Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) - R4 - Intermountain Region, Manti-Lasal National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R4 - Intermountain Region, Manti-Lasal National Forest, Ferron/Price Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Manti-Lasal National Forest, Moab/Monticello Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Manti-Lasal National Forest, Sanpete Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 12/18/2009 Est. DEIS NOA in Federal Register 12/2010 |
Expected:11/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS *NEW LISTING* |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 01/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Greens Hollow Coal Lease Tract EIS |
- Minerals and Geology |
In Progress: DEIS NOA in Federal Register 02/12/2008 Est. FEIS NOA in Federal Register 03/2011 |
Expected:05/2011 |
07/2011 |
Thomas Lloyd 1-435-636-3596 twlloyd@fs.fed.us |
| Description: Ark Land Comapny has appled for a coal lease on non-leased Federal coal lands adjacent to their existing SUFCO underground Mining Operation. BLM assigned case # UTU 84102 to the LBA. BLM and FS are analying the effects of the proposed leasing.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25561 |
|||||
| Location: UNIT - Richfield Ranger District, Ferron Ranger District. STATE - Utah. COUNTY - Sevier. LEGAL - Section 34, 33, T14S, R1E and Section 4, T15 S, R1E, SLB&M. Approximately 10.5 miles east of the town of Emery Utah and approximately 5 miles north of the SUFCO Mine portal. | |||||
| Back To Top | |||||
Manti-Lasal National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Permit Renewal Natural Resources Conservation Service (NRCS) Snotel and Snow Course Sites CE |
- Special use management |
In Progress: Scoping Start 10/06/2009 |
Expected:10/2010 |
10/2010 |
Nathan Lewis 435-636-3515 ndlewis@fs.fed.us |
| Description: Reissue Snotel and Snow Course permit for sites on all the Ranger Districts on the Manti-La Sal National Forest (Ferron/Price, Moab/Monticello and Sanpete Ranger Districts). The facilities authorized would include those currently on the sites.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30546 |
|||||
| Location: UNIT - Manti-Lasal National Forest All Units. STATE - Utah. COUNTY - Carbon, Emery, Grand, Juab, San Juan, Sanpete, Utah. LEGAL - Manti-La Sal N.F. There are sites on all the Ranger Districts on the Manti-La Sal National Forest (Ferron/Price, Moab/Monticello and Sanpete Ranger Districts). | |||||
| Back To Top | |||||
Manti-Lasal National Forest, Ferron/Price Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Buzzard Bench 2D Seismic NOI CE |
- Minerals and Geology | Completed | Actual: 09/30/2010 | 10/2010 |
Thomas Lloyd 1-435-636-3596 twlloyd@fs.fed.us |
| Description: XTO Energy proposes to the conduct sesimic operations on North Horn Mountain
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28419 |
|||||
| Location: UNIT - Ferron Ranger District. STATE - Utah. COUNTY - Emery. LEGAL - T18S, R7E Sections 28 and 29. North Horn Mountain, approximately 4.5 miles west of Orangeville, Utah. | |||||
|
Castle Valley Ridge Grazing Reauthorization EA |
- Grazing management |
Developing Proposal Est. Scoping Start 11/2010 |
Expected:03/2011 | 06/2011 |
John Healy 435-636-3585 jhealy@fs.fed.us |
| Description: Evaluation of existing and desired condition for livestock grazing management.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31547 |
|||||
| Location: UNIT - Price Ranger District. STATE - Utah. COUNTY - Carbon. 20 miles west of Price, UTah. | |||||
|
Fish Creek NRT Bridge CE |
- Recreation management |
In Progress: 215 Comment Period Legal Notice 02/15/2008 |
Expected:03/2008 |
09/2008 |
Michael Davis 435-636-3550 michaeldavis@fs.fed.us |
| Description: Construction of a new bridge across Fish Creek and 3/4 mile of new non-motorized trail construction. All work taking place west of Scofield Reservoir.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=24705 |
|||||
| Location: UNIT - Price Ranger District. STATE - Utah. COUNTY - Carbon. LEGAL - T12S, R6E, Sections 13 and 14. About two miles west of Scofield Reservoir in Carbon County, Utah. | |||||
|
Grazing Reauthorization Genty Mountain C&H Allotment EA |
- Grazing management | Completed | Actual: 09/30/2010 | 05/2011 |
John Healy 435-636-3585 jhealy@fs.fed.us |
| Description: Evaluate reissuance of Term Grazing Permits on the allotment
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28398 |
|||||
| Location: UNIT - Price Ranger District. STATE - Utah. COUNTY - Emery. LEGAL - 8 miles north east of Huntingtion , Utah. Gentry Mountain. | |||||
|
Millers Flat Project EA |
- Recreation management - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management - Road management |
Completed | Actual: 08/03/2010 | 11/2010 |
Diane Cote (435) 636-3320 dcote@fs.fed.us |
| Description: The Millers Flat Project proposed to harvest timber and perform fuels reduction treatments on 480 acres.
Closed approximately 16.8 miles of routes.
Identify 44 recreation sites for management, close 4 sites.
Restore or protect 35 acres of wetlands
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30254 |
|||||
| Location: UNIT - Ferron Ranger District. STATE - Utah. COUNTY - Emery, Sanpete. LEGAL - The Millers Flat Project is located in T. 15 S., R. 6 E., Sections 3 thru 10, 15 thru 22, and 27 thru 33. The Millers Flat Project on the Ferron Ranger District of the Manti-LaSal NF. | |||||
|
Pondtown Creek Abandoned Mine Reclamation Project EA |
- Watershed management - Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 03/09/2010 |
Expected:07/2010 |
08/2010 |
Karl Boyer 435-636-3551 kboyer@fs.fed.us |
| Description: Reclamation of the Pondtown Creek abandoned coal mine through removal of coal waste and concrete, recontouring, and revegetation to approximate pre-mining conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31393 |
|||||
| Location: UNIT - Price Ranger District. STATE - Utah. COUNTY - Carbon. LEGAL - T. 12 S. R 6 E., S1/2 SE1/4, Section 2. Carbon County, Utah. The project site is located 2.7 miles west of Scofield Reservoir and 1.5 miles west of the Forest Service boundary on FR 009. | |||||
|
Reeder Road Paving Project EA |
- Road management | Completed | Actual: 07/28/2010 | 07/2010 |
Nathan Lewis 435-636-3515 ndlewis@fs.fed.us |
| Description: Proposal from Emery County to pave Reeder Road which is under easement to the County. The Forest would also have to issue a new easement to cover the new road alignment.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25946 |
|||||
| Location: UNIT - Ferron Ranger District. STATE - Utah. COUNTY - Emery. LEGAL - T17S R6E Sec 30, 29, 19, 20. Forest Road #50014 begins at State Route 29 in Joes Valley and runs north for apprx. 1 mile to the Reeder View Subdivision. | |||||
| Back To Top | |||||
Manti-Lasal National Forest, Moab/Monticello Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
BBC Pine Ridge Drilling #2 & #3 CE |
- Minerals and Geology |
In Progress: Scoping Start 11/05/2009 |
Expected:09/2010 |
10/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: Bill Barrett Corp proposes to drill two gas wells on their existing lease.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29982 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - Sections 22 and 23, T28S, R25E, SLBM. Approximately 2 miles north of the town of Old La Sal. | |||||
|
Brushy Basin Big Game Habitat Improvement Project CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 12/22/2009 |
Expected:08/2010 |
10/2010 |
Barb Smith 435-259-7155 bsmith06@fs.fed.us |
| Description: Mechanical and hand-treatment of pinyon/juniper in previously-chained areas to improve forage production for big game and to reduce the continuity of vegetative fuels and associated fire hazard in an area near Blanding.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31355 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - Within T35S, R22E, sections 6,7,8,9,10,14, 15, 16,17, 18 and T35S, R21E, sections 1, 12, 13 (SL Meridian). approximately 8 miles north of Blanding, Utah. | |||||
|
Bulldog OHV Trailhead CE |
- Recreation management | On Hold | N/A | N/A |
Brian Murdock 435-636-3367 bmurdock@fs.fed.us |
| Description: San Juan County and local OHV groups have proposed to construct a OHV trail head and parking area in the vicinty of Bulldog Canyon
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=21678 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T 35 S. R 23 E. Sec 17. Monticello RD, Bulldog Canyon. | |||||
|
Bureau of Reclamation Seismic Stations CE |
- Special use management |
In Progress: Scoping Start 03/31/2010 |
Expected:09/2010 |
10/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: The BOR proposed to install 2 seismic stations to monitor earthquakes.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32616 |
|||||
| Location: UNIT - Moab Ranger District, Monticello Ranger District. STATE - Colorado. COUNTY - Montrose. Carpenter Ridge area of Colorado - exact locations restricted due to sensitive nature of equipment. | |||||
|
Camp Jackson Motorized Trail Project EA *NEW LISTING* |
- Recreation management | Completed | Actual: 07/06/2010 | 08/2010 |
Brian Murdock 435-636-3367 bmurdock@fs.fed.us |
| Description: Changing the deisgnation of the existing Camp Jackson Motorized Trail from "Open to Two-Wheeled Vehicles" to "Open to Vehicles 50" or Less"
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33283 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T 34 S., R 22 E., Secs. 23, 26, 27, 35, 36. Located on the Monticello portion of the District approximatley 8 miles southwest of the town of Monticello Utah. | |||||
|
Carroll Access Road CE |
- Special use management |
Developing Proposal Est. Scoping Start 09/2010 |
Expected:10/2010 | 10/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: Landowner needs access into private inholding.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32617 |
|||||
| Location: UNIT - Moab Ranger District, Monticello Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T26S R24E Sec. 30. Near Mesa Guard Station just west of Loop Road on Moab Ranger District. | |||||
|
Grazing Reauthorization Babylon C&H Allotment EA |
- Grazing management |
Developing Proposal Est. Scoping Start 04/2010 |
Expected:09/2010 | 06/2011 |
Tina Ward 435-636-3368 tinaward@fs.fed.us |
| Description: Evaluate reissuance of Term Grazing Permits on the Allotment
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31578 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. South Elk Rdige. | |||||
|
Grazing Reauthorization Brumley Ridge C&H Allotment EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 03/05/2009 |
Expected:09/2010 |
06/2011 |
Tina Ward 435-636-3368 tinaward@fs.fed.us |
| Description: To authorize grazing on the Brumley Ridge allotment with a five unit, deferred rotation management system with a season of use from 6/06 to 10/19 for 300 head of cattle using an adaptive management strategy. Update the Allotment Mangement Plan.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31575 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. The allotment encompasses approximately 16,000 acres of National Forest System lands located about 16 miles southeast of Moab, UT. It is situated on the east slopes of the La Sal Mountains. | |||||
|
Grazing Reauthorization Gooseberry C&H Allotment EA |
- Grazing management |
Developing Proposal Est. Scoping Start 04/2010 |
Expected:09/2010 | 06/2011 |
Tina Ward 435-636-3368 tinaward@fs.fed.us |
| Description: Evaulte the reissuance of Term Grazing Permits for the allotment area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31580 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. North Elk Ridge. | |||||
|
Johnson Creek Hazard Fuel Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
Completed | Actual: 09/27/2010 | 08/2011 |
Greg Montgomery 435-636-3348 gmontgomery@fs.fed.us |
| Description: Reduce hazard fuels and associated risk to forest resources, life, and property by mechanical thinning (logging, bullhog, and chainsaw) and prescribed burn (about 1800 acres). Blanding City municipal watershed & Boy Scout Camp permit area.
Web Link: http://www.fs.fed.us/r4/mantilasal/projects/projects_moabmonticello/projectsmoabmonticello_proposed.shtml |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T34S, R22E and T35S, R22E, SLM. 7 miles from Blanding, UT municipal watershed surrounding Dry Wash Reservoir & Nizhoni Campground; Johnson Creek drainage. | |||||
|
Leach Access Road CE |
- Special use management |
Developing Proposal Est. Scoping Start 10/2010 |
Expected:11/2010 | 11/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: The Forest will be analyzing an existing access road to a private inholding.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29979 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - Section 35, T25S, R24E, SLBM. Willow Basin in the La Sals. | |||||
|
Marcy Claims Exploration CE |
- Minerals and Geology |
In Progress: Scoping Start 05/10/2010 |
Expected:10/2010 |
10/2010 |
Dale Harber 435-636-3548 dharber@fs.fed.us |
| Description: Utah Energy Corporation proposes to drill 76 uranium exploration holes to a depth of 250-350 feet in the Elk Ridge area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32621 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T34S R19E Section 36. Elk Ridge area of the Monticello Ranger District. | |||||
|
Moab Ditch Bill Easement - Beaver Creek CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26379 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T25S, R24E, Section 21. Adobe Mesa. | |||||
|
Moab Ditch Bill Easement - La Sal Creek CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26381 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T28S, R24E, Section 25. Two air miles NE of the City of La Sal. | |||||
|
Moab Ditch Bill Easement - Mason Draw & Springs CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26378 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T26S, R24E Sections 17, 21. Mason Draw. | |||||
|
Moab Ditch Bill Easement - Mill Creek CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26382 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T26S, R24E, Section 29. Southwest of Warner Recreation Site. | |||||
|
Moab Ditch Bill Easements - Horse Gulch CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26370 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T26S, R24E, Section 32. Near Mill Creek Canyon Overlook. | |||||
|
Moab Ditch Bill Easements - Two Mile Creek CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=26376 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T28S, R25E, Section 3. Boundary of State and National Forest Land. | |||||
|
Moab Ditch Bill Easements - Upper La Sal Creek CE |
- Land ownership management |
In Progress: Scoping Start 09/24/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T28S, R25E, Section 7. La Sal Creek, North of Doe Creek. | |||||
|
Monticello Ditch Bill Easement - North Creek CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T33S, R23E, Section 28. Near NF land Forest Boundary off of FS Rd 129. | |||||
|
Monticello Ditch Bill Easement - North Montezuma Creek CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation and stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T33S, R23E, Section 29. About 1/2 mile N of Dalton Spring and the trailhead of the Trail Canyon Trail. | |||||
|
Monticello Ditch Bill Easement - S FK of N Montezuma Cr CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T34S, R23E, Section 17. Junction of FS Rd 087 and FS Rd 357 about 1/4 mi S Gold Queen Basin. | |||||
|
Monticello Ditch Bill Easement - Verdure Creek CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance. | |||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T34S, R23E, Section 27. About 1 and 1/2 mile E of Blue Mtn Ranch off Verdure Creek. | |||||
|
Monticello Ditch Bill Easement - Harts Draw CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditions. | |||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T33S, R22E, Sections 14 and 23. Near Harts Draw Canyonland. | |||||
|
Monticello Ditch Bill Easement - SE Fk Indian Cr, Dry Wash Resv, Johnson Cr CE |
- Land ownership management |
In Progress: Scoping Start 06/02/2008 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operating and maintenance conditons.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25321 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T34S, R22E, Sections 8 and 30; T35S, R22E, Section 16. Near Aspen Flat Trail head; Dry Wash Resv 2 mi S of Cliff Dwellings; Johnson Cr off FS Rd 401. | |||||
|
Reissue Special Use Permits for Moab/Monticello Ranger Districts CE |
- Special use management |
In Progress: Scoping Start 06/21/2010 |
Expected:10/2010 |
10/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: Permits will expire this year and permittees have or intend to submit an application for reissuance.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32615 |
|||||
| Location: UNIT - Moab Ranger District, Monticello Ranger District. STATE - Utah. COUNTY - Grand, San Juan. Approximately six permits spread through the Moab/Monticello Ranger District. | |||||
|
Utah Energy Uranium Exploration - Blue Jay Project CE |
- Minerals and Geology |
In Progress: Scoping Start 06/23/2010 |
Expected:10/2010 |
10/2010 |
Dale Harber 435-636-3548 dharber@fs.fed.us |
| Description: Utah Energy Corporation proposes to drill 64 exploration holes to a depth of 250-350 feet in the previously explored area near Woodenshoe.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32620 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - T36S R18E Section 15. Southern Elk Ridge portion of the Monticello Ranger District. | |||||
|
Utah Energy Uranium Exploration - Marcy Look Project CE |
- Minerals and Geology |
In Progress: Scoping Start 05/12/2010 |
Expected:10/2010 |
10/2010 |
Dale Harber 435-636-3548 dharber@fs.fed.us |
| Description: The Manti-La Sal National Forest, Moab/Monticello Ranger District, proposes to authorize Utah Energy Corporation to drill up to 76 exploration holes in their Marcy Look project area. The area is located on unpatented mining claims on Elk Ridge.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32659 |
|||||
| Location: UNIT - Monticello Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - Unpatented mining claims located within Sec. 31, T34S, R20E. Marcy Look Project - south of Duck Lake on Elk Ridge. | |||||
|
Valley View Mine Reclamation Project CE *NEW LISTING* |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 06/19/2009 |
Expected:03/2011 |
07/2011 |
Karl Boyer 435-636-3551 kboyer@fs.fed.us |
| Description: Reclamation would be accomplished by removal of surface structures, closure of adits and shafts, removal of debris, recontouring, and revegetation. Heavy equipment required would be a backhoe, front end loader, bulldozer, and dump truck. | |||||
| Location: UNIT - Moab Ranger District. STATE - Colorado. COUNTY - Montrose. LEGAL - Montrose County, Colorado, T 48 N, R 19 W, S2NE4 Section 7, NMPM. Montrose County, Colorado, T 48 N, R 19 W, S2NE4 Section 7, NMPM. Access to the site is by taking FDR 0378 to FDR 4134. | |||||
|
Verizon Wireless Building and Tower on Bald Mesa CE |
- Special use management |
Developing Proposal Est. Scoping Start 09/2010 |
Expected:10/2010 | 10/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: Verizon Wireless proposes to build a new tower and building with associated equipment on Bald Mesa Communications Site.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32618 |
|||||
| Location: UNIT - Moab Ranger District, Monticello Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T26S R24E Section 19. Bald Mesa Communications Site located on the Moab Ranger District. | |||||
|
Vision Mine Reclamation Project CE |
- Land management planning |
In Progress: 215 Comment Period Legal Notice 06/18/2009 |
Expected:07/2011 |
08/2011 |
Karl Boyer 435-636-3551 kboyer@fs.fed.us |
| Description: Close and reclaim an abandoned uranium mine.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28942 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand, San Juan. LEGAL - T 27 N, R 23 E, Section 35, NE 1/4, SLBM. Located approximately 15 miles SE of Moab. | |||||
|
Williams Spring Development CE |
- Special use management |
Developing Proposal Est. Scoping Start 09/2010 |
Expected:10/2010 | 11/2010 |
Joel Nowak 435-636-3364 joelnowak@fs.fed.us |
| Description: The Forest will be analyzing a proposed spring development for culinary water near Geyser Pass.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29978 |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - San Juan. LEGAL - Section 6, T27S, R25E SLBM. Approximately 1 mile east of Geyser Pass and 1 mile south of Mt. Tomasaki in the La Sals. | |||||
|
Willow Basin Wildland-Urban Interface Fuels Treatment Project EA |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Objection Period Legal Notice 06/18/2009 |
Expected:06/2010 |
07/2010 |
Greg Montgomery 435-636-3348 gmontgomery@fs.fed.us |
| Description: Mechanical (ground-based fecon head machinery and chainsaw) thinning with prescribed burning within the Willow Basin Wildland-Urban Interface area adjacent to private lands. Gambel oak, PJ and ponderosa pine. 1000 acres of 1725 acre project area.
Web Link: http://www.fs.fed.us/r4/mantilasal/projects/ |
|||||
| Location: UNIT - Moab Ranger District. STATE - Utah. COUNTY - Grand. LEGAL - T25S, R24E and T25S, R25E, SLM. NW corner of the Moab Ranger District adjacent to the north boundary of the Willow Basin private inholding. | |||||
| Back To Top | |||||
Manti-Lasal National Forest, Sanpete Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Grazing Reauthorization Lake Fork C&H Allotment EA |
- Grazing management | Completed | Actual: 09/30/2010 | 05/2011 |
Karlton Moss 435-636-3304 kmoss@fs.fed.us |
| Description: Evaluate reissuance of Term Grazing Permits on the Allotment
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28435 |
|||||
| Location: UNIT - Sanpete Ranger District. STATE - Utah. COUNTY - Utah. LEGAL - 2 miles east of Thistle. Lake Fork. | |||||
|
Mayfield Town Reservoir Dam Temporary Access Road CE |
- Special use management - Road management |
Completed | Actual: 05/13/2010 | 06/2010 |
Nathan Lewis 435-636-3515 ndlewis@fs.fed.us |
| Description: Mayfield Irrigation Company is planning maintenance work on the Town Reservoir Dam and need to construct a temporary access road down to the dam to complete the work.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=32194 |
|||||
| Location: UNIT - Sanpete Ranger District. STATE - Utah. COUNTY - Sanpete. LEGAL - Section 20, T19S, R3E. The project is located on the Sanpete Ranger District in Sanpete County approximately six miles east of Mayfield, Utah in Twelvemile Canyon. | |||||
|
Sanpete Ranger District Ditch Bill Easement CE |
- Land ownership management |
In Progress: Scoping Start 11/13/2006 |
Expected:12/2010 |
12/2010 |
Jerry Bird 801-236-3463 jkbird@fs.fed.us |
| Description: Approve application for irrigation & stockwatering easement including operation and maintenance conditions. | |||||
| Location: UNIT - Sanpete Ranger District. STATE - Utah. COUNTY - Sanpete. LEGAL - T15S R6E Section 6. 3 miles west of Millers Flat Reservoir. | |||||
|
Skyline Tractor Salvage CE |
- Vegetation management (other than forest products) |
In Progress: Scoping Start 05/02/2010 |
Expected:10/2010 |
11/2010 |
Michael Scottorn 435-636-3327 mscottorn@fs.fed.us |
| Description: Salvage dead Engelmann spruce on 205 acres to remove all merchantable Engelmann spruce 10 inches Diameter at Breast Height (DBH) and greater, with the exception of wildlife snags, using ground-based systems and aerial (cable) systems.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31487 |
|||||
| Location: UNIT - Sanpete Ranger District. STATE - Utah. COUNTY - Sanpete. LEGAL - Township 19 South, Range 4 East, Sections 15, 16, 28, 29 and Township 20 South, Range 4 East, Sections 4, 5, 8, and 9. Skyline Tractor Salvage Project area is located 12 miles east of Mayfield, Utah. | |||||
|
Sunroc Plan of Operation, Chicken Creek Surface Gypsum Mine EIS |
- Minerals and Geology |
In Progress: DEIS NOA in Federal Register 08/01/2008 Est. FEIS NOA in Federal Register 05/2011 |
Expected:06/2011 |
08/2011 |
Karl Boyer 435-636-3551 kboyer@fs.fed.us |
| Description: Sunroc has submitted a Plan of Operation for the Chicken Creek on their locatable mining claims. The Forest Service must evaluate the plan and decide whether or not additional mitigations are needed to protect non-mineral resources.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25520 |
|||||
| Location: UNIT - Sanpete Ranger District. STATE - Utah. COUNTY - Juab. LEGAL - Section 34, 33, T14S, R1E and Section 4, T15 S, R1E, SLB&M. Approximately 2 miles East of Levan, Utah. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||