |
Developing Proposal Est. Scoping Start 01/2011 |
Expected:04/2011 | 05/2011 |
Jackie Richter 208-737-3247 jsrichter@fs.fed.us |
| Description: One explosive shot (of many across Idaho) in a borehole will be set off to shake the ground. Seismometers will record the event to better understand the growth and evolution and tectonics in Idaho and eastern Oregon. NSF funded Earthscope project. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - Lat. 44.256 Long 114.992 or T11N, R13E, Sec 30. The site is located in a borrow pit on Highway 21 off FSR 653. | |||||
|
Silver Rule Creek Road Decommissioning and Restoration CE |
- Special area management - Wildlife, Fish, Rare plants - Watershed management - Road management |
On Hold | N/A | N/A |
Heidie Torrealday 208-737-3224 htorrealday@fs.fed.us |
| Description: Proposal to remove and restore to a natural condition approximately 12 miles of unauthorized miner-created roads and road segments located within the Silver Rule Creek drainage in the Railroad Ridge Idaho Roadless Area. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - Sections 16, 17, 20, 21, and 28, T 10 N, R 16 E, B. M. Silver Rule Creek drainage within the Railroad Ridge Inventoried Roadless Area. | |||||
|
Stanley Lake Recreation Complex Reconstruction EA |
- Recreation management - Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management - Facility management - Road management |
In Progress: 215 Comment Period Legal Notice 10/01/2009 |
Expected:03/2011 |
07/2012 |
Steven Frost 208-727-5000 srfrost@fs.fed.us |
| Description: New construction/reconstruction of existing camping, day-use, boat launch, and trail facilities. Close and rehabilitate portions of Stanley Lake Inlet Campground and nearby dispersed campsites.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=21662 |
|||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T. 11 N., R. 12 E., Section 27, 28, 33 and 34. The project is located approximately eight miles west of Stanley, ID off Highway 21 and FSR 455. | |||||
|
Stanley Ranger Station Housing and Well Development EA |
- Facility management |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:02/2011 | 06/2011 |
Matt Phillips 208-727-5025 mmphillips@fs.fed.us |
| Description: Develop bunkhouses and water supply for Stanley Ranger Station seasonal employees. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T. 10N., R. 13E. Secs. 27, 28, B. M. Within the Stanley Ranger Station Administrative Site. | |||||
|
Warm Springs Meadow Cattle and Horse Allotment Management Plan Update EA |
- Grazing management | On Hold | N/A | N/A |
Dave Cottle (208) 774-3000 dcottle@fs.fed.us |
| Description: To consider continued grazing use within the Warm Springs Meadow Cattle and Horse Allotment in compliance with Sect.339, P.L.108-447 pertaining to grazing use authorization, and analyze and disclose the effects of ongoing grazing activities | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - T.9 N., R.14 E., Secs. 1-3, 10-15, 23-26, T.9 N., R.15 E., Secs. 2, 4-10, 14-23, 26-30, 34, 35, T.10 N., R14 E., Secs. 25, 34-36, T.10N., R.15 E., Secs. 31-33. The project is located approximately 6 miles SE of Stanley, ID and 3 miles of Obsidian. | |||||
|
Whitebark Pine Planting of Seedlings and Seeds CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:11/2011 | 05/2012 |
Robin Garwood 208-727-5014 rgarwood@fs.fed.us |
| Description: Proposal to plant whitebark pine seedlings and seeds on up to 1,500 acres of whitebark pine habitat (above 8,600 feet) in up to seven project areas over the next 10 years. | |||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Blaine, Custer. Sawtooth NRA above 8,600 feet elevation in the Valley Road Fire Area, Galena Summit, Railroad Ridge, Salmon Headwaters, Boundary Creek, Beaver Creek, and Little Beaver Creek. | |||||
|
Williams Creek C&H Allotment Management Plan Update EA |
- Grazing management | Completed | Actual: 09/30/2010 | 05/2011 |
Dave Cottle 208-774-3000 dcottle@fs.fed.us |
| Description: Analyze continued livestock grazing use within the Williams Creek Cattle & Horse Allotment; to disclose the effects of ongoing grazing activities.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32395 |
|||||
| Location: UNIT - Sawtooth National Recreation Area. STATE - Idaho. COUNTY - Custer. LEGAL - Huckleberry Unit - T.9 N., R.13 E., Secs. 25, 36; T.9 N., R.14 E., Secs. 30, 31; T.8 N., R.13 E., Sec. 1. Williams Unit - T.9 N., R.14 E., Secs. 15, 16, 21, 22, 27, 28, 29, 33; B.M. Approximately 10 miles south of Stanley, Idaho. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||