Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) - R4 - Intermountain Region, Payette National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R4 - Intermountain Region, Payette National Forest, Occurring in more than one District (excluding Forestwide) - R4 - Intermountain Region, Payette National Forest, Council Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, Krassel Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, McCall Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, New Meadows Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Payette National Forest, Weiser Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS *NEW LISTING* |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 09/2011 |
Expected:10/2011 |
10/2011 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 05/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
University of Florida Passive Seismic Survey CE *NEW LISTING* |
- Minerals and Geology - Special use management - Research |
In Progress: Scoping Start 11/01/2010 |
Expected:07/2011 |
07/2011 |
Elaine Alexander 208-373-4318 ealexander@fs.fed.us |
| Description: Installing a total of 36 seismic stations across 4 National Forests. Each station includes a buried broadband sensor, data recorders, solar panels, batteries. This 2-year research is sponsored by the National Science Foundation - Earthscope Project. | |||||
| Location: UNIT - Boise National Forest All Units, Council Ranger District, Salmon-Challis National Forest All Units, Sawtooth National Recreation Area, Fairfield Ranger District, Weiser Ranger District, Ketchum Ranger District. STATE - Idaho. COUNTY - Adams, Blaine, Boise, Butte, Camas, Custer, Elmore, Gem, Lemhi, Valley, Washington. Multiple passive seismic stations per Forest: Boise NF - 14; Payette NF - 8; Sawtooth NF - 3; and Salmon-Challis - 11. | |||||
|
Virginia Tech Controlled-Source Seismic Survey CE *NEW LISTING* |
- Special area management - Research |
In Progress: Scoping Start 11/01/2010 |
Expected:02/2012 |
06/2012 |
Elaine Alexander 208-373-4318 ealexander@fs.fed.us |
| Description: At each shot site, a vertical hole drilled 75-150 feet deep is filled with chemical explosives. A single "shot" is fired to induce seismicity at each site. Small seismometers are temporarily deployed to record the ground shaking from the shot. | |||||
| Location: UNIT - Emmett Ranger District, Challis-Yankee Fork Ranger District, Sawtooth National Recreation Area, Cascade Ranger District, Weiser Ranger District, Lowman Ranger District, Lost River Ranger District. STATE - Idaho. COUNTY - Adams, Custer, Gem, Valley. Boise NF - 9 shot sites; Payette NF - 1; Sawtooth NF - 1; Salmon-Challis NF - 2. Shot locations along an east-west transect, between 44.25600 and 44.53531 north latitude. | |||||
| Back To Top | |||||
Payette National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Fly Fish McCall Permit Re-Issuance Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 06/2011 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would re-issue the special use permit to Fly Fish McCall (Idaho Angler McCall, LLC) to continue what has been a successful and compliant fishing outfitter and guide operation.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35628 |
|||||
| Location: UNIT - Payette National Forest All Units. STATE - Idaho. COUNTY - Adams, Idaho, Valley. McCall, Krassel, and New Meadows Ranger Districts. | |||||
|
NRCS Snow Data Collection Site Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:07/2011 | 08/2011 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The Natural Resource Conservation Service is requesting authorization for the continued operation of manual snow course and automated SNOTEL sites to collect hydrometeorological and climatic data for purposes of water supply forecasting.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35634 |
|||||
| Location: UNIT - Payette National Forest All Units. STATE - Idaho. COUNTY - Adams, Valley, Washington. LEGAL - T 15N, R 5W, sec. 30, T 17N, R 2E, sec. 32, T 20N, R 3E, sec. 30, T 20N, R 1W, sec. 15, T 19N., R 3E., sec. 30, T 21N., R 4E., sec. 4, and T 18N., R 4E., sec. 3; Boise Meridian, Idaho. Bear Saddle on the Weiser RD, Squaw Flat on the Council RD, Brundage Reservoir and West Branch on the New Meadows RD, and Bear Basin, Secesh Summit, and Lake Fork Guard Station on the McCall RD. | |||||
|
Wildlife Conservation Strategy (Forest Plan Amendment) [101] EIS |
- Land management planning - Wildlife, Fish, Rare plants |
In Progress: DEIS NOA in Federal Register 01/21/2011 Est. FEIS NOA in Federal Register 12/2011 |
Expected:12/2011 |
05/2012 |
Patricia Anderson Soucek 208-634-0812 psoucek@fs.fed.us |
| Description: Short- and long-term management strategies and priorities for maintaining and restoring habitats associated with terrestrial wildlife species.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28633 |
|||||
| Location: UNIT - Payette National Forest All Units. STATE - Idaho. COUNTY - Adams, Idaho, Valley, Washington. Payette National Forest. | |||||
| Back To Top | |||||
Payette National Forest, Occurring in more than one District (excluding Forestwide) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Firewood Roads 2011 CE *NEW LISTING* |
- Forest products |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 05/2011 |
Stephen Penny 208-253-0164 spenny@fs.fed.us |
| Description: Proposed roads currently closed to public travel would be opened to provide public firewood cutting and removal under current firewood permit restrictions. | |||||
| Location: UNIT - Council Ranger District, Weiser Ranger District. STATE - Idaho. COUNTY - Adams, Washington. LEGAL - T13N R1E, R5W, R6W;T14N R1E, R5W, R6W;T15N R1E-R3E,R4W-R6W;T16N R1E-R3E,R3W-R6W;T17N R1E-R2E,R1W-R4W;T18N R1E-R2E,R2W-R4W;T19N R2W-R4W;T20N R1W-R4W; T21N R1W-R4W; T22N R2W-R3W. Council and Weiser Ranger Districts. | |||||
|
Weiser River Fuels Reduction EA [35] EA |
- Fuels management |
In Progress: Objection Period Legal Notice 03/03/2011 |
Expected:05/2011 |
06/2011 |
Michael Beckwith 208-347-0300 mabeckwith@fs.fed.us |
| Description: To provide an area of reduced wildfire risk adjacent to private lands and Hwy 95 corridor. Commercial timber harvest (and BD) 1345ac., timber stand improvement 279 ac., prescribed burn 475 ac., 5.1 mi road decom, and 1.2 mi road construction
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=19576 |
|||||
| Location: UNIT - Council Ranger District, New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T18 N, 1W, Sections 1, 12, 13, 24, and 25, T18N, R1E Sections 6-8, 17-20, and 28-32, Boise Meridian. US Highway 95 Corridor between Pine Ridge and Council, Idaho. | |||||
|
West Zone Payette Timber Stand Improvement [12] CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
On Hold | N/A | N/A |
Clark Lucas 208-634-0424 clucas@fs.fed.us |
| Description: Pre-commercially thin approximately 5000 acres of wild and planted stands (over a five year period) from the 1960s, 1970s, and early 1980s . This project would thin stands from 300 to 1000 stems per acre to about 200 trees per acre. | |||||
| Location: UNIT - Council Ranger District, Weiser Ranger District. STATE - Idaho. COUNTY - Adams, Washington. LEGAL - T18N,R1E,Sections 7-9,17-22,27-34;T18N,R3W,Sections 1,12,13,24;T18N,R2W,Sections 4-1,13,14,16-20;T19N,R3W,Sections 5-8,17,18;T15N,R4W,Sections 7-19,30,31;T15N, R5W,Sections 1,3-17,21,23-26. Management Areas 2 and 3. | |||||
| Back To Top | |||||
Payette National Forest, Council Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Boehm Access Road CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:08/2011 | 09/2011 |
Kathryn Nash 208-634-0416 knash@fs.fed.us |
| Description: The authorization of a special use permit for long term access to private property via Forest Service roads #50610 (3000 feet) and #50666 (2590 feet) on the Council Ranger District. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T 14N, R 1E, section 13 and 14, Boise Meridian. 13 miles southeast of Council, Idaho. | |||||
|
Deep Creek Trail Improvement Project [14] CE |
- Recreation management |
In Progress: Scoping Start 12/10/2009 |
Expected:06/2011 |
07/2011 |
Brant Petersen 208-392-6681 bpetersen02@fs.fed.us |
| Description: Trail re-route of 0.3 miles, installation of a 34 foot gluelam bridge and foot bridges to provide safe public access to over 30 miles of multiple use trails in the Deep Creek drainage.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31336 |
|||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T21N R3W section 1, and T22N R3W sections 23, 26, 35, 36. Council Ranger District, Deep Creek Drainage, Adams County Idaho. | |||||
|
Kramer LLC Water System CE |
- Special use management | Completed | Actual: 02/22/2011 | 04/2011 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Authorize an existing water system with approximately 3,410 feet of buried 2" pipe on Forest System land connecting to private property. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T. 18N, R. 3W, section 23. Approximately 12 miles NW of Council, Idaho, off of the Council-Cuprum Road. | |||||
|
Lower East Fork Fuels Reduction Project [4] EA |
- Forest products - Fuels management |
On Hold | N/A | N/A |
Jeff Canfield 208-253-0100 jcanfield@fs.fed.us |
| Description: Manage Forest Vegetation to reduce hazardous fuel risk, and risk to ecosystem components. | |||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. Lower East Fork Weiser River. | |||||
|
Mill Creek - Council Mountain [24] EIS |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
In Progress: NOI in Federal Register 06/03/2010 Est. DEIS NOA in Federal Register 05/2011 |
Expected:09/2011 |
02/2012 |
Stephen Penny 208-253-0164 spenny@fs.fed.us |
| Description: The planning area is approximately 50,000 acres. Vegetation treatments may include mechanical, hand, and prescribed burning. Watershed improvements may include existing road improvement and road decommissioning. Recreational trail work may also occur
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31297 |
|||||
| Location: UNIT - Council Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T16N R1E, T16N R2E, T17N R1E, T17N R2E, and T18N R1E. Council Ranger District. | |||||
| Back To Top | |||||
Payette National Forest, Krassel Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Big Creek Hazardous Fuels Reduction Project [82] EA |
- Fuels management | On Hold | N/A | N/A |
Paul Klasner 208-634-0630 pklasner@fs.fed.us |
| Description: Create an area of reduced wildfire risk and fire severity/intensity on NFS lands around Edwardsburg and private property using commercial timber harvest, understory treatment, prescribed burning. Project scoping will be reinitated. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T20N, R9E Sections 1 - 3, 10, and 11; and T21N, R9E Sections 23, 26 - 36; Boise Meridian. About 39 miles east of McCall in Valley County, Idaho and can be accessed from the Profile Gap Road (Forest Road 50340). | |||||
|
Cow Secesh Face Project EA |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 05/27/2010 Est. 215 Comment Period Legal Notice 08/2011 |
Expected:09/2011 |
10/2011 |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: Project would decommission approximately 30 miles of road in the Fitsum and Cow watersheds.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32650 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - Sections 18-20, 28-34, T20N R6E, and Sections 4-8, T19N R6E, Boise Meridian. The project area is located approximately 20 miles northeast of McCall on the Krassel Ranger District. | |||||
|
Golden Hand #1 and #2 Lode Mining Claims Plan of Operations [81] EIS |
- Minerals and Geology |
In Progress: NOI in Federal Register 11/21/2008 Est. DEIS NOA in Federal Register 05/2011 |
Expected:09/2011 |
10/2011 |
Jim Egnew 208-634-0700 jegnew@fs.fed.us |
| Description: Plan of Operations (POO) proposal to allow for collection of subsurface geological information on the Golden Hand #1 and #2 mining claims. The mining claims are located in the Frank Church-River of No Return Wilderness.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=27442 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T22N, R9E, Section 23, Boise Meridian. Approximately 50 miles northeast of McCall, Idaho. The claims encompass approximately 20 acres each adjacent to Coin Creek, a tributary of Beaver Creek. | |||||
|
Krassel Ranger District Ditch Bill Easement [76] CE |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T20N, R13E, Section 3. Taylor landing field. | |||||
|
Phoebe Creek Dispersed Recreation Site Management Project EA |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 12/09/2010 |
Expected:10/2011 |
10/2011 |
Clem Pope 208-634-0616 cpope@fs.fed.us |
| Description: Install a vault toilet and three fire rigns at the dispersed camp site. Improve signage with a kiosk at the trailhead along Forest Road 775. Surface the access road to trailhead area and dispersed camp parking.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33827 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 18 N., R 6 E., Section 10; Boise Meridian, Valley County, Idaho. Phoebe Creek Dispersed Recreation site, along a .16 mile segment of road #775, located immediately off the South Fork road #674. | |||||
|
Rosenbaum Spring Development Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:04/2011 | 06/2011 |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: This project proposes to issue a special use permit for the continued operation and maintenance of an existing spring development on National Forest System (NFS) land.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35009 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 19 N., R. 7 E., Section 25; Boise Meridian, Valley County, ID. The project is located approximately three miles west of Yellow Pine, ID. | |||||
|
Valley County FRTA Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:04/2011 | 06/2011 |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: Valley County has submitted a special use application requesting authorization for the continued use and maintenance a road for public use. The road is approximately ½ mile long and is accessed from the McCall-Stibnite road #50412 roughly ½ mile.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35008 |
|||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T. 19 N., R. 8 E., Section 20; Boise Meridian, Valley County, ID. The road is approximately ½ mile long and is accessed from the McCall-Stibnite road #50412 roughly ½ miles west of Yellow Pine, ID. | |||||
|
Vaughn Water System [78] CE |
- Special use management |
In Progress: Scoping Start 06/28/2009 |
Expected:09/2011 |
09/2011 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Re-issuance of a special use permit for a diversion on Lick Creek, open irrigation ditch (approximately 150), cement check dam and gate on ditch, waterline covering 960 feet and 250 gallon underground holding tank. | |||||
| Location: UNIT - Krassel Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T.20N., R.9E., section 2, B.M. Diversion is off of Lick Creek in the Big Creek area, approximately 39 miles northeast of McCall, Idaho. | |||||
| Back To Top | |||||
Payette National Forest, McCall Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2009 Unity Mine Drilling Project [59] CE |
- Minerals and Geology | Cancelled | N/A | N/A |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: Drill three exploration holes to determine underground mineralization, including approximately 1/4 mile of temporary road.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29476 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T22N, R6E, section 14. Near the town of Warren, Idaho. | |||||
|
Brundage Mountain Resort Toilet and Communication Project CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 08/2011 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would install three vault toilets and bury approximately 1,400 feet of communication cable.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35643 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T. 19 N., R. 2 E., Section 12; T. 19 N., R. 3 E., Section 7; Boise Meridian, Adams County, Idaho. Brundage Mountain Resort. | |||||
|
Brundage Wildland Urban Interface / Bear Basin Restoration Project EA |
- Fuels management |
In Progress: Scoping Start 12/10/2009 Est. 215 Comment Period Legal Notice 05/2011 |
Expected:07/2011 |
11/2011 |
Paul Klasner 208-634-0630 pklasner@fs.fed.us |
| Description: Treat stands around the private property at Brundage Mountain Resort to reduce the potential for uncharacteristic wildfire and modify fuel conditions so that in the event of a wildfire, effective suppression actions are more likely to be successful
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28179 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N, R2E, sections 13 & 24; T19N, R3E, sections 18 &19. Approximately 5 miles north of McCall near Brundage Mountain Resort. | |||||
|
Chelsie Lode Exploration Project CE *NEW LISTING* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 07/2011 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would excavate up to 25 sample pits to expose and sample vein material for assay. The maximum pit size would be approximately four feet wide by 20 feet long by five feet deep.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35618 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 24 N., R. 5 E., Section 26 and 35, Boise Meridian, Idaho County, Idaho. The project area is approximatetly 36 miles north and east of McCall, Idaho. | |||||
|
Fall Creek Vegetation Management Project [60] EA |
- Fuels management | On Hold | N/A | N/A |
Jeff Hunteman 208-382-7400 jhunteman@fs.fed.us |
| Description: Manage timber stands in the Fall Creek area to change condition class through timber harvest or precommercial thinning. No new road construction. | |||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T24N, R4E. Fall Creek drainage northwest of Burgdorf, Idaho. | |||||
|
Little Ski Hill Improvements Project CE |
- Special use management |
Developing Proposal Est. Scoping Start 02/2011 |
Expected:03/2011 | 07/2011 |
Gary Elliot 208-634-0415 gelliot@fs.fed.us |
| Description: The project proposes to conduct several small projects that will provide skier improvements, promote a safer atmosphere for the general public, and will provide needed maintenance structures to store equipment.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34370 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Adams, Valley. LEGAL - T. 18 N., R 2 E., Section 1 and T. 19 N., R. 3 E., Section 31, Boise Meridian, Idaho. Little Ski Hill and Little Bear Basin Nordic Ski Area. | |||||
|
McCall Ranger District Ditch Bill Easement [58] CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Valley. LEGAL - T20N, R2E, Section 30. Brundage Reservoir. | |||||
|
Rescue Mine Expansion Project EA |
- Minerals and Geology |
In Progress: Scoping Start 02/10/2011 Est. 215 Comment Period Legal Notice 06/2011 |
Expected:09/2011 |
10/2011 |
Jeff Hunteman 208-634-0462 jhunteman@fs.fed.us |
| Description: This project proposes to reauthorize the continuing use of the existing infrastructure, the addition of new facilities, and exploratory drilling.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34374 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 22 N., R 6 E., Section 11, Boise Meridian, Idaho County, Idaho. Approximately one half mile southeast of Warren, ID. | |||||
|
Unity Mine Drilling Project CE *NEW LISTING* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 07/2011 |
Jeff Hunteman 208-634-0434 jhunteman@fs.fed.us |
| Description: The proposed action would construct three drill pads and conduct exploratory core drilling from each pad. Drill pads would be constructed on temporary roads.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35625 |
|||||
| Location: UNIT - McCall Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T. 22 N., R. 5 E., Sections 11 and 14, Boise Meridian, Idaho County, Idaho. The project area is located approximately 32 miles northeast of McCall, ID and approximately one-half mile south of Warren, ID. | |||||
| Back To Top | |||||
Payette National Forest, New Meadows Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Campbell's Camp Grazing Facility [41] CE |
- Special use management | On Hold | N/A | N/A |
Kathryn Nash 208-634-0416 knash@fs.fed.us |
| Description: Analysis of the continued use and maintenance of privately owned grazing facilities which are located on National Forest System lands and utilized by a permittee. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T22N, R1W, section 25. Approximately 2 miles south of Lockwood Point. | |||||
|
New Meadows Ditch Bill Project [28] - Delbaere-Campbell Ditch CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve applications for irrigation and stockwatering easements including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Sections 5, 8, 17, and 20. Junction of Forest Road 294 and Trail 165 on Browns Creek. | |||||
|
New Meadows Ditch Bill Project [29] - Campbell spring CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Section 27. End of Forest Road 305. | |||||
|
New Meadows Ditch Bill Project [30] - W Fk Lake Creek CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Idaho. LEGAL - T23N, R2E, Section 6. Two miles east of Indian Mountain, West Lake Creek. | |||||
|
New Meadows Ditch Bill Project [37] - Granite/Twin Lakes CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve applications for irrigation and stockwatering easements including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Section 2. A mile east of Granite Mtn Lookout - Twin Lakes. | |||||
|
New Meadows Ditch Bill Project [38] - Goose Lake CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T20N, R2E, Sections 1, 11, 12 and 14,. Goose Lake. | |||||
|
New Meadows Ditch Bill Project [39] - Goose Canal CE |
- Land ownership management | On Hold | N/A | N/A |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N, R2E, Section 27. Half mile east of Packer John State Park off of Hwy 55. | |||||
|
New Meadows Landscape Restoration EIS |
- Land management planning |
Developing Proposal Est. NOI in Federal Register 07/2011 |
Expected:12/2012 | 06/2013 |
Michael Beckwith 208-347-0300 mabeckwith@fs.fed.us |
| Description: Move forest vegetation, fuels / fire conditions toward historical range of variability to reduce wildland fire risk, improve wildlife habitat / watershed conditions, meet Forest Plan direction, by mechanical thinning / harvest and prescribed burning. | |||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T18N, R1W; T19N, R2W; T20N, R1W; T20N, R2W; T21N, R1W. western portion of New Meadows Ranger District. | |||||
|
Rocky Bear WUI Project [49] EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 10/29/2009 |
Expected:06/2011 |
06/2011 |
Michael Beckwith 208-347-0300 mabeckwith@fs.fed.us |
| Description: Fuels reduction, thinning, shift Fire Regime Condition Class (FRCC), Wildland Urban Interface (WUI) - related forest management actions on approximately 700 acres.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28123 |
|||||
| Location: UNIT - New Meadows Ranger District. STATE - Idaho. COUNTY - Adams. LEGAL - T19N R2E Sections 22, 23, 26, 27, 34, 35. Approximately 4 miles east of New Meadows, Idaho, in the areas to the north, south and west of Highway 55 within the national Forest boundary. | |||||
| Back To Top | |||||
Payette National Forest, Weiser Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Brownlee Watershed Grazing Allotments [26] EA |
- Grazing management | Cancelled | N/A | N/A |
Maura Laverty 208-253-0114 mlaverty@fs.fed.us |
| Description: Manage domestic livestock grazing activities on 6 allotments within Forest Plan standards and guidelines to improve ecological status of rangeland vegetation under P.L. 104-19 (1995 Rescission Act). | |||||
| Location: UNIT - Weiser Ranger District. STATE - Idaho. COUNTY - Washington. LEGAL - T16N, R5 & 6W and T17N R4W. Heath Dukes, Cherry Gulch on/off, Campgrade on/off, Board Creek on/off, Hungry on/off Cattle Horse allotments, and the Limestone Sheep & Goat Allotment. | |||||
|
East Pine Creek Trail Improvement Project [10] CE |
- Recreation management |
In Progress: Scoping Start 12/10/2009 |
Expected:06/2011 |
07/2011 |
Brant Petersen 208-392-6681 bpetersen02@fs.fed.us |
| Description: Reconstruction of 8.4 miles of the East Pine Creek Trail #263. A trail bridge would also be constructed at a current ford on East Pine Creek on Trail #245, the Boundary Trail.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31337 |
|||||
| Location: UNIT - Weiser Ranger District. STATE - Idaho. COUNTY - Washington. LEGAL - T16N R3W Sections 6, 7, 18; T16N R4W Sections 24, 25; T17N R3W Sections 30, 31. Weiser Ranger District, Washington County Idaho. | |||||
|
Midvale Telephone Exchange, Inc. underground telephone line. CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:06/2011 | 06/2011 |
Denise Cobb 208-634-0446 dfcobb@fs.fed.us |
| Description: Renewal of a special use authorization to continue operation and maintenance of an underground copper cable telephone line on the Weiser Ranger District. | |||||
| Location: UNIT - Weiser Ranger District. STATE - Idaho. COUNTY - Washington. LEGAL - T 13N, R 5W, section 4 to T 14N, R 5W, section 33 (1.3 miles); T 13N, R 5W, section 4 to T 14N, R 6W, section 11 (10.5 miles) and T 14N, R 6W, section 11 (1.3 miles). The line is located along or runs parallel to: Forest Rd #009 (Mann Creek Rd), Forest Rd #025 (Adams Creek Rd), and Forest Rd #010 (Ridge Rd). | |||||
|
Surdam Multiple Use Trail Construction CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2011 |
Expected:05/2011 | 06/2011 |
Stephen Penny 208-253-0164 spenny@fs.fed.us |
| Description: Trails 275 and 275A would be connected to form a loop. This would accommodate ATVs, motorcycles and non-motorized users. 3.4 miles of trail would be constructed, 1.1 miles of trail is an existing trail bed, 2.3 miles would be new construction.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35705 |
|||||
| Location: UNIT - Weiser Ranger District. STATE - Idaho. COUNTY - Washington. LEGAL - T15N R4 W Sections 30 & 31 and T15N R5W Sections 25, 26, 35, & 36. 10 miles west of Cambridge, Idaho. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||