Schedule of Proposed Actions (SOPA) |
|||||
| This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. | |||||
|
Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R3 - Southwestern Region, Occurring in more than one Forest (excluding Regionwide) - R3 - Southwestern Region, Tonto National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R3 - Southwestern Region, Tonto National Forest, Occurring in more than one District (excluding Forestwide) - R3 - Southwestern Region, Tonto National Forest, Cave Creek Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Tonto National Forest, Globe Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Tonto National Forest, Mesa Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Tonto National Forest, Payson Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Tonto National Forest, Pleasant Valley Ranger District (excluding Projects occurring in more than one District) - R3 - Southwestern Region, Tonto National Forest, Tonto Basin Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 10/2012 |
Expected:10/2012 |
01/2013 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders | Completed | Actual: 03/23/2012 | 08/2012 |
Brenda Halter-Glenn 202-260-9400 bhalterglenn@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
| Back To Top | |||||
R3 - Southwestern Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
APS Sycamore 69kV Powerline Permit Reissuance CE |
- Special use management | On Hold | N/A | N/A |
Tamarya Pike 480-595-3370 tpike@fs.fed.us |
| Description: Update and re-authorize Arizona Public Service 69-kV power transmission line across approximately 17 miles of NFS lands | |||||
| Location: UNIT - Verde Ranger District, Cave Creek Ranger District. STATE - Arizona. COUNTY - Yavapai. East of I-17 from Dugas south to Black Canyon City. | |||||
|
CAMP TATIYEE LAND EXCHANGE - 0100 EIS |
- Land acquisition |
In Progress: NOI in Federal Register 03/25/2010 Est. DEIS NOA in Federal Register 12/2012 |
Expected:03/2013 |
06/2013 |
Randall Chavez 928-368-2100 rchavez02@fs.fed.us |
| Description: Exchange of private parcels in the A-S, Coronado, Prescott, & Tonto NFs for Federal lands in Pinetop-Lakeside (T9N, R22E). Would provide land for children's camps currently under spec. use permit & result in consolid. of isolated parcels on Forests.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=5004 |
|||||
| Location: UNIT - Bradshaw Ranger District, Lakeside Ranger District, Mesa Ranger District, Sierra Vista Ranger District. STATE - Arizona. COUNTY - Navajo. LEGAL - T9N, R22E, sec.16, G&SRBM. Along State Highway SR260 within existing Pinetop-Lakeside town limits. | |||||
|
Fossil Creek Wild and Scenic River Comprehensive River Management Plan EA |
- Regulations, Directives, Orders |
In Progress: Scoping Start 03/29/2011 Est. 215 Comment Period Legal Notice 03/2012 |
Expected:08/2012 |
04/2013 |
Elizabeth Dykstra 928-527-3419 edykstra@fs.fed.us |
| Description: Creation of a Comprehensive River Management Plan for Fossil Creek as described in the Wild and Scenic Rivers Act. The project is on both the Coconino National Forest and the Tonto National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27457 |
|||||
| Location: UNIT - Payson Ranger District, Red Rock Ranger District. STATE - Arizona. COUNTY - Gila, Yavapai. Fossil Creek (Wild and Scenic River Portions) - Red Rock District of the Coconino National Forest and Payson Ranger District of the Tonto National Forest. | |||||
|
Prescott-Poland-Childs P-25-0 APS 69kV Sub-transmission Line Permit Reissue CE *NEW LISTING* |
- Special use management | Completed | Actual: 06/06/2012 | 06/2012 |
Sheila Sandusky 928-214-2455 ssandusky@fs.fed.us |
| Description: The Prescott National Forest is proposing to re-issue a 50-year permit for Arizona Public Service to continue operation and maintenance of their 69kV sub-transmission line that runs between Prescott, Poland Junction, and Childs, Arizona.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39419 |
|||||
| Location: UNIT - Verde Ranger District, Cave Creek Ranger District, Red Rock Ranger District. STATE - Arizona. COUNTY - Yavapai. LEGAL - T11N= R6E, S 11,10,9,8,7; R5E, S 12,11,2,3,4,5,6; R4E, S 1,12,11,10,3,4,5,6; & T12N, R4E, S 31; R3E, S 36,35,26,27,28,20; T11.5N, R1E, S24;. The line runs approximately 23 miles between Prescott, Poland Junction, and Childs, Arizona. | |||||
| Back To Top | |||||
Tonto National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
APS Mt. Ord Underground 12 kV Cable Replacement EA |
- Special use management |
In Progress: Scoping Start 10/05/2009 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:09/2012 |
11/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Replace the underground 12 kV line that spurs off of FR 524 near Reno Pass to the top of Mt. Ord.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=29533 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila. LEGAL - T 6 N, R 9 E, Section 2. North of FR 524 near Mt. Ord. | |||||
|
Canyon, Christopher and Haigler Creeks Aquatic Habitat Enhancements EA |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 12/22/2010 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:08/2012 |
10/2012 |
Robert Calamusso 480-610-3302 rcalamusso@fs.fed.us |
| Description: Enhance aquatic habitat in approximately 5 miles of Canyon Creek, two segments of Haigler Creek totaling 3.5 miles, and two segments of Christopher Creek totally approximately 1.5 miles all of which occur on the USFS Tonto National Forest (TNF).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34189 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila. Approximately 5 miles of Canyon Creek, two segments of Haigler Creek totaling 3.5 miles, and two segments of Christopher Creek totally approximately 1.5 miles. | |||||
|
Development of Trail Management Objectives for National Forest System Trails CE |
- Land management planning - Recreation management |
Developing Proposal Est. Scoping Start 12/2012 |
Expected:01/2013 | 03/2013 |
Gregory Schuster 602-225-5362 gjschuster@fs.fed.us |
| Description: Development of trail management objectives for National Forest System trails on the Tonto National Forest
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36858 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila, Maricopa, Pinal, Yavapai. Tonto National Forest. | |||||
|
Integrated Treatment of Noxious and Invasive Weeds EA |
- Vegetation management (other than forest products) |
In Progress: 215 Comment Period Legal Notice 03/02/2012 |
Expected:09/2012 |
10/2012 |
Patti Fenner (602)225-5386 pfenner@fs.fed.us |
| Description: Eradication, containment, or control of noxious weed and invasive plant species forestwide using an integrated approach. Treatment methods may include cultural, physical, mechanical, biological, or chemical control measures.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=4454 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila, Maricopa, Pinal, Yavapai. Forestwide. | |||||
|
Outfitter-Guide Program Changes EA |
- Land management planning |
Developing Proposal Est. Scoping Start 10/2012 |
Expected:12/2012 | 02/2013 |
Rachel Franchina 970-819-2507 rfranchina@fs.fed.us |
| Description: Issue priority permits to long-term temporary permit holders that have demonstarted acceptable performance. Create a Total Service Day allocation pool and amend the Tonto Land and Resource Managment Plan.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36856 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila, Maricopa, Pinal, Yavapai. Tonto National Forest. | |||||
|
Tonto National Forest Motorized Travel Management EA |
- Recreation management - Road management |
In Progress: 215 Comment Period Legal Notice 01/06/2012 |
Expected:09/2012 |
06/2013 |
Genevieve Johnson 602-225-5213 grjohnson@fs.fed.us |
| Description: The Tonto National Forest is in the process of implementing the Travel Management Rule which calls for establishing a system of roads, trails, and areas designated for motorized vehicle use and determining suitable locations for dispersed camping.
Web Link: http://data.ecosystem-management.org/nepaweb/fs-usda-pop.php?project=28967 |
|||||
| Location: UNIT - Tonto National Forest All Units. STATE - Arizona. COUNTY - Gila, Maricopa, Pinal, Yavapai. Tonto National Forest. | |||||
| Back To Top | |||||
Tonto National Forest, Occurring in more than one District (excluding Forestwide) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
APS – Mt. Ord Power line Rebuild CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:08/2012 | 08/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Replace approximately 2.2 miles of forty year old existing underground 21kV power line serving Mt. Ord communications & lookout sites with new above ground line on poles within existing corridor. Equipment and material delivered and set by helicopter | |||||
| Location: UNIT - Tonto Basin Ranger District, Mesa Ranger District. STATE - Arizona. COUNTY - Gila, Maricopa. LEGAL - Gila & Salt River Meridian. T. 6N., R. 9E., sec. 2, and 11. T.7N., R. 9E., sec. 34. Gila & Salt River Meridian. T. 6N., R. 9E., sec. 2, and 11. T.7N., R. 9E., sec. 34. | |||||
|
Reissue Permit for Arizona Public Service 345kv - Cholla to Pinnacle Peak Powerline CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/25/2012 |
Expected:07/2012 |
07/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: The re-issuance of permit for existing Arizona Public Service 345KV - Cholla to Pinnacle Peak Powerline. To maintain and operate 345kv power transmission line and steel lattice towers within a 315' wide Right-of Way. | |||||
| Location: UNIT - Cave Creek Ranger District, Payson Ranger District, Tonto Basin Ranger District, Mesa Ranger District. STATE - Arizona. COUNTY - Gila, Maricopa. Line runs NE to SW across USFS land from Section 3 T12N, R11E to Section 17 T5N, R6E. Line originates at Cholla Powerplant at Joseph City, AZ to the Pinnacle Peak Substation in North Phoenix. | |||||
|
Salt River Allotments Vegetative Management EIS EIS |
- Grazing management - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: DEIS NOA in Federal Register 06/02/2011 Est. FEIS NOA in Federal Register 08/2012 |
Expected:12/2012 |
01/2013 |
Debbie Cress 928-467-3220 dcress@fs.fed.us |
| Description: The Tonto National Forest will prepare and Environmental Impact Statement (EIS) on a proposal to improve ecological conditions within the project area usig tools such as fire and grazing management and to authorize continued livestock grazing.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36074 |
|||||
| Location: UNIT - Globe Ranger District, Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. Southwestern Region 3, Tonto National Forest, Globe and Tonto Basin ranger districts along the Salt River corridor. | |||||
| Back To Top | |||||
Tonto National Forest, Cave Creek Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Bartlett Flats Toilet CE |
- Recreation management |
Developing Proposal Est. Scoping Start 09/2012 |
Expected:12/2012 | 01/2013 |
Tamarya Pike 480-595-3370 tpike@fs.fed.us |
| Description: A CXT toilet will be replaced at Bartlett Flats 100ft from the existing dirt ramp to replace an aging toilet.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36860 |
|||||
| Location: UNIT - Cave Creek Ranger District. STATE - Arizona. COUNTY - Maricopa. Bartlett Flats. | |||||
|
Ikes Backbone Radio Repeater CE CE |
- Facility management |
In Progress: 215 Comment Period Legal Notice 05/19/2012 |
Expected:07/2012 |
07/2012 |
Gary Daniel 480-595-3351 gdaniel@fs.fed.us |
| Description: Placement of a radio repeater building on the Tonto NF to provide radio communications to field going units in the area of the Verde river canyon, Fossil creek canyon, and Ikes backbone. This project is for the Coconino NF | |||||
| Location: UNIT - Cave Creek Ranger District. STATE - Arizona. COUNTY - Yavapai. T11N R5E S12 SW SW. | |||||
|
Johnson Ranch-Ranch Associated Facilities CE |
- Special use management | On Hold | N/A | N/A |
Kelly Jardine (480) 595-3370 kjardine@fs.fed.us |
| Description: Update and reauthorize a special use permit for existing buildings, fences, concrete lined pond/pool and drilled wells. | |||||
| Location: UNIT - Cave Creek Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - Township 7, Range 6, Section 11 & 12. Southeast of Horseshoe Dam. | |||||
|
Lower Camp Creek Road Maintenance CE |
- Special use management | On Hold | N/A | N/A |
Tamarya Pike 480-595-3370 tpike@fs.fed.us |
| Description: Update and reauthorize an existing special use permit for 1.1 mile of road 24F (lower Camp Creek Road). Special use permit authorizes road and gate maintenance. This road provides access to 18 recreation residences. | |||||
| Location: UNIT - Cave Creek Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - Township 7, Range 5, Section 35 and Township 6, Range 5, Section 2. Lower Camp Creek Road 24F. | |||||
|
Seven Springs Water Conveyance Improvements EA |
- Special use management | On Hold | N/A | N/A |
Tamarya Pike 480-595-3370 tpike@fs.fed.us |
| Description: Authorize existing improvements to collect and convey claimed water across National Forest System Lands from Seven Springs to the Cartwright Ranch Property. | |||||
| Location: UNIT - Cave Creek Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - T.7N., R.5E., Sec. 9, G&SRBM. 11 miles North of Tonto Hills. | |||||
| Back To Top | |||||
Tonto National Forest, Globe Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Activities Connected to the Pinto Valley Mine EA |
- Minerals and Geology |
In Progress: 215 Comment Period Legal Notice 08/27/2010 |
Expected:08/2013 |
09/2013 |
Celeste Kinsey 602-225-5248 ckinsey@fs.fed.us |
| Description: The proposed action is a consolidated authorization to extend previously authorized and/or ongoing activities and uses on National Forest System lands, and limited expansion of existing surface uses for ancillary operations.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33272 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T1N, R13E, S 1, 2, 14, 23, 24, & 25. T1N, R14E, S 20, 21, 28, 29, 30, 31, & 32. T1S, R14E, S 4 & 5. T2N, R13E, S 21, 22, 23, 26, 27, 28, 34, & 35. The Pinto Valley Mine is located approximately three miles north of US Highway 60 on Pinto Valley Road (Forest Road 287), and approximately six miles west of Miami, Gila County, Arizona. | |||||
|
Arizona Water Company Water Well and Transmission Line CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/25/2012 |
Expected:07/2012 |
07/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Reissue Special Use Permit for maintaining and using an existing water well registered to Arizona Water Company and associated water transmission line.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=26791 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T2N,R15E,SE1/4NW1/4, Sec. 33, G&SRBM and T2N,R15E,W1/2, Sec.33, SE1/4, Sec.32, G&SRBM. N on FR188 to Nugget Wash, NE on FR594, transmission line begins at forest boundary, extends to junction of FR2619 where well is located. | |||||
|
Capitan, Coolidge/Parker and Ranger Station Allotment Management Plans EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 08/30/2007 |
Expected:09/2012 |
11/2012 |
Ernest Gipson 928-402-6200 egipson@fs.fed.us |
| Description: Update management direction for the three grazing allotments
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=1362 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. South of Globe. | |||||
|
Carol Spring Prescribed Fire EA |
- Fuels management |
In Progress: 215 Comment Period Legal Notice 01/14/2009 |
Expected:08/2012 |
10/2012 |
Quentin Johnson 928-402-6200 qjohnson@fs.fed.us |
| Description: Treat approximately 8000 acres on Carol Spring Mountain.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27523 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T4N, R17E. Carol Spring Mountain, east of Highway 60. | |||||
|
City of Globe Police Department Target Range EA |
- Special use management |
In Progress: 215 Comment Period Legal Notice 12/10/2008 |
Expected:07/2012 |
07/2012 |
Christopher LaCosse 928-462-4332 clacosse@fs.fed.us |
| Description: Update and re-authorize target range
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=1358 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T.1 S., R. 16 E., Section 9, G&SRBM. East of Globe. | |||||
|
Copper Springs CE *NEW LISTING* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 10/2012 |
Expected:01/2013 | 02/2013 |
Lee Ann Atkinson 928-402-6281 leeannatkinson@fs.fed.us |
| Description: Copper Springs exploration drilling project near Globe, AZ. Four drill sites accessed from existing roads. | |||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - Township 1 South, Range 15 East, Sections 3, 4, 5 8, 9 10 and 17. Project located south of Globe, AZ near Russel Gulch area. | |||||
|
Globe Ranger District Recreation Residence Consistency Review and continuation Determination CE |
- Special use management |
In Progress: Scoping Start 11/24/2009 Est. 215 Comment Period Legal Notice 06/2012 |
Expected:07/2012 |
07/2012 |
Christopher LaCosse 928-462-4332 clacosse@fs.fed.us |
| Description: Consistency Review to determine if Globe recreation residence tract is consistent with the 1985 Tonto Forest Plan as amendended.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=23776 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. Top of Pinal Mountains. | |||||
|
Horseshoe Bend Wilderness Boundary Gate Project CE |
- Special area management | Completed | Actual: 05/26/2011 | 01/2012 |
Donald Sullivan 928-402-6236 drsullivan@fs.fed.us |
| Description: Delineate Salt River Canyon Wilderness boundary on Forest Road 219 at Horseshoe Bend by replacinga gate and adding about 20 feet of pipe rail barrier near the beginning of private land at the end of Forest Road 219 and pruning/removing vegetation.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35557 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T3N, R15E Section 2. Approximately eight miles east of the Highway 288 Salt River Bridge. | |||||
|
Iron Nugget CE *NEW LISTING* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:09/2012 | 11/2012 |
Lee Ann Atkinson 928-402-6281 leeannatkinson@fs.fed.us |
| Description: Exploration drilling from seven drill sites, makes use of existing roads | |||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - Township 2 North, Range 15 1/2 East, Sections 14, 15, 22 and 23. Located approximately 8 miles north of Globe, AZ; access routes Forest Roads 224 and 3111, near Nugget Mountain. | |||||
|
Magnetotelluric Geophysical Survey CE |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:09/2012 | 10/2012 |
Lee Ann Atkinson 928-402-6281 leeannatkinson@fs.fed.us |
| Description: Resolution Copper Mining, LLC proposes to conduct a magnetotelluric geophysical investigation east of Superior, AZ. Sites along survey grid would be accessed from existing roads and by foot travel.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36679 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Pinal. LEGAL - T1S, R12E, Sections 34 and 36; T1S, R13E, Sections 2, 3, 10, 11, 15-17, 20-23, 25-29, and 31-35; T2S, R12E, 1, 3, 11 and 12; T2S, R13E, Sections 6 and 7. east of Superior, AZ. | |||||
|
Material Source 7525, Defiance Stockpile Site CE |
- Minerals and Geology - Special use management |
In Progress: Scoping Start 04/15/2009 |
Expected:08/2011 |
09/2011 |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reissuance of Special Use Permit (updated to Mineral Contract For Sale), allowing ADOT continued use of this roadway maintenance material stockpile site. | |||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - n/a. Within town limits of Superior, AZ; accessed from FR 257, which intersects SR 77 at approximately MP 166. | |||||
|
Permit Reissue - Arizona Water Company Magma Signal Line CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/25/2012 |
Expected:07/2012 |
07/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Reissue a permit to maintain & operate an existing telephone/telegraph line (Magma Signal Line). Originally authorized in 1969 (Magma Arizona Railroad). Purpose of line is to monitor & control of water pumps.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37413 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Pinal. LEGAL - NW1/4, Sec. 4, T.2S, R.12E to SW1/4, Sec. 6, T.2S, R.11E., G.S.R.B. & M. NW1/4, Sec. 4, T.2S, R.12E to SW1/4, Sec. 6, T.2S, R.11E., G.S.R.B. & M. | |||||
|
Permit Reissue - Arizona Water Company Town of Superior water transmission line CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/25/2012 |
Expected:07/2012 |
07/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Reissue permit to maintain and operate a 12 inch diameter water transmission main from private wells to the Town of Superior within a 10 foot wide by 9.53 mile long ROW. To include 2" spur service line. This waterline has been authorized since 1969.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37440 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Pinal. LEGAL - Sec. 32, 33, 34, 35 in T.1S., R.11E. and Sec. 1, 2, 3, 6 in T.2S., R311E., and Sec. 4, 5, 6 in T.2S., R.12E., G.S.R.B.&M., Pinal Count, AZ. Sec. 32, 33, 34, 35 in T.1S., R.11E. and Sec. 1, 2, 3, 6 in T.2S., R311E., and Sec. 4, 5, 6 in T.2S., R.12E., G.S.R.B.&M., Pinal Count, AZ. | |||||
|
Pinaladera WUI Fuels Management EA |
- Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 10/27/2004 |
Expected:03/2013 |
10/2013 |
Quentin Johnson 928-402-6200 qjohnson@fs.fed.us |
| Description: Fuels reduction on approximately 83,558 acres south of Globe. Area includes the Pinal Mountain Recreation Area.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=3775 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T. 1-2 S., R. 13-16 E., GSRM. Pinal Mountains south of Globe and east of Devil's Canyon. | |||||
|
Reissue - AT&T Carol Spring Communication Site CE |
- Special use management | Completed |
Actual: 10/21/2011 10/21/2011 |
10/2011 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: Per existing permittee Alltel's request. Revoke existing authorization & reissue communication site authorization to new equipment owner AT&T (New Cingular Wireless).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37420 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - SW1/4 Sec. 27, T.4N, R.17E., G.S.R.B.&M., Gila County, AZ. Carol Spring Communication Site. | |||||
|
Reissue Permit - Arizona Water Company - Superior School Site Waterline CE |
- Special use management |
In Progress: 215 Comment Period Legal Notice 05/25/2012 |
Expected:07/2012 |
07/2012 |
Mark McEntarffer 602-225-5239 mmcentarffer@fs.fed.us |
| Description: The reissuance of an expired permit to maintain and operate an existing 8” ductile iron water transmission line within a 20 foot by 10 foot corridor (.005 acres). This waterline serves the Superior Public School site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37395 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Pinal. LEGAL - SW ¼ Sec. 3 T.2S., R.12E., G.S.R.B & M, Pinal County, AZ. O’Donnell Dr. & Sunset Dr. in Superior, AZ. | |||||
|
Superior Wildlife Water Catchments CE |
- Wildlife, Fish, Rare plants |
Developing Proposal Est. Scoping Start 03/2013 |
Expected:06/2013 | 08/2013 |
Craig Woods 928-402-6260 clwoods@fs.fed.us |
| Description: Reconstruct two 1960s wildlife water catchments in Sonoran Desert
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=35136 |
|||||
| Location: UNIT - Globe Ranger District. STATE - Arizona. COUNTY - Pinal. LEGAL - N33d 18.003',W111d 08.290' and N33d 13.553', W111d 03.939'. One mile north and 5 miles east of the town of Superior, Arizona. | |||||
| Back To Top | |||||
Tonto National Forest, Mesa Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Goldfield Cellular Site EA |
- Special use management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:12/2012 | 01/2013 |
Daniel Bray 480-610-3339 debray@fs.fed.us |
| Description: Construction of Cellular facility adjacent to the Goldfield administrative site on the Lower Salt River. A relay facility will be constructed on Stewart Mountain and equipment added to existing facility at Saguaro Lake Marina.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37394 |
|||||
| Location: UNIT - Mesa Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - GSRM T.3.N R.7.E Sec. 34. Adjacent to Goldfield Administrative Site, Stewart Mountain near existing passive reflector. | |||||
|
Material Source 8400, Sunflower/O'Neil Stockpile Site CE |
- Minerals and Geology - Special use management |
Completed | Actual: 02/16/2011 | 02/2011 |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reissuance of Special Use Permit to allow Ariz. Dept. of Transportation continued use of roadway maintenance material stockpile site. An expansion of the site requested but request was denied.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28774 |
|||||
| Location: UNIT - Mesa Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - n/a. 33 miles south of Payson, AZ; accessed via FR 1705 which intersects SR 87 at MP 217. | |||||
|
Material Source 8763, Fish Creek Borrow Site Spec Use Permit reissue (updated to Min Sale Contr) CE |
- Minerals and Geology - Special use management |
In Progress: Scoping Start 04/15/2009 |
Expected:05/2011 |
06/2011 |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reissuance of Special Use Permit for ADOT to continue use of roadway maintenance material pit on Tonto NF. | |||||
| Location: UNIT - Mesa Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - n/a. 12 miles east of Tortilla Flat, AZ; accessed via SR88 (Apache Trail) at MP 227. | |||||
|
Saguaro Lake Fish Habitat Enhancement Project CE *NEW LISTING* |
- Recreation management - Wildlife, Fish, Rare plants |
In Progress: 215 Comment Period Legal Notice 05/11/2012 |
Expected:06/2012 |
06/2012 |
Kelly Kessler 480.610.3305 kmkessler@fs.fed.us |
| Description: The Arizona Game and Fish Department and its partners propose to place fish habitat structures in Saguaro Lake over the next 10 years. The plan includes the use reef ball structures to attract and assist in creating a better fishery.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38029 |
|||||
| Location: UNIT - Mesa Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - T3N R8E Sections 26, 27, 28, 34, and 35. Various lakebed locations including; near fishing piers (3), Camper, Burro, Homestead, and Hidden Coves, Meadows, Skunks Wash, Blackwell and Premier Bays, and Bagley Shelf. | |||||
|
Sunflower Well Pipeline Project CE |
- Grazing management - Vegetation management (other than forest products) - Watershed management |
In Progress: 215 Comment Period Legal Notice 05/11/2012 |
Expected:06/2012 |
07/2012 |
Kelly Kessler 480.610.3305 kmkessler@fs.fed.us |
| Description: This project will entail the conveyance of water from an existing private well to a new 10,000 underground storage tank. HDPE pipe will carry water from the tank to two new 500 gallon troughs. Project will improve livestock distribution.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37709 |
|||||
| Location: UNIT - Mesa Ranger District. STATE - Arizona. COUNTY - Maricopa. LEGAL - T6N R8E Section 25; T6N R9E Sections 7, 18, 19, 30. Project is located within the Diamond Pasture of the Diamond Allotment. | |||||
| Back To Top | |||||
Tonto National Forest, Payson Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Little Green Valley Complex Allotment Management Plan EA *NEW LISTING* |
- Grazing management |
Developing Proposal Est. Scoping Start 08/2012 |
Expected:09/2013 | 10/2013 |
Debbie Cress 928-467-3220 dcress@fs.fed.us |
| Description: Update Allotment Management Plan for an active grazing allotment. | |||||
| Location: UNIT - Payson Ranger District. STATE - Arizona. COUNTY - Gila. East of SR 87 to Tonto Creek, north and south of SR 260. | |||||
|
Myrtle Wildland Urban Interface EA |
- Fuels management |
In Progress: 215 Comment Period Legal Notice 04/19/2012 |
Expected:08/2012 |
09/2012 |
Larry Hettinger 928-474-7948 lhettinger@fs.fed.us |
| Description: Purpose is to manage hazardous fuels, both live and dead fuels, in order to reduce the potential of catastrophic wildfire. Need is to address the present fuels threat posed to human life, property and natural resources.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28752 |
|||||
| Location: UNIT - Payson Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T12N R11E S 21-22 26-29 31-36, R12E S 28-36, T11 1/2 N R11E S 20-29 31-36, R11 1/2E S 19-20 29-32, T11N R12E S 1-11 15-21 29-32, R11 1/2E S 5-8 17-18, R11E 1-5 10-14. Payson Ranger District. | |||||
|
Payson Administrative Site Sale EA |
- Land ownership management - Facility management |
In Progress: Scoping Start 09/14/2011 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:08/2012 |
09/2012 |
Rebecca Roof 602-225-5257 rroof@fs.fed.us |
| Description: To sell approximately 260 acres of the Payson Administrative Site that is not utilized and is hard to manage, and build new admin facilities. The forest was given authority to sell this site with PL 106-48 - Arizona National Forest Improvement Act.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36893 |
|||||
| Location: UNIT - Payson Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - Section 2, T.10N, R.10E; Section 28, T.11N, R.11E. Payson Administrative Site and Fire Helibase site. | |||||
| Back To Top | |||||
Tonto National Forest, Pleasant Valley Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2012 Upper Trick Tank CE |
- Grazing management - Vegetation management (other than forest products) - Watershed management |
Completed | Actual: 05/29/2012 | 08/2012 |
Sean Brown 928-462-4300 seanbrown@fs.fed.us |
| Description: Trick Tank in Cross Y II Pasture on the Bar X Allotment
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38042 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T10N, R13E, Sec16. East End of Lost Salt II Pasture. | |||||
|
Canyon Creek Stream Crossing CE *NEW LISTING* |
- Wildlife, Fish, Rare plants | Completed | Actual: 05/30/2012 | 06/2012 |
Robert Calamusso 602-225-5229 rcalamusso@fs.fed.us |
| Description: Replace low-water crossing with culvert for fish passage.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39075 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - Low-water crossing on Canyon Creek near Fish Hatchery. T10 ½ N, R14E, Section 21. | |||||
|
Diamond Butte Water Developments EA |
- Wildlife, Fish, Rare plants - Grazing management |
On Hold | N/A | N/A |
Sean Brown 928-462-4300 seanbrown@fs.fed.us |
| Description: Create water developments on the Diamond Butte Allotment to improve livestock distribution and provide water to wildlife. | |||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. Diamond Butte Allotment on the Pleasant Valley Ranger District. | |||||
|
Flying V and Flying H Allotment Management Plans EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 08/10/2010 |
Expected:12/2012 |
02/2013 |
Donna Reed 760-873-2450 dlreed@fs.fed.us |
| Description: Update and reauthorize grazing on two allotments. Analysis will include fire as well.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=30274 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. North, East, and South of Young, AZ. | |||||
|
Haigler Fuels Analysis EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 03/14/2011 Est. 215 Comment Period Legal Notice 06/2013 |
Expected:10/2013 |
02/2014 |
Julia Camp 928-462-4340 jlcamp@fs.fed.us |
| Description: Manage timber and other woody vegetation to help maintain forest health, reduce forest fuels, and improve wildlife habitat and range conditions on approximately 43,435 acres of the Tonto National Forest.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34507 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. Pleasant Valley Ranger District, Management Areas 5D, 5G, and 4F, including areas around Haigler Creek Estates. | |||||
|
Material Source 3043, Squaw Peak Borrow Source CE |
- Minerals and Geology - Special use management |
Completed | Actual: 02/13/2012 | 02/2012 |
Celeste Kinsey 602-225-5248 ckinsey@fs.fed.us |
| Description: Reauthorization of Special Use Permit (updated to Mineral Contract For Sale) for Squaw Peak Borrow Source (road materials) used by Arizona Dept. of Transportation on Pleasant Valley RD of Tonto NF, R-3.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28769 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - n/a. 5 miles south of Young, AZ; accessed from SR 288 at MP 294. | |||||
|
Material Source 3044, Board Tree Saddle Borrow Site CE |
- Minerals and Geology - Special use management |
On Hold | N/A | N/A |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reauthorization of Special Use Permit for ADOT material pit continued useage. | |||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. 7 miles south of Young, Arizona; accessed from SR 288 at MP 294. | |||||
|
Material Source 7225, Connor Canyon Borrow Site - Spec Use Pmt (updated to Mineral Contract for Sale EA |
- Special area management - Minerals and Geology |
On Hold | N/A | N/A |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reissuance of Special Use Permit for ADOT's continued use of this roadway maintenance material pit. | |||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - n/a. 20 miles south of Young, AZ; accessed from SR 288 at MP 280. | |||||
|
Midvale Telephone Permit Renewal and Reissuance CE *NEW LISTING* |
- Special use management |
Developing Proposal Est. Scoping Start 04/2012 |
Expected:05/2012 | 05/2012 |
David Frew 928-462-4330 dfrew@fs.fed.us |
| Description: This reissuance of the special use permit to Midvale Telephone will replace their 20 year SUP issued in 1994. The SUP will incorporate: ammendments, added drop lines, optic fiber to the Pleasant valley Ranger District Compound and the Old Homestead.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37861 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T101/2N to T9N, R13E. Pleasant Valley Ranger District. | |||||
|
PV Northwest Grazing Analysis Area (Formerly Bar X, Marsh Creek Allotments) EA |
- Wildlife, Fish, Rare plants - Grazing management - Vegetation management (other than forest products) - Watershed management |
In Progress: Scoping Start 03/14/2011 Est. 215 Comment Period Legal Notice 06/2013 |
Expected:10/2013 |
02/2014 |
Julia Camp 928-462-4340 jlcamp@fs.fed.us |
| Description: Current authorizations for livestock grazing on five allotments and a segment of the Sheep Driveway have or soon will expire. New management strategy will allow for flexibility to protect resources in response to changing environmental conditions.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=30075 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. North and west of Young Arizona. | |||||
|
Pleasant Valley Misc. Piles CE |
- Recreation management - Fuels management |
Developing Proposal Est. Scoping Start 12/2012 |
Expected:01/2013 | 02/2013 |
Jeremy Human 928-462-4352 jhuman@fs.fed.us |
| Description: Burn slash piles located on Pleasant Valley R.D. that are not located on an administrative site and are not covered by any other NEPA.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37719 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. The Pleasant Valley Ranger District. | |||||
|
Red Lake 2012 Fence Relocation CE |
- Grazing management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:07/2012 | 07/2012 |
Donna Reed 928-462-4300 dlreed@fs.fed.us |
| Description: Reroute roughly 1 mile of standard four strand wire fence to a better location.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38197 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T10N, R14E, Sec 5&8. Northwest poriton of the Red Lake Allotment. | |||||
|
Tanner Wildfire Salvage Sale CE |
- Forest products - Fuels management - Road management |
Developing Proposal Est. Scoping Start 07/2012 |
Expected:09/2012 | 11/2012 |
John Thornburg 928-462-4350 jthornburg@fs.fed.us |
| Description: The Pleasant Valley Ranger District is proposing to provide a commercial salvage sale within the boundary of the Tanner Wildfire (Sept. 2011) and remove 235 acres of dead or dying trees within 250 feet of State Highway 288.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=37716 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T6N R13E Sections 24,25,&36. The sale boundary begins just south of Conner Material Pit and proceeds north on the east and west side of HWY 288 extending out 250 feet from the road center to the junction with FSRD 487. | |||||
|
Vosberg 2012 Juniper Treatment EA |
- Wildlife, Fish, Rare plants - Grazing management - Vegetation management (other than forest products) - Watershed management - Land acquisition |
In Progress: Scoping Start 03/07/2012 Est. 215 Comment Period Legal Notice 05/2012 |
Expected:07/2012 |
07/2012 |
Donna Reed 760-873-2450 dlreed@fs.fed.us |
| Description: Treatment of roughly 870 acres of grassland encroached by juniper trees.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38037 |
|||||
| Location: UNIT - Pleasant Valley Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T 8 N, R 13 E, Sections 2, 3, 11, 12, 13, 14. Portions of Home and South Pastures on the Vosberg Allotment. | |||||
| Back To Top | |||||
Tonto National Forest, Tonto Basin Ranger District (excluding Projects occurring in more than one District) |
R3 - Southwestern Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
AT&T Roosevelt Dam Cellular Tower CE |
- Special use management |
In Progress: Scoping Start 11/15/2010 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:09/2012 |
11/2012 |
Christopher LaCosse 928-462-4332 clacosse@fs.fed.us |
| Description: Issue a new 10 year authorization to New Cingular Wireless PCS, LLC a subsidary of AT&T Mobility LLC to operate and maintaint the existing Roosevelt Dam Cellular Communications Tower on the Tonto Basin Ranger District.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=34279 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T. 4 N., R. 12 E., Section 27. G&SRM. Tonto Basin Ranger District. | |||||
|
Boneyback Allotment Management Plan EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 04/20/2012 |
Expected:09/2012 |
10/2012 |
Debbie Cress 928-467-3220 dcress@fs.fed.us |
| Description: Update management plan for an active grazing allotment
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27693 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. Project area lies east of Punkin Center, Arizona in the Sierra Ancha Mountains, Tonto Basin RD. | |||||
|
Chubb Mountain Pipeline CE *NEW LISTING* |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 05/11/2012 |
Expected:07/2012 |
07/2012 |
Eric Hoskins 928-467-3236 ehoskins@fs.fed.us |
| Description: Pipeline project on the Greenback Allotment
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39140 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T6N, R12E, Sec. 16, 21, 22, 27, 33, 34. Tonto Basin Ranger District, North of Roosevelt Lake. | |||||
|
Cloverleaf Storage Additions CE *NEW LISTING* |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 05/11/2012 |
Expected:06/2012 |
07/2012 |
Eric Hoskins 928-467-3236 ehoskins@fs.fed.us |
| Description: Two storage tanks with mounted solar panels and pumps are proposed to be constructed next to an existing pipeline on the Dutchwoman Allotment. This will convert the existing water system into a solar operated system.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39220 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T5N, R13E, Sec 30. Tonto Basin Ranger District, Dutchwoman Allotment. | |||||
|
Crabtree Wash Recreation Residences Permit Renewal CE |
- Special use management |
In Progress: Scoping Start 05/26/2011 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:09/2012 |
10/2012 |
Christopher LaCosse 928-462-4332 clacosse@fs.fed.us |
| Description: Renewal of permits authorizing five existing recreation residences collectively known as the Crabtree Wash Recreation Residence Tract located on the Tonto Basin Ranger District.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=36080 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - Section 29, Township 3 North, Range 11 East, Gila and Salt River Principle Meridian. The cabins are located off forest road 79B near Apache Lake. | |||||
|
Long Ridge Pasture Fence CE *NEW LISTING* |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 05/11/2012 |
Expected:06/2012 |
07/2012 |
Eric Hoskins 928-467-3236 ehoskins@fs.fed.us |
| Description: Approximately two miles of fence is proposed to be constructed on the Hardt Creek Allotment south of Forest Service Road 417.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39219 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - T9N, R10E, Sec 27, 28, 33, T8N, R10E, Sec 3. Tonto Basin Ranger District, Hardt Creek Allotment. | |||||
|
Material Source 8541, Red Bluff Stockpile Site CE |
- Minerals and Geology - Special use management |
On Hold | N/A | N/A |
Steven Blair 480-610-3302 sblair@fs.fed.us |
| Description: Reissuance of Special Use Permit (updated to Mineral Contract for Sale), to ADOT for use of roadway maintenance material source and stockpile site.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=28773 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. LEGAL - n/a. 22 miles south of Young, AZ; accessed via SR288 at MP 272.5. | |||||
|
Tonto Basin, 7/K, and Walnut Allotment Management Plans EA |
- Grazing management |
In Progress: Scoping Start 05/02/2011 Est. 215 Comment Period Legal Notice 07/2012 |
Expected:09/2012 |
10/2012 |
Debbie Cress 928-467-3220 dcress@fs.fed.us |
| Description: Update managment plans for three active grazing allotments
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27606 |
|||||
| Location: UNIT - Tonto Basin Ranger District. STATE - Arizona. COUNTY - Gila. Project area lies west, east, and south of Punkin Center, Arizona in the Mazatzal and Sierra Ancha Mts., Tonto Basin RD. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||