Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) - R4 - Intermountain Region, Payette National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R4 - Intermountain Region, Payette National Forest, Occurring in more than one District (excluding Forestwide) - R4 - Intermountain Region, Payette National Forest, Council Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, Krassel Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, McCall Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, New Meadows Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, Weiser Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 10/2012 |
Expected:10/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders | Completed | Actual: 03/23/2012 | 08/2012 |
Brenda Halter-Glenn 202-260-9400 bhalterglenn@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
| Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bighorn Sheep Helicopter Capture and Collar EA |
- Wildlife, Fish, Rare plants - Research and Development |
On Hold | N/A | N/A |
Sue Dixon 208-634-0796 sdixon@fs.fed.us |
| Description: Helicopter capture and collaring of bighorn sheep to facilitate monitoring of sheep movement. Activities would occur in the main Salmon River Corridor, Frank Church River of No Return Wilderness, and Gospel Hump Wilderness
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36611 |
|||||
| Location: UNIT - Salmon River Ranger District, Red River Ranger District, Payette National Forest All Units. STATE - Idaho. COUNTY - Idaho, Valley. LEGAL - T24N R8E. Main Salmon River Corridor, South Fork Salmon River. | |||||
| Back To Top | |||||
R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Virginia Tech Small Seismometer Line Project CE |
- Special area management - Research and Development |
Completed | Actual: 05/14/2012 | 08/2012 |
Elaine Alexander 208-373-4318 ealexander@fs.fed.us |
| Description: Placement of small seismometers every 100-500 meters along the sides of existing roads and trails. To be placed for 2 to 8 days in areas previously disturbed by rd construct. or within 18 in of travel surface. Holes will be 6" wide, 6" deep, 18" long
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35454 |
|||||
| Location: UNIT - Emmett Ranger District, Challis-Yankee Fork Ranger District, Sawtooth National Recreation Area, Cascade Ranger District, Weiser Ranger District, Lowman Ranger District, Lost River Ranger District. STATE - Idaho. COUNTY - Adams, Custer, Gem, Valley. LEGAL - General east-west transect line beginning sec. 23, T.14N., R.6W., to sec. 25, T.11N., R.16E. Boise NF - 90 miles; Payette NF - 11 miles; Sawtooth NF - 37 miles; Salmon-Challis NF - 21 miles of transect line. | |||||
| Back To Top | |||||
Payette National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Snowmobile Trail Grooming in Valley, Adams and Idaho Counties EA |
- Recreation management |
In Progress: Scoping Start 01/12/2012 Est. 215 Comment Period Legal Notice 08/2012 |
Expected:10/2012 |
11/2012 |
Jane Cropp 208-634-0757 jcropp@fs.fed.us |
| Description: Proposal to support and maintain the ongoing winter snowmobile trail-grooming program in cooperation with Valley County and the State of Idaho parks and Recreation Department.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37513 |
|||||
| Location: UNIT - Payette National Forest All Units. STATE - Idaho. COUNTY - Adams, Idaho, Valley. LEGAL - Council, New Meadows, McCall Ranger Districts. Valley, Adams, and Idaho County. | |||||
|
Wildlife Conservation Strategy (Forest Plan Amendment) [101] EIS |
- Land management planning - Wildlife, Fish, Rare plants |
On Hold | N/A | N/A |
Patricia Anderson Soucek 208-634-0812 psoucek@fs.fed.us |
| Description: Short- and long-term management strategies and priorities for maintaining and restoring habitats associated with terrestrial wildlife species.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28633 |
|||||
| Location: UNIT - Payette National Forest All Units. STATE - Idaho. COUNTY - Adams, Idaho, Valley, Washington. Payette National Forest. | |||||
| Back To Top | |||||
Payette National Forest, Occurring in more than one District (excluding Forestwide) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Council and Weiser Districts On/Off Allotments Project EA *NEW LISTING* |
- Grazing management |
In Progress: Scoping Start 05/02/2012 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:09/2012 |
10/2012 |
Robert Bumgarner 208-365-7012 rbumgarner@fs.fed.us |
| Description: The Proposed Action is to authorize continued grazing on six on/off grazing allotments on the Weiser and Council Ranger Districts consistent with requirements of the 2003 Payette National Forest Land and Resource Management Plan.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39415 |
|||||
| Location: UNIT - Council Ranger District, Weiser Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - Sec 10, 15 T16N R2W; Sec 26, 27 T16N R3W; Sec 20, 21, 27 T16N R4W; Sec 3 T17N R4W, BM. Sec 10, 15 T16N R2W; Sec 26, 27 T16N R3W; Sec 20, 21, 27 T16N R4W; Sec 3 T17N R4W, BM. | |||||
|
West Zone Payette Timber Stand Improvement [12] CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
Clark Lucas 208-634-0424 clucas@fs.fed.us |
| Description: Pre-commercially thin approximately 5000 acres of wild and planted stands (over a five year period) from the 1960s, 1970s, and early 1980s . This project would thin stands from 300 to 1000 stems per acre to about 200 trees per acre. | |||||
| Location: UNIT - Council Ranger District, Weiser Ranger District. STATE - Idaho. COUNTY - Adams, Washington. LEGAL - T18N,R1E,Sections 7-9,17-22,27-34;T18N,R3W,Sections 1,12,13,24;T18N,R2W,Sections 4-1,13,14,16-20;T19N,R3W,Sections 5-8,17,18;T15N,R4W,Sections 7-19,30,31;T15N, R5W,Sections 1,3-17,21,23-26. Management Areas 2 and 3. | |||||
| Back To Top | |||||
Payette National Forest, Council Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Idaho Power Company Access Road and Maintenance Project CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/17/2012 |
Expected:07/2012 |
07/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Proposed maintenance would install interior poles @ five locations and create one short access road to an existing right-of-way to remediate shield wire sag issues that result in outages during periods of extreme icing and improve system reliability. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T. 18N., R. 1E., section 21 and T. 18N., R. 3W, section 9. Approximately 7 miles southwest of New Meadows, Idaho and approximately 14 miles northwest of Council, Idaho. | |||||
|
Idaho Power Company Big Bar-Silver King Mine 12kV buried distribution line special use permit CE *NEW LISTING* |
- Special use management |
In Progress: 215 Comment Period Legal Notice 06/01/2012 |
Expected:12/2012 |
12/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Operation and maintenance of a 12kV buried distribution line approximately 6.7 miles in length with a 15 foot right-of-way. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - Begins at T. 21N., R. 3W., section 31 and ends at T. 20N., R. 3W., section 2. The line begins at Big Bar in Hells Canyon and extends cross country above Cuprum, Idaho to the Silver King Mine. | |||||
|
Idaho Power Company Oxbow-McCall 138kV transmission line special use permit CE *NEW LISTING* |
- Special use management |
In Progress: 215 Comment Period Legal Notice 06/01/2012 |
Expected:12/2012 |
12/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Operation and maintenance of a 138kV transmission line that is approximately 12.6 miles in length with a 100 foot right-of-way. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - The project begins at T. 19N, R. 3W, section 31 and ends at T. 18N, R. 1E, section 21 on Forest System land. The line extends from the Oxbow substation in Hells Canyon to the McCall substation in McCall, Idaho. | |||||
|
Mill Creek - Council Mountain [24] EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
Completed | Actual: 04/06/2012 | 08/2012 |
Stephen Penny 208-253-0164 spenny@fs.fed.us |
| Description: The project area is approximately 50,000 acres. Vegetation treatments include mechanical, hand, and prescribed burning. Watershed improvements include existing road improvement and road decommissioning. Recreational improvements are also included.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31297 |
|||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T16N R1E, T16N R2E, T17N R1E, T17N R2E, and T18N R1E. Council Ranger District. | |||||
|
Poison Timber Trail Reconstruction CE |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 04/12/2012 |
Expected:06/2012 |
08/2012 |
Jane Cropp 208-634-0757 jcropp@fs.fed.us |
| Description: Conversion of 1.8 miles of existing old system road to ATV/UTV trail, by improving existing 2 track trail or old road bed to Forest Service design specifications for Trail Class 2 (moderately developed) ATV trail use.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37514 |
|||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T14N R2W Sections 33 & 34. Council Ranger District near Poison Timber Point. | |||||
| Back To Top | |||||
Payette National Forest, Krassel Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Fishing Access Rehabilitation Project CE *NEW LISTING* |
- Recreation management - Wildlife, Fish, Rare plants - Road management |
Cancelled | N/A | N/A |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would repair and restore fishing access sites along the South Fork Salmon River Road. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 19 N., R. 6 E.; Boise Meridian, Valley County, Idaho. South Fork Salmon River Road. | |||||
|
Gillihan No Name Creek Water System Special Use Permit CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:10/2012 | 10/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: The continued diversion and transmission of water from No Name Creek, a tributary of Big Creek, with approximately 200 feet of 10 inch diameter conduit pipe across National Forest system land to private property. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T.21N., R.9E., section 35, NW1/4, NE1/4, Boise Meridian. Big Creek is approximately 70 miles northeast of McCall, Idaho. | |||||
|
Golden Hand #1 and #2 Lode Mining Claims Plan of Operations [81] EIS |
- Minerals and Geology |
In Progress: DEIS NOA in Federal Register 06/29/2012 Est. FEIS NOA in Federal Register 09/2012 |
Expected:09/2012 |
11/2012 |
Jim Egnew 208-634-0700 jegnew@fs.fed.us |
| Description: Plan of Operations (POO) proposal to allow for collection of subsurface geological information on the Golden Hand #1 and #2 mining claims. The mining claims are located in the Frank Church-River of No Return Wilderness.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27442 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Idaho, Valley. LEGAL - T22N, R9E, Section 23, Boise Meridian. Approximately 50 miles northeast of McCall, Idaho. The claims encompass approximately 20 acres each adjacent to Coin Creek, a tributary of Beaver Creek. | |||||
|
Golden Meadows Exploration Project EA |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 05/17/2012 |
Expected:07/2012 |
08/2012 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would conduct exploration drilling in 26 drill areas within NFS land. Roughly 139 drill pads would be used to conduct drilling activiities. Associated actvities include a well, access roads, water lines, and rock source.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37756 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - Sections 1, 2, 3, 10, 11, 12, 15, 13, 14, Township 18 North, Range 9 East, and Section 35, Township 19 North, Range 9 East, Boise Meridian. The project is located in the Stibnite-Yellow Pine Mining District in central Idaho, approximately 14 miles east of Yellow Pine, Idaho. | |||||
|
Krassel Ranger District Ditch Bill Easement [76] CE |
- Regulations, Directives, Orders |
In Progress: Scoping Start 10/01/2007 |
Expected:12/2012 |
01/2013 |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T20N, R13E, Section 3. Taylor landing field. | |||||
|
Lower Secesh Watershed Restoration Project EA |
- Recreation management - Watershed management - Road management |
On Hold | N/A | N/A |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The Proposed Action would implement a range of activities, including road decommissioning/rehabilitation, route designation, stream crossing improvement, trail designation or improvements, and interpretive improvements.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35966 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 20 N., R. 5 E., T. 20 N., R. 6 E., T. 21 N., R. 6 E.; Boise Meridian, Valley County, Idaho. The analysis area is located within the Secesh and South Fork of the Salmon River drainages and is approximately 18 miles north and east of McCall, ID. | |||||
|
Phoebe Creek Dispersed Recreation Site Management Project EA |
- Recreation management | Completed | Actual: 04/02/2012 | 07/2012 |
Clem Pope 208-634-0616 cpope@fs.fed.us |
| Description: Install a vault toilet at the dispersed camp site. Improve signage with a kiosk at the trailhead along Forest Road 775. Surface the access road to trailhead area and dispersed camp parking.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33827 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 18 N., R 6 E., Section 10; Boise Meridian, Valley County, Idaho. Phoebe Creek Dispersed Recreation site, along a .16 mile segment of road #775, located immediately off the South Fork road #674. | |||||
|
Pioneer Creek Water Intake and Screen Project CE *NEW LISTING* |
- Special use management | Cancelled | N/A | N/A |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would replace the existing Pioneer Creek water intake structure at the University of Idaho Taylor Ranch.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39059 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 20 N., R 13 E., Section 3; Boise Meridian, Valley County, Idaho. Pioneer Creek a tributary of Big Creek in the FC-RONR Wilderness. | |||||
|
Silver Run Bulk Sampling Project CE *NEW LISTING* |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 04/26/2012 |
Expected:08/2012 |
09/2012 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would conduct bulk sampling of a silver deposit in order to evaluate feasibility of long term mining.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39058 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 17 N., R. 6 E., Section 14; Boise Meridian, Valley County, Idaho. Silver Creek a Tributary of South Fork Salmon River. | |||||
|
Valley County FRTA Project CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/26/2012 |
Expected:07/2012 |
08/2012 |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: Valley County has submitted a special use application requesting authorization for the continued use and maintenance a road for public use. The road is approximately ½ mile long and is accessed from the McCall-Stibnite road #50412 roughly ½ mile.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35008 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 19 N., R. 8 E., Section 20; Boise Meridian, Valley County, ID. The road is approximately ½ mile long and is accessed from the McCall-Stibnite road #50412 roughly ½ miles west of Yellow Pine, ID. | |||||
|
Vaughn Water System [78] CE |
- Special use management |
In Progress: Scoping Start 06/28/2009 Est. 215 Comment Period Legal Notice 08/2012 |
Expected:09/2012 |
09/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Re-issuance of a special use permit for a diversion on Lick Creek, open irrigation ditch (approximately 150), cement check dam and gate on ditch, waterline covering 960 feet and 250 gallon underground holding tank. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T.20N., R.9E., section 2, B.M. Diversion is off of Lick Creek in the Big Creek area, approximately 39 miles northeast of McCall, Idaho. | |||||
|
Zena Ranch Hazard Tree Project CE |
- Facility management | On Hold | N/A | N/A |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would fell and remove dead and imminently dead trees immediately adjacent the Zena Ranch.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37443 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 20 N., R. 6 E., Section 29; Boise Meridian, Valley County, Idaho. Zena Creek Ranch near the confluence of Secesh River and Zena Creek. | |||||
| Back To Top | |||||
Payette National Forest, McCall Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Brundage Wildland Urban Interface / Bear Basin Restoration Project EA |
- Fuels management |
In Progress: 215 Comment Period Legal Notice 08/17/2011 |
Expected:06/2012 |
10/2012 |
Paul Klasner 208-634-0630 pklasner@fs.fed.us |
| Description: Treat stands around the private property at Brundage Mountain Resort to reduce the potential for uncharacteristic wildfire and modify fuel conditions so that in the event of a wildfire, effective suppression actions are more likely to be successful.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28179 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N, R2E, sections 13 & 24; T19N, R3E, sections 18 &19. Approximately 5 miles north of McCall near Brundage Mountain Resort. | |||||
|
Burgdorf Admininistrative Hazard Tree Project CE |
- Recreation management - Facility management |
Completed | Actual: 06/05/2012 | 06/2012 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would fell and remove dead and imminently dead trees within and immediately adjacent Corduroy Creek dispersed area, Bear Pete Trailhead and dispersed area, Jeannette Campground, and Burgdorf Campground.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37442 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 22 N., R. 4 E., and T. 23 N., R. 4 E.; Boise Meridian, Idaho County, Idaho. Campgrounds, dispersed areas, and trailheads in the Burgdorf Hot Springs vicinity. | |||||
|
Chelsie Lode Exploration Project CE |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 04/26/2012 |
Expected:05/2012 |
06/2012 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would excavate up to 25 sample pits to expose and sample vein material for assay. The maximum pit size would be approximately four feet wide by 20 feet long by five feet deep.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35618 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 24 N., R. 5 E., Section 26 and 35, Boise Meridian, Idaho County, Idaho. The project area is approximatetly 36 miles north and east of McCall, Idaho. | |||||
|
McCall Ranger District Ditch Bill Easement CE |
- Special use management | Cancelled | N/A | N/A |
Kathryn Nash 208-634-0416 knash@fs.fed.us |
| Description: Issuance of a Colorado Ditch Bill easement and attached operation and maintenance plan for the Blackwell Lake dam and reservoir | |||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - Township 19 N, Range 4E, Section 20, Boise Meridian. Blackwell Lake dam and reservoir. | |||||
|
McCall Ranger District Ditch Bill Easement [58] CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T20N, R2E, Section 30. Brundage Reservoir. | |||||
|
Rescue Mine Expansion Project EA |
- Minerals and Geology | On Hold | N/A | N/A |
Jeff Hunteman 208-634-0462 jhunteman@fs.fed.us |
| Description: This project proposes to reauthorize the continuing use of the existing infrastructure, the addition of new facilities, and exploratory drilling.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34374 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 22 N., R 6 E., Section 11, Boise Meridian, Idaho County, Idaho. Approximately one half mile southeast of Warren, ID. | |||||
| Back To Top | |||||
Payette National Forest, New Meadows Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Brundage Mountain Resort Cat-Ski Outfitter and Guide Permit Boundary Expansion EA |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/17/2012 |
Expected:06/2012 |
11/2012 |
Jane Cropp 208-634-0757 jcropp@fs.fed.us |
| Description: Amend the existing Outfitter and Guide Special Use Permit issued to Brundage Mountain Resort for their Cat-skiing program, expand the existing boundary up to Six Mile Ridge in the Granite Mountain Area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37511 |
|||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N R2E. Granite Mountain near Goose Lake Reservoir. | |||||
|
Goose Lake Dispersed Camp Restoration Project CE *NEW LISTING* |
- Recreation management - Watershed management |
In Progress: 215 Comment Period Legal Notice 06/28/2012 |
Expected:09/2012 |
07/2013 |
Leigh Bailey 208-347-0335 lbailey@fs.fed.us |
| Description: Rehabilitate dispersed camping sites along the northeast shore of Goose Lake by decommissioning a small portion (.1 miles) of Forest Road 50508 and converting it into a trail, and revegetating selected dispersed camping sites. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Sections 1, 11, 12, 13 and 14, Boise Meridian. North of New Meadows, Idaho, along northeast shore of Goose Lake,. | |||||
|
Lost Cr/Boulder Cr Landscape Restoration Project EIS |
- Land management planning - Recreation management - Special area management - Wildlife, Fish, Rare plants - Forest products - Fuels management - Watershed management - Road management |
Developing Proposal Est. NOI in Federal Register 01/2013 |
Expected:01/2014 | 06/2014 |
Michael Beckwith 208-347-0300 mabeckwith@fs.fed.us |
| Description: Move forest vegetation, fuels / fire conditions toward historical range of variability to reduce wildland fire risk, improve wildlife habitat / watershed conditions, meet Forest Plan direction, by mechanical thinning / harvest and prescribed burning.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33830 |
|||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T18N, R1W; T19N, R2W; T20N, R1W; T20N, R2W; T21N, R1W. western portion of New Meadows Ranger District. | |||||
|
New Meadows Ditch Bill Project [28] - Delbaere-Campbell Ditch CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve applications for irrigation and stockwatering easements including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Sections 5, 8, 17, and 20. Junction of Forest Road 294 and Trail 165 on Browns Creek. | |||||
|
New Meadows Ditch Bill Project [29] - Campbell spring CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Section 27. End of Forest Road 305. | |||||
|
New Meadows Ditch Bill Project [30] - W Fk Lake Creek CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T23N, R2E, Section 6. Two miles east of Indian Mountain, West Lake Creek. | |||||
|
New Meadows Ditch Bill Project [37] - Granite/Twin Lakes CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve applications for irrigation and stockwatering easements including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Section 2. A mile east of Granite Mtn Lookout - Twin Lakes. | |||||
|
New Meadows Ditch Bill Project [38] - Goose Lake CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Sections 1, 11, 12 and 14,. Goose Lake. | |||||
|
New Meadows Ditch Bill Project [39] - Goose Canal CE |
- Land ownership management | On Hold | N/A | N/A |
Dawn Alvarez 801-625-5435 dalvarez@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N, R2E, Section 27. Half mile east of Packer John State Park off of Hwy 55. | |||||
|
Rapid River Trails EA |
- Recreation management - Special area management |
On Hold | N/A | N/A |
Michael Beckwith 208-347-0325 mabeckwith@fs.fed.us |
| Description: Change trail use designation in and crossing Rapid R Wild River Corridor to non-motorized / -mechanized; investigate joining trails designated 2-wheel motorized to the W and E of the Corridor; and 2-wheel motorized access to Lick Cr Lookout.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36507 |
|||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - R1W, T21N, Sec. 28, 29, 31, 32; R1W, T20N, Sec. 6, 7; R2W, T21N, Sec. 36. New trail construction and/or reconstruction in R2W, T20N, Sec. 1 and/or R1W, T30N, Sec. 6. Around the southern end of the designated Rapid River Wild River Corridor in the western portion of New Meadows Ranger District. | |||||
|
Rocky Bear Project [49] EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
Completed |
Actual: 05/31/2012 05/31/2012 |
07/2012 |
Michael Beckwith 208-347-0300 mabeckwith@fs.fed.us |
| Description: Fuels reduction, thinning, shift Fire Regime Condition Class (FRCC), Wildland Urban Interface (WUI) - related forest management actions on approximately 826 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28123 |
|||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N R2E Sections 22, 23, 26, 27, 34, 35. Approximately 4 miles east of New Meadows, Idaho, in the areas to the north, south and west of Highway 55 within the national Forest boundary. | |||||
|
Scism Waterline Project CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 04/17/2012 |
Expected:08/2012 |
08/2012 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Operation and maintenance of a buried waterline to carry overflow water from a Forest Service stock water tank to a stock water tank on private land. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T. 18N., R. 1W., section 28. Approximately 9 miles northwest of Council, Idaho. | |||||
| Back To Top | |||||
Payette National Forest, Weiser Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Fence and Gate Sturgill Wildlife Management Area CE |
- Special use management |
In Progress: Scoping Start 12/14/2011 Est. 215 Comment Period Legal Notice 05/2012 |
Expected:06/2012 |
06/2012 |
Kathryn Nash 208-634-0416 knash@fs.fed.us |
| Description: Idaho Power Company has requested authorization to maintain an existing barbed wire fence and gate on National Forest Land adjacent to the Sturgill Wildlife Management Area. | |||||
| Location: UNIT - Weiser Ranger District. STATE - Idaho. COUNTY - Washington. LEGAL - T. 15N, R. 6W, section 14. Approximately 20 miles west of Cambridge, Idaho. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||