Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) - R4 - Intermountain Region, Dixie National Forest, Occurring in more than one District (excluding Forestwide) - R4 - Intermountain Region, Dixie National Forest, Cedar City Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Dixie National Forest, Escalante Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Dixie National Forest, Pine Valley Ranger District (excluding Projects occurring in more than one District) - R4 - Intermountain Region, Dixie National Forest, Powell Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 10/2012 |
Expected:10/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders | Completed | Actual: 03/23/2012 | 08/2012 |
Brenda Halter-Glenn 202-260-9400 bhalterglenn@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
| Back To Top | |||||
R4 - Intermountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Additional Geotechnical Investigations for Sigurd to Red Butte 345kV Transmission Line Project CE |
- Special use management | Completed | Actual: 07/11/2011 | 09/2011 |
Jenna Jorgensen 435-865-3730 ckcall@fs.fed.us |
| Description: Analysis for proposed action of issuing spacial use permit to Rocky Mountain Power to conduct geotechnocal investigations (borehole drilling) at 14 sites located along the Sigurd to Red Butte 345kV Transmission Line corridor. | |||||
| Location: UNIT - Pine Valley Ranger District, Fillmore Ranger District. STATE - Utah. COUNTY - Millard, Washington. Starting near Sigurd, UT and running southwest to the Red Butte Substation near Central, UT. | |||||
|
Greater Sage-grouse Management Direction EIS |
- Land management planning - Wildlife, Fish, Rare plants |
In Progress: NOI in Federal Register 12/09/2011 Est. DEIS NOA in Federal Register 04/2013 |
Expected:08/2014 |
09/2015 |
Glen Stein 801-625-5281 gstein@fs.fed.us |
| Description: The purpose of this project is to prepare environmental impact statements (EISs) and supplemental environmental impact statements to incorporate greater sage-grouse conservation measures into Bureau of Land Management land use plans and Forest Plans.
Web Link: http://www.blm.gov/wo/st/en/prog/more/sagegrouse/western.html |
|||||
| Location: UNIT - Ashley National Forest All Units, Dixie National Forest All Units, Fishlake National Forest All Units, Manti-Lasal National Forest All Units, Uinta-Wasatch-Cache All Units. STATE - Utah. COUNTY - Beaver, Box Elder, Cache, Carbon, Daggett, Davis, Duchesne, Emery, Garfield, Grand, Iron, Juab, Kane, Millard, Morgan, Piute, Rich, Salt Lake, San Juan, Sanpete, Sevier, Summit, Tooele, Uintah, Utah, Wasatch, Washington, Wayne, Weber. All National Forests in Utah. | |||||
|
Incorporating Greater Sage-grouse Conservation Measures into Land Management Plans (Utah) EIS |
- Land management planning - Wildlife, Fish, Rare plants |
Developing Proposal Est. Notice of Adjustment 12/2011 |
Expected:05/2014 | 06/2014 |
Clinton McCarthy 801-625-5671 cmccarthy01@fs.fed.us |
| Description: The Forest Service will be a cooperating agency with the BLM (lead agency) in preparing programmatic EISs to incorporate greater sage-grouse conservation measures into several land management plans (Uinta, Dixie, Fishlake) through plan amendments.
Web Link: http://www.blm.gov/wo/st/en/prog/more/sagegrouse/western.html |
|||||
| Location: UNIT - Dixie National Forest All Units, Fishlake National Forest All Units, Pleasant Grove Ranger District, Heber-Kamas Ranger District, Spanish Fork Ranger District. STATE - Utah. COUNTY - Beaver, Garfield, Iron, Juab, Kane, Millard, Piute, Sanpete, Sevier, Tooele, Utah, Wasatch, Washington, Wayne. UNIT - Dixie NF, Fishlake NF, Uinta portion of Uinta-Wasatch-Cache NF; UT; multiple counties involved. | |||||
|
Sigurd to Red Butte 345 kV Transmission Line EIS |
- Special use management |
In Progress: DEIS NOA in Federal Register 06/03/2011 Est. FEIS NOA in Federal Register 08/2012 |
Expected:10/2012 |
12/2012 |
Charles Call 435-865-3730 ckcall@fs.fed.us |
| Description: Construct a new 345 kV transmission line connecting the Sigurd substation located near Richfield, UT to the Red Butte substation located near Central, UT.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=30538 |
|||||
| Location: UNIT - Pine Valley Ranger District, Beaver Ranger District, Fillmore Ranger District. STATE - Utah. COUNTY - Beaver, Iron, Millard, Sevier, Washington. Linear alignment from approximately 6 miles northeast of Richfield, UT to just southwest of the town of Central, UT. | |||||
| Back To Top | |||||
Dixie National Forest, Occurring in more than one District (excluding Forestwide) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Existing Special Use Permit Issuances CE |
- Special use management |
In Progress: Scoping Start 02/25/2011 |
Expected:07/2011 |
09/2011 |
Dave Swank 435-865-3224 dswank@fs.fed.us |
| Description: Special Use permit renewal for various permits with expiring terms:Mountain Meadow Massacre Site; Seismograph Stations; Big Mtn Communications Site; Special Services Dist Fire Station; Power Line; Town Water System; Resort; Archery Range. | |||||
| Location: UNIT - Pine Valley Ranger District, Cedar City Ranger District. STATE - Utah. COUNTY - Garfield, Iron, Kane, Washington. LEGAL - T38S, R16W; T38S, R18W; T39S, R16W; T38S, R13W; T37S, R7W; T37S, R9W. Various locations on Pine Valley Ranger Distict (5) and Cedar City Ranger District (2). | |||||
|
Outfitter and Guide Special Use Permit Issuance CE |
- Special use management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:10/2012 | 11/2012 |
Cindy Calbaum 435-826-5425 ccalbaum@fs.fed.us |
| Description: Reissue priority permits and issue new permits for outfitting and guiding. | |||||
| Location: UNIT - Cedar City Ranger District, Escalante Ranger District, Powell Ranger District. STATE - Utah. COUNTY - Garfield, Iron. Escalante, Powell and Cedar city Ranger Districts. | |||||
| Back To Top | |||||
Dixie National Forest, Cedar City Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Brian Head ATV Trail EA |
- Recreation management | Cancelled | N/A | N/A |
Steven Robinson 435-865-3241 stevenrobinson@fs.fed.us |
| Description: Development of an ATV trail linking the community of Brian Head to the Markagunt ATV Trail System. The Brian Head ATV Trail will consist of 4 miles of new trail construction and approximately 4.6 mile of existing forest roads.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27771 |
|||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Iron. LEGAL - T 36 S, R 9 W, Secs 11-14; T 36 S, R 8 W, Secs 19, 27, 29, 30, 32, 33. Southeast of Brian Head, Utah. | |||||
|
Cedar Mountain Mineral Source Sites EA |
- Minerals and Geology | Cancelled | N/A | N/A |
Dave Swank 435-865-3224 dswank@fs.fed.us |
| Description: Analysis of 12 existing mineral source sites to evaluate safety issues and determine future needs. | |||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Garfield, Iron, Kane. LEGAL - Various sites centered around T37S R7W. Cedar Mountain area approximately 25 miles east of Cedar City, UT. | |||||
|
Harris Flat ATV Access Trail EA |
- Recreation management |
In Progress: Scoping Start 07/01/2010 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:01/2013 |
05/2013 |
Steve Robinson 530-627-3291 steverobinson@fs.fed.us |
| Description: Construction of 0.4 mile of ATV trail on existing utility route. New route will provide access from private lands to National Forest roads and trails.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27768 |
|||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Kane. LEGAL - T38S R7W Sec 24. Approximately 6 miles east of Duck Creek Village, Utah. | |||||
|
Highway 14/148 Danger Tree Removal CE |
- Forest products - Vegetation management (other than forest products) |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:03/2013 | 06/2013 |
Patrick Moore 435-865-3221 ptmoore@fs.fed.us |
| Description: Removal of danger trees along State Highways 14 and 148. Contract to be administered by Utah Department of Transportation. | |||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Iron, Kane. LEGAL - Along Highway 14 in T37N, R9W; T37N, R8W; T38N, R8W; T38N, R7W. Along Highway 14 from approximately 10-40 miles east of Cedar City, Utah. | |||||
|
Little Creek-Red Creek Vegetation Treatment EA |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
On Hold | N/A | N/A |
Dave Swank 435-865-3224 dswank@fs.fed.us |
| Description: Vegetation treatments on 9281 acres to improve vigor in a variety of species. Mechanical treatments and prescribed fire will be used to reduce forest fuels, regenerate aspen and sagebrush, thin conifer timber and reduce pinyon-juniper invasion. | |||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Iron. LEGAL - T33S, R7W. T34S, R7W. Approximately 9 miles east of Parowan, Utah. | |||||
|
Navajo Basin Forest and Scenic Recovery EA |
- Forest products | Completed | Actual: 03/21/2012 | 06/2012 |
Dave Swank 435-865-3224 dswank@fs.fed.us |
| Description: Salvage harvest of 3,800 acres of dead and dying Douglas-fir and other conifer. Regeneration of 177 acres of aspen. Conifer reforestation of approximately 760 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27773 |
|||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Kane. LEGAL - T38S R8W Sec 3-10,15-18; T38S R8S Sec 1-3, 11,12,13,14. Approximately 25 east of Cedar City, UT. | |||||
|
Red Desert-Tippets Vegetation Treatment EA |
- Forest products - Vegetation management (other than forest products) - Fuels management |
Cancelled | N/A | N/A |
Dave Swank 435-865-3224 dswank@fs.fed.us |
| Description: Conifer salvage harvest 1,354 acres, mechanical aspen regeneration 691 acres, prescribe burn mixed conifer and aspen 3,889 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33883 |
|||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Iron. LEGAL - T36S, R8W,Sec 35,36. T37S, R8W, Sec 1-3,10-16,21-23, 26-28, 33-35. T38S, R8W, Sec 3,4. Approximately 26 miles east of Cedar City, UT. | |||||
|
Reed Valley Vegetation Treatment EA *NEW LISTING* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Watershed management - Road management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:12/2012 | 05/2013 |
Nathan Yorgason 435-865-3227 nyorgason@fs.fed.us |
| Description: Conifer salvage harvest 1,428 acres, precommercial conifer thinning 1,404 acres, aspen regen and improvement 759 acres, permanent road relocation 1.03 miles. | |||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Iron. LEGAL - T36S, R8W, Sec 35,36; T37S,R8W, Sec 1-3,10-16,21-23. Approximately 26 miles east of Cedar City, UT. | |||||
|
Sawyer Point Vegetation Treatment EA *NEW LISTING* |
- Wildlife, Fish, Rare plants - Fuels management |
Developing Proposal Est. Scoping Start 06/2012 |
Expected:03/2013 | 07/2013 |
Eric Eastep 435-865-3278 eeastep@fs.fed.us |
| Description: Vegetation treatments to improve habitat and veg conditions. | |||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Garfield, Kane. LEGAL - T37S, R6W, Sec 31-34; T38S, R6W, Sec 3-6. Approximately 6 miles northeast of Duck Creek Village, UT. | |||||
|
Strawberry Ridge Utility Improvements Project EA |
- Special use management |
In Progress: 215 Comment Period Legal Notice 06/11/2012 |
Expected:12/2012 |
03/2013 |
Pamela Gilbert 435-865-3200 pjgilbert@fs.fed.us |
| Description: Construction of 350,000 gallon culinary water tank and associated pipeline for adjacent subdivision.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37385 |
|||||
| Location: UNIT - Cedar City Ranger District. STATE - Utah. COUNTY - Kane. LEGAL - T39S, R8W, Salt Lake PM. Approximately 6 miles south of Duck Creek Village, Utah. | |||||
| Back To Top | |||||
Dixie National Forest, Escalante Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Birch Creek Riparian Improvement Project CE *NEW LISTING* |
- Land management planning |
In Progress: 215 Comment Period Legal Notice 05/24/2012 |
Expected:09/2012 |
10/2012 |
Brooke Shakespeare 435-826-5434 bshakespeare@fs.fed.us |
| Description: The project will treat vegetation within riparian areas in the Birch Creek sub-watershed by removing pinyon, juniper, and, as needed, other conifer species. The project also includes placement and operation of a bat watering trough.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39363 |
|||||
| Location: UNIT - Escalante Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - 34S 1W, sec. 24, 25, 13; 34S 1E, sec. 46, 48, 47; 35S 1E, sec. 06, 07, 17, 08. The Birch Creek 6th Field sub-watershed is located in the headwaters of the Escalante River Watershed, and is locally known as Main Canyon. The Dixie National Forest boundary in Main Canyon is approx. | |||||
|
Iron Springs Vegetation Improvement and Salvage Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 05/02/2012 | 07/2012 |
Kevin Zeman 435-826-5401 kzeman@fs.fed.us |
| Description: Commercial and non-commercial thinning to reduce stand densities, provide for a more balance age-class distribution, and perpetuate aspen presences within the spruce/fir dominated forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31526 |
|||||
| Location: UNIT - Escalante Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - T33S, R1W and T33S, R1E, of the Salt Lake Baseline Meridian. On the Aquarius Plateau, approximately 15 miles northwest of Escalante, UT along FR 30140. | |||||
|
Re-Issuance of existing permit for new term. CE *NEW LISTING* |
- Special use management | Completed | Actual: 09/27/2011 | 09/2012 |
Leslie Fonger 435-676-9360 lesliefonger@fs.fed.us |
| Description: Escalante Ranger District: Pine Lake Dam and Reservoir. | |||||
| Location: UNIT - Escalante Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - Pine Lake Dam and Reservoir: T35S, R2W, Secs. 24 and 25. Water transmission pipeline: T35S, R2W, Sec. 24 and T35S, R1W, Sec. 19. Pine Lake Reservoir is located approximately 16 miles north of the Highway 12 and Highway 63 (the road to Bryce Canyon National Park) junction. | |||||
|
Upper Valley Vegetation Improvement Project EA |
- Grazing management - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: 215 Comment Period Legal Notice 12/16/2011 |
Expected:11/2012 |
09/2012 |
Chance Stewart 435-826-5475 chancestewart@fs.fed.us |
| Description: The project would use prescribed fire and mechanical and hand vegetation treatments to reduce wildfire hazard and improve forest health. It would also stabilize and restore streams and provide guzzlers for wildlife.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37898 |
|||||
| Location: UNIT - Escalante Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - Parts of Townships 35 and 36 South, Ranges 1 West and 1 East of the Salt Lake Base and Meridian. The proposed 16,478-acre Upper Valley Vegetation Improvement Project project is located in Garfield County, Utah (UT) approximately 15 miles southwest of Escalante, UT. Access is via Utah Hiway 12. | |||||
| Back To Top | |||||
Dixie National Forest, Pine Valley Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Enterprise Culinary Pipeline Replacement CE *NEW LISTING* |
- Special use management |
In Progress: 215 Comment Period Legal Notice 06/12/2012 |
Expected:08/2012 |
12/2012 |
Pamela Gilbert 435-865-3200 pjgilbert@fs.fed.us |
| Description: Construction of 4,400' of six-inch diameter culinary pipeline generally within disturbed area of existing road. Existing six-inch pipeline will be abandoned.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39101 |
|||||
| Location: UNIT - Pine Valley Ranger District. STATE - Utah. COUNTY - Washington. LEGAL - T37S, R18W, Sec 36; T38S, R18W, Sec 1. Approximately 3 miles south of Enterprise, Ut. | |||||
|
Pine Valley Fuelbreak Improvement Project EA |
- Fuels management |
In Progress: Scoping Start 05/03/2012 Est. Objection Period Legal Notice 08/2012 |
Expected:09/2012 |
10/2012 |
Joseph Harris 435-865-4637 jrharris@fs.fed.us |
| Description: Improvement of existing fuelbreaks around communities of Central, Pine Valley and New Harmony, UT. Activities include removal of invading woody speies (primarily juniper),widening, seeding and construction of 12-18" fireline.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37387 |
|||||
| Location: UNIT - Pine Valley Ranger District. STATE - Utah. COUNTY - Washington. LEGAL - T38S, R13W; T39S, R15W, T39S, R16W. Areas surrounding the communities of Central, Pine Valley and New Harmony, UT. | |||||
| Back To Top | |||||
Dixie National Forest, Powell Ranger District (excluding Projects occurring in more than one District) |
R4 - Intermountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Blue Fly Vegetation Management Project CE |
- Vegetation management (other than forest products) |
In Progress: 215 Comment Period Legal Notice 07/27/2011 |
Expected:07/2012 |
10/2012 |
Keith Gustafson 435-676-9354 keithgustafson@fs.fed.us |
| Description: The Powell Ranger District of the Dixie National Forest proposes a vegetation management project on the Paunsaugunt Plateau in southern Utah. (see additional information below under 'Other Project Information'.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36894 |
|||||
| Location: UNIT - Powell Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - The legal description for the analysis area includes all or parts of Township (T) 36S., Range (R) 4W., Sections 28, 29, 30, 31, 32, 33; T. 36S., R 4.5W., Sec. 25, 35, 36; T 37S., R 4W., Sec. 5, 6, 7,. The Blue Fly Vegetation Management (VMP) analysis area totals 9,275 acres and is located within the Powell Ranger District of the Dixie National Forest in Garfield County, Utah. | |||||
|
Johns Valley Vegetation Project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Watershed management |
In Progress: 215 Comment Period Legal Notice 05/02/2011 |
Expected:11/2012 |
03/2013 |
Jake Schoppe 435-676-9341 jschoppe@fs.fed.us |
| Description: The Dixie National Forest proposes to remove Pinyon and Juniper (PJ) from sage-steppe and riparian areas within Johns Valley to benefit wildlife and improve the environmental health of the area. A variety of treatments would be utilized.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35980 |
|||||
| Location: UNIT - Powell Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - T 33 S, R 3 W, Sec. 10-14, 22-27, 34-36; T 33 S, R 2 W, Sec. 17-20, 29-32; T 34 S, R 3 W, Sec. 1-4, 9-12, 15-17, 19-22, 27-34; T 34 S, R 4 W, Sec. 1-2, 12; T 34 S, R 4 W, Sec. 26, 35-36. Within the E.F. Sevier River Subbasin at the southeast end of the Sevier Plateau. Immediately west of SR 22 (Johns Valley Road) approximately 10 miles north of its intersection with SR 12. | |||||
|
Lookout Point Mine CE |
- Minerals and Geology | Completed | Actual: 12/08/2011 | 05/2012 |
Joseph Rechsteiner 801-676-9320 jrechsteiner@fs.fed.us |
| Description: This exploration project would allow Lookout Point Mining Company to acquire information about the characteristics and marketability of mineral deposits on a site previously used for mineral extraction. Lookout Point has valid claims on this site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36876 |
|||||
| Location: UNIT - Powell Ranger District. STATE - Utah. COUNTY - Garfield. LEGAL - T36S R4, 5W, section 4. 5 miles northeast of Hatch, Utah, off of FS road 31147. | |||||
|
Paunsaugunt Vegetation Management EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) |
Completed |
Actual: 05/22/2012 05/22/2012 |
09/2012 |
Keith Gustafson 435-676-9354 keithgustafson@fs.fed.us |
| Description: The Powell Ranger District proposes a project on the Paunsaugunt Plateau to perform the following vegetation treatments: commercially harvest 866 acres of mixed conifer forest, regenerate 413 acres of aspen, reforest 194 acres of wildfire impacted...
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26423 |
|||||
| Location: UNIT - Powell Ranger District. STATE - Utah. COUNTY - Garfield, Kane. LEGAL - T 38 S, R 4 W, T 39 S, R 5 W, T38 S, R 41/2 W, T 39 S, R 4 1/2 W, and T 39 S, R 4 W multiple sections. Paunsaugunt Plateau south of Tropic Resevoir near juction of Upper Kanab Creek and East Fork Sevier River. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||