Report Contents (click to jump to a section) : - Projects Occurring Nationwide - Projects Occurring in more than one Region (excluding Nationwide) - R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) - R2 - Rocky Mountain Region, White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R2 - Rocky Mountain Region, White River National Forest, Occurring in more than one District (excluding Forestwide) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|---|---|---|---|---|---|
|
Gypsy Moth Management in the United States: A Cooperative Approach EIS |
- Vegetation management (other than forest products) |
In Progress: DEIS NOA in Federal Register 09/19/2008 Est. FEIS NOA in Federal Register 09/2011 |
Expected:10/2011 |
10/2011 |
Noel Schneeberger 610-557-4121 nschneeberger@fs.fed.us |
| Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States.
Web Link: http://www.na.fs.fed.us/wv/eis/ |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
|
Land Management Planning Rule EIS |
- Regulations, Directives, Orders |
In Progress: DEIS NOA in Federal Register 02/25/2011 Est. FEIS NOA in Federal Register 11/2011 |
Expected:12/2011 |
12/2011 |
Larry Hayden 202-205-1559 lhayden@fs.fed.us |
| Description: The Department of Agriculture proposes to promulgate a new planning rule, which will set out the process for development, revision, and amendment of National Forest System land management plans.
Web Link: http://www.fs.usda.gov/planningrule |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Agency-wide Rule. | |||||
|
Nationwide Aerial Application of Fire Retardant on National Forest System Lands. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/27/2010 Est. DEIS NOA in Federal Register 05/2011 |
Expected:12/2011 |
01/2012 |
Glen Stein 208-869-5405 gstein@fs.fed.us |
| Description: The Forest Service will prepare a programmatic environmental impact statement for the continued nationwide aerial application of fire retardant on National Forest System lands.
Web Link: http://www.fs.fed.us/fire/retardant/index.html |
|||||
| Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. Nationwide. | |||||
| Back To Top | |||||
Projects Occurring in more than one Region (excluding Nationwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Western Area Power Administration Right-of-Way Maintenance and Reauthorization Project EIS |
- Special use management |
In Progress: NOI in Federal Register 04/08/2010 Est. DEIS NOA in Federal Register 03/2011 |
Expected:11/2011 |
12/2011 |
David Loomis 303-275-5008 dloomis@fs.fed.us |
| Description: Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation. | |||||
| Location: UNIT - Ashley National Forest All Units, Grand Valley Ranger District, Norwood Ranger District, Yampa Ranger District, Hahns Peak/Bears Ears Ranger District, Pine Ridge Ranger District, Sulphur Ranger District, East Zone/Dillon Ranger District, Paonia Ranger District, Boulder Ranger District, West Zone/Sopris Ranger District, Canyon Lakes Ranger District, Salida Ranger District, Gunnison Ranger District, Mancos/Dolores Ranger District. STATE - Colorado, Nebraska, Utah. COUNTY - Chaffee, Delta, Dolores, Eagle, Grand, Gunnison, Jackson, Lake, La Plata, Larimer, Mesa, Montrose, Routt, Saguache, San Juan, Dawes, Daggett, Uintah. Linear transmission lines located in Colorado, Utah, and Nebraska. | |||||
| Back To Top | |||||
R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Blue River Gore Pass Transmission Line CE |
- Special use management | On Hold | N/A | N/A |
Deanna Bartlett 970-887-4122 dkbartlett@fs.fed.us |
| Description: Forest Service proposes to issue special use authorization for an existing transmission line including a vegetation management plan. | |||||
| Location: UNIT - Sulphur Ranger District, East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Grand, Summit. Williams Ridge, on Grand/Summit County Line. | |||||
|
Dakota Bike Tours Temporary O/G Permit CE |
- Special use management |
In Progress: Scoping Start 04/01/2011 |
Expected:07/2011 |
07/2011 |
Jonathan Thompson 970-963-2266 jonthompson@fs.fed.us |
| Description: The proposal is for a guided road bicycle trip with a maximum of 16 clients, two staff & one support vehicle. The trip would start in Dillon, travelling to Minturn, Leadville, Aspen, Glenwood and finishing in Dotsero, July 18 - 23, 2011. | |||||
| Location: UNIT - West Zone/Aspen Ranger District, East Zone/Dillon Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, Leadville Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield, Lake, Pitkin, Summit. Paved roads and trails between Dillon, Minturn, Leadville, Aspen, Glenwood Springs, and Dotsero. | |||||
|
Mount Sopris Rec Riders O/G Permit Proposal CE |
- Special use management |
In Progress: Scoping Start 04/01/2011 |
Expected:08/2011 |
08/2011 |
Jonathan Thompson 970-963-2266 jonthompson@fs.fed.us |
| Description: Authorize Mount Sopris Rec Riders to groom and maintain the Sunlight to Powderhorn Snowmobile Trails on the White River and a few additional miles on the GMUG. | |||||
| Location: UNIT - West Zone/Aspen Ranger District, West Zone/Rifle Ranger District, Paonia Ranger District, West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield, Gunnison, Mesa, Pitkin. Sunlight to Powderhorn Trail System. | |||||
|
Taylor Pass Hut Project EA |
- Recreation management - Special use management |
In Progress: 215 Comment Period Legal Notice 03/26/2009 |
Expected:04/2011 |
07/2011 |
William Jackson 970-642-4439 wfjackson@fs.fed.us |
| Description: A 800 sq. ft., rustic, backcountry, winter use hut is being proposed to be built just south of Taylor Pass on the Gunnison Ranger District. The hut would be similar in scope and scale to the Friends Hut or the Markley Hut on the White River NF.
Web Link: http://www.fs.fed.us/r2/gmug/policy |
|||||
| Location: UNIT - West Zone/Aspen Ranger District, Gunnison Ranger District. STATE - Colorado. COUNTY - Gunnison, Pitkin. LEGAL - T12S, R84W, SW ? of Section 14. Approximately 1.5 miles south of Taylor Pass. | |||||
|
Town of Breckenridge Land Exchange EA *NEW LISTING* |
- Land ownership management |
In Progress: Scoping Start 05/03/2011 Est. 215 Comment Period Legal Notice 10/2011 |
Expected:10/2011 |
12/2011 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
| Description: Proposal for exchange of 407.05 acres of non-federal lands known as the Flattop Mtn & Mitchell Lakes parcels, located in the Mancos-Dolores RD & Columbine RD, San Juan NF & dispose of two Federal parcels located near the Town of Breckenridge, WRNF.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=35974 |
|||||
| Location: UNIT - Columbine Ranger District, East Zone/Dillon Ranger District, Mancos/Dolores Ranger District. STATE - Colorado. COUNTY - Dolores, La Plata, Summit. LEGAL - Claimjumper T6S, R77W, Sec. 30 & 31; T6S, R78W, Sec. 25 & Sec. 36; Cucumber Gulch Wedge T6S, R78W, Sec. 36; Mitchell Lakes T37N, R9W, Sec. 23; Flattop Mtn. T41N, R10W, Sec. 35 & 2. Federal parcels are Claimjumper 36+/- acres in Breckenridge & Cucumber Gulch Wedge 16+/- acres east of CR 3. Non-Fed Parcels include:160 acre Mitchell Lakes parcel & 407 acre Flattop Mtn parcel. | |||||
|
TransRockies Run (Special Event) EA |
- Special use management |
In Progress: Scoping Start 10/15/2010 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:10/2011 |
07/2012 |
Paula Peterson 970-827-5159 pkpeterson@fs.fed.us |
| Description: Proposal for a 6-day trail running stage race from Beaver Creek to Buena Vista. Specific dates will vary annually but will occur in July or August.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34134 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District, Leadville Ranger District, East Zone/Eagle Ranger District, Salida Ranger District. STATE - Colorado. COUNTY - Chaffee, Eagle, Lake. NFS and other lands between Beaver Creek Ski Resort and the Town of Buena Vista. | |||||
| Back To Top | |||||
White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2011 National Speleological Society (NSS) Convention CE |
- Recreation management - Special use management |
Completed | Actual: 05/26/2011 | 07/2011 |
Mike Kenealy 970-945-3207 mkenealy@fs.fed.us |
| Description: NSS has applied for a SUP for this event under an exemption clause & consistent with decontamination procedures described in Regional Order # R2-10-01. Planned activities would occur from July 16-July 24, 2011 & include: Cave & Geology Field Trips.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34472 |
|||||
| Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Pitkin. Various locations at targeted caves on Eagle/Holy Cross at Fulford Cave, on the Flattops near Coffee Pot, in the upper Fryingpan near Lime Park. Geology field trips to Camp Hale. | |||||
|
David Steinmann and Cyndi Mosch Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 12/02/2010 |
Expected:12/2011 |
12/2011 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: Reauthorize the special use permit issued to David Steinmann and Cyndi Mosch for collecting and preserving insects and faunas from caves located on the White River National Forest. | |||||
| Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Mesa, Pitkin, Rio Blanco, Routt, Summit. Forestwide. | |||||
|
WRNF Travel Management Plan EIS |
- Land management planning - Recreation management - Road management |
Completed | Actual: 03/17/2011 | 08/2011 |
Wendy Haskins 970-945-3303 whaskins@fs.fed.us |
| Description: This document seeks to update the travel management on the WRNF.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=1103 |
|||||
| Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. WRNF: Forest-wide. | |||||
|
White River National Forest Oil and Gas Leasing Environmental Impact Statement EIS |
- Land management planning - Minerals and Geology |
In Progress: NOI in Federal Register 06/30/2010 Est. DEIS NOA in Federal Register 08/2011 |
Expected:02/2012 |
04/2012 |
David Francomb 970-945-3293 dfrancomb@fs.fed.us |
| Description: The WRNF Oil & Gas Leasing EIS will revise the existing 1993, Oil & Gas Leasing availability decision for the WRNF. The proposal will make revisions to the availability of certain WRNF lands for lease and to the stipulations on lands available.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29938 |
|||||
| Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. Forest Wide. | |||||
| Back To Top | |||||
White River National Forest, Occurring in more than one District (excluding Forestwide) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
2011 Emergency Relief for Federally Owned (ERFO) Projects CE |
- Road management | Completed | Actual: 04/15/2011 | 07/2011 |
Erica Borum 970-945-3277 eborum@fs.fed.us |
| Description: Due to damage from spring runoff volumes in 2010, the following roads will be repaired under the Federal Highway Administration's ERFO program: Coal Creek Road (591 ft) and East Brush Creek Road (91 ft). | |||||
| Location: UNIT - West Zone/Sopris Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Pitkin. Coal Creek (NFSR 307) at MP 1.4, approx 1.5 mi from Redstone, west of Hwy 133; East Brush Creek (NFSR 415) at MP 2.5, approx 11 mi south of Eagle. | |||||
|
Aspen-Sopris District wildlife habitat improvement project EA |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) |
Completed | Actual: 06/27/2011 | 06/2011 |
Philip Nyland 970-963-2266 pnyland@fs.fed.us |
| Description: Conduct prescribed fire and mechanical treatments in identified blocks of forest, shrubland, and grassland vegetation types to improve wildlife browse and foraging habitat.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30089 |
|||||
| Location: UNIT - West Zone/Aspen Ranger District, West Zone/Rifle Ranger District, West Zone/Sopris Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Pitkin. Glenwood Canyon, Crystal River Valley, S. Thompson Creek, Roaring Fork Valley, Red Table Mtn., and the Fryingpan River Valley. | |||||
|
Eagle Valley Land Exchange EA |
- Land ownership management |
In Progress: Scoping Start 01/21/2011 Est. 215 Comment Period Legal Notice 11/2011 |
Expected:01/2012 |
03/2012 |
Bill Johnson 970-328-5869 bjohnson@fs.fed.us |
| Description: The Eagle Valley Land Exchange is proposed as an assembled land exchange involving the Town of Avon, the CO State Land Board, Eagle Co., the Eagle Valley Land Trust & the USFS. Then non-federal party wants to exchange 1,280 acres for 943 FS acres. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. Various parcels around Avon and Edwards. | |||||
|
Eagle/Holy Cross Ranger District Public Rock Collection EA |
- Minerals and Geology |
In Progress: Scoping Start 03/15/2011 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:10/2011 |
11/2011 |
Olivia Garcia 970-945-3220 ogarcia@fs.fed.us |
| Description: Designate common use areas for public to collect landscape rocks on the two districts | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. Proposed locations include Camp Hale area, No Name Gulch (NFSR 7050), and Hardscrabble Road (NFSR 441). | |||||
|
Lake Creek/Deep Creek Grazing Analysis EA |
- Grazing management |
In Progress: Scoping Start 02/25/2011 Est. 215 Comment Period Legal Notice 12/2011 |
Expected:03/2012 |
06/2012 |
Jessica Pettee 970-827-5163 jcpettee@fs.fed.us |
| Description: The USFS will be analyzing the impacts of livestock grazing on the Lake Creek/Deep Creek allotment. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Garfield. South of Sweetwater Creek and north of Deep Creek. | |||||
|
Sagebrush Enhancement CE |
- Wildlife, Fish, Rare plants - Vegetation management (other than forest products) - Fuels management |
Developing Proposal Est. Scoping Start 07/2011 |
Expected:11/2011 | 05/2012 |
Lara Duran 970-328-5899 laraduran@fs.fed.us |
| Description: 17,000 acres of sagebrush treatments to benefit greater sage-grouse, mule deer, Brewer’s and sage sparrow and reduce fuels by removing juniper, piñon pine, and Douglas-fir manually or mechanically, patch mowing and prescribed fire, seeding, etc. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle, Routt. Six major areas were identified for possible treatment near Ute Trail, Red Dirt Creek, Berry Creek, Muddy Creek, High Trail Gulch, and Cottonwood Mesa. | |||||
| Back To Top | |||||
White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Breckenridge Forest Health and Fuels Project EA |
- Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Objection Period Legal Notice 10/30/2010 |
Expected:07/2011 |
07/2011 |
Brett Crary 970-827-5182 bcrary@fs.fed.us |
| Description: 5,000 acres of proposed treatments for forest health and fuels reduction in the WUI in Breckenridge
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30036 |
|||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Swan Valley, Boreas Pass, and Hoosier Pass areas of Breckenridge. | |||||
|
Breckenridge Ski Resort Peak 6 Development Project EIS |
- Recreation management - Special use management |
In Progress: DEIS NOA in Federal Register 06/10/2011 Est. FEIS NOA in Federal Register 01/2012 |
Expected:01/2012 |
04/2012 |
Joe Foreman 970-262-3443 jgforeman@fs.fed.us |
| Description: Project includes developing new ski terrain and constructing a new lift and associated infrastructure on Peak 6 within the resort's Special Use Permit boundary.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=23387 |
|||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Breckenridge Ski Resort. | |||||
|
Competitive or direct sale/exchange of the Dillon Work Compound Parcel CE *NEW LISTING* |
- Land ownership management |
Developing Proposal Est. Scoping Start 08/2011 |
Expected:01/2012 | 10/2012 |
Randall Parker 970-945-3202 ext 3202 rjparker@fs.fed.us |
| Description: To offer for competitive sale to the public, or direct sale or exchange to a governmental org, an admin. site (Dillon Work Compound) comprising approx. 11 acres. This sale/exchange is being proposed under the authority of the FSFREA of 2005. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - T. 5 S., R. 77 W., Section 8, 6th P.M. Within the boundaries of the Town of Dillon, Colorado. The parcel is located adjacent to County Rd 51, approximately 1.5 miles from Interstate 70 on US-6. | |||||
|
Dillon - Robinson Electric Transmission Line CE |
- Land ownership management - Special use management |
In Progress: Scoping Start 07/01/2009 |
Expected:09/2011 |
09/2011 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
| Description: The project involves reissuance of the special use permit to Xcel Energy/Public Service Company of Colorado for the existing 115 electric power transmission lines from the Dillon Substation to the Climax Mine area. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Sec 30, T5S, R77W; Sec 25, 26, 33, 34 and 35, T5S, R78W: and Sec 4, 5, 8, 17, 18, 19, 20, 29 and 32, T6S, R78W; 6th P.M. Summit County, CO. The project includes approximately 11.48 miles of an existing 115 overhead electric transmission line from the Dillon Substation (east of the Town of Dillon) to the Robinson Substation. | |||||
|
Dillon-Malta 230 kV Electric Transmission Line CE |
- Land ownership management - Special use management |
In Progress: Scoping Start 02/25/2009 |
Expected:09/2011 |
09/2011 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
| Description: Reissuance of special use permit to Xcel Energy for the existing 230kV electric transmission line from Dillon Substation, to the Malta Substation. The permit was originally issued in 1978, reissued in 1983, and expired in 2008. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - NF lands on the WR and Pike/San Isabel National Forests in Townships 5, 6, 7, 8, 9 & 10 South, all in Range 77 West of the 6th PM and in Township 10 South Range 78 West of the 6th PM., CO. The project includes approximately 20 miles of an existing 230kV overhead electric transmission line from the Dillon Substation (near the Summit County Landfill), to the Malta Substation. | |||||
|
Keystone Frontside Improvements EA |
- Special use management |
Developing Proposal Est. Scoping Start 08/2011 |
Expected:09/2012 | 10/2012 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
| Description: Keystone proposes a variety of frontside improvements including snowmaking installations, trail widening and grading, relocation and replacement of the Summit House Restaurant, new mountain bike trails, etc. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Keystone Ski Resort. | |||||
|
Keystone Ski Area Forest Health Project EA |
- Vegetation management (other than forest products) - Fuels management |
In Progress: Objection Period Legal Notice 05/12/2011 |
Expected:07/2011 |
07/2011 |
Cynthia Keller 970-262-3495 cpkeller@fs.fed.us |
| Description: Proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30934 |
|||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Keystone Ski Area. | |||||
|
Lake Hill Work Compound Development Project EA *NEW LISTING* |
- Facility management |
Developing Proposal Est. Scoping Start 08/2011 |
Expected:02/2012 | 10/2012 |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: This project will include design and construction of a work compound including, warehouse, storage buildings, and employee quarters facilities on Forest Service land northwest of Heaton Bay Campground. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - T. 5 S., R. 78 W., Section 24, 6th P.M. Northwest of Dillon Dam Road across from Heaton Bay Campground, in Summit County, Colorado. | |||||
|
Ophir Mountain Forest Health and Fuels Reduction Project EA |
- Recreation management - Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Scoping Start 10/01/2010 Est. Objection Period Legal Notice 08/2011 |
Expected:11/2011 |
06/2012 |
Brett Crary 970-827-5182 bcrary@fs.fed.us |
| Description: Salvage forest products and reduce future fuel accumulations in forested stands affected by mountain pine beetle mortality.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=31598 |
|||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Sections 1-3 and 10-15 located in T6S, R78W, 6th P.M. Ophir Mountain area west of State Highway 9 near Frisco from Miners Creek to North Barton Gulch. | |||||
|
Rec Path Realignment from Copper Mountain Conoco to Highway 91 EA |
- Recreation management - Special use management |
In Progress: Scoping Start 09/17/2010 Est. 215 Comment Period Legal Notice 08/2011 |
Expected:11/2011 |
05/2012 |
Shelly Grail 970-262-3484 sgrail@fs.fed.us |
| Description: Realignment of the recreation path from the Copper Mountain Conoco Station to the Corn Lot/Highway 91 stoplight. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Copper Mountain Conoco Station. | |||||
|
Snowmobile Rental, Ten Year Outfitter/Guide Permit EA EA |
- Special use management | Cancelled | N/A | N/A |
Ken Waugh 970-262-3446 kwaugh@fs.fed.us |
| Description: To analyze and document the effects of a snowmobile rental operation near Breckenridge, CO. The outfitter has applied for a long-term priority Special Use permit. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Dillon Ranger District. | |||||
|
Summer Construction Projects at Arapahoe Basin CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/14/2011 |
Expected:07/2011 |
08/2011 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
| Description: Development of a ski school trail involving the removal of approximately 10 2-4" diameter trees adjacent to the Wrangler Trail | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Arapahoe Basin Ski Area. | |||||
|
Summer Construction Projects at Breckenridge CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/14/2011 |
Expected:08/2011 |
09/2011 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
| Description: Projects include the development of a ski school trail; construction of two hiking trails; realignment of a mountain bike trail; installation of utilities | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Breckenridge Ski Resort. | |||||
|
Summer Construction Projects at Copper Mountain CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/14/2011 |
Expected:07/2011 |
07/2011 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
| Description: Project is for the realignment of an existing mountain bike trail near the base of the American Eagle Lift | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Copper Mountain Ski Resort. | |||||
|
Summer Construction Projects at Keystone Ski Resort CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 06/14/2011 |
Expected:08/2011 |
09/2011 |
Shelly Grail 970-468-5400 sgrail@fs.fed.us |
| Description: Installation of a toilet at the top of Peru for employee use; minimal timber removal to improve the egresses out of North and South Bowls; the re-alignment of 3 existing mtn bike trails; and the development of a family ski area next to Schoolmaster | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. Copper Mountain Ski Resort. | |||||
|
Tenderfoot Mountain Motorcycle Trail System EA EA |
- Recreation management |
Developing Proposal Est. Scoping Start 07/2011 |
Expected:12/2011 | 06/2012 |
Ken Waugh 970-262-3446 kwaugh@fs.fed.us |
| Description: The Dillon Ranger District proposes to establish a 30+ mile motorcycle trail system in the Frey Gulch and Tenderfoot Mountain areas. There would be about 15 miles of new construction and 15 miles of reconstruction of existing trails proposed. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. The project area is east of the town of Dillon, CO and west of the town of Keystone, CO. | |||||
|
Xcel (Public Service Company of Colorado) - Electric Distribution Master Permits CE |
- Land ownership management - Special use management |
In Progress: Scoping Start 03/22/2007 |
Expected:09/2011 |
09/2011 |
Paul Semmer 970-262-3448 psemmer@fs.fed.us |
| Description: The project involves reissuance of the special use permits to Xcel Energy/PSCO for the existing electric distribution power lines in the Upper Blue River, Lower Blue River, Straight Creek/Snake River and Tenmile Creek drainages of the Dillon RD. | |||||
| Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Through out the Dillon Ranger District, including the Upper and Lower Blue River, Snake River/Straight Creek and Tenmile Creek drainages in Summit County, CO. The project includes approx. 73 miles of existing buried and overhead electric distribution lines in the Upper Blue River, Lower Blue River, Straight Creek/Snake River and Tenmile Creek drainages. | |||||
| Back To Top | |||||
White River National Forest, East Zone/Eagle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Competitive or direct sale of four administrative parcels in Eagle CE |
- Land ownership management |
In Progress: Scoping Start 02/26/2008 |
Expected:01/2013 |
04/2013 |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: To offer for competitive sale to the public or direct sale to Eagle County 4 administrative use parcels totalling 8.48 acres and associated improvements located in Eagle, CO under the authority of the FS Facilities Realignment and Enhancement Act | |||||
| Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sec. 5 of T5S, R84W of the 6th P.M., warranty deed recorded Feb. 9, 1950 in Bk 135 on Pg 85 (Parent Parcel); Bk 0114, Pg 0506; Bk 135, Pg 85 (Parent Parcel); recorded Jan. 6, 1967 in Bk 0203, Pg 0047. Within the Township of Eagle. | |||||
|
Gypsum Creek C&H Allotment Grazing Analysis EA |
- Grazing management |
In Progress: 215 Comment Period Legal Notice 02/16/2011 |
Expected:08/2011 |
05/2012 |
Jessica Pettee 970-827-5163 jcpettee@fs.fed.us |
| Description: Proposal to continue grazing authorization for 592 cattle between June 16 and October 16 annually (3,204 AUMs), construct several range improvements to improve livestock distribution and management.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30687 |
|||||
| Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. The allotment is located just south of Eagle, CO. The main access points onto the allotment are via the Valley road in Gypsum, the Hardscrabble road (#413), and the Brush/Gypsum road (#414). | |||||
|
Sweetwater Lake Land Exchange EA *NEW LISTING* |
- Land acquisition |
Developing Proposal Est. Scoping Start 08/2011 |
Expected:03/2012 | 05/2012 |
Bill Johnson 970-328-5869 bjohnson@fs.fed.us |
| Description: SCC Partners Group, LLC, owns the 488 acre Sweetwater Lake property in Garfield County, CO. SCC proposes to convey 4 parcels of non-Federal land to the U.S. totaling approx 155 acres in exchange for 5 parcels of NFS lands totaling approx 114 acres. | |||||
| Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Sections 5, 8, 9, & 16, T. 3 S., R. 87 W., 6th P.M. Approximately 20 miles NE of Glenwood Springs, CO. | |||||
|
Town of Gypsum - LEDE Reservoir Enlargement EA |
- Special use management |
In Progress: Scoping Start 01/31/2011 Est. 215 Comment Period Legal Notice 09/2011 |
Expected:11/2011 |
01/2012 |
Bill Johnson 970-328-5869 bjohnson@fs.fed.us |
| Description: The Town of Gypsum has submitted an application to enlarge L.E.D.E. Reservoir by raising the dam an additional 4 feet. The reservoir is currently under Special Use Permit and this would involve an amendment to the permit. | |||||
| Location: UNIT - East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Section 9, T7S, R84W. South of the Town of Gypsum on Gypsum Creek. | |||||
| Back To Top | |||||
White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Beaver Creek Mountain Improvements EIS |
- Special use management |
In Progress: NOI in Federal Register 12/14/2010 Est. DEIS NOA in Federal Register 09/2011 |
Expected:01/2012 |
04/2012 |
Don Dressler 970-827-5715 drdressler@fs.fed.us |
| Description: Beaver Creek Ski Resort is proposing to add a women's downhill racecourse next to the existing men's course with related snowmaking & safety infrastructure. Finish area reconstruction will include upgrades to Red Tail Camp & race building facilities
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33695 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. Beaver Creek Ski Resort. | |||||
|
Beaver Creek Ski Area Forest Health Project EA |
- Vegetation management (other than forest products) - Fuels management |
In Progress: 215 Comment Period Legal Notice 06/13/2011 |
Expected:08/2011 |
09/2011 |
Cynthia Keller 970-262-3495 cpkeller@fs.fed.us |
| Description: Proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30933 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. Beaver Creek Ski Resort. | |||||
|
Berlaimont Estates, LLC ANILCA Road Easement EIS |
- Special use management | On Hold | N/A | N/A |
Bill Johnson 970-328-6388 bjohnson@fs.fed.us |
| Description: Berlaimont Estates, LLC has proposed construction of a Paved two-lane 26 wide road, along with utilities in the roadbed, to service private property within the White River NF. The owners of the 680-acre inholding plan to develop it into 19 lots. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. Township 4, South, Range 82 West, Sections 28, 29, 32 & 33 north of the town of Edwards, Colorado. | |||||
|
Holy Cross City Abandoned Mine Land Safety Closures CE |
- Regulations, Directives, Orders |
In Progress: Scoping Start 03/21/2011 |
Expected:08/2011 |
06/2012 |
Olivia Garcia 970-945-3220 ogarcia@fs.fed.us |
| Description: Remediation of physical safety hazards (open adits/shafts) to protect the general public in the vicinity of Holy Cross City and Fancy Lake (wilderness). | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T7S, R81W, Section 34. Holy Cross City. | |||||
|
Sale of Minturn Residential Administrative Site EA |
- Land ownership management |
In Progress: 215 Comment Period Legal Notice 01/20/2010 |
Expected:11/2011 |
02/2012 |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: To offer for competitive sale to the public or direct sale or exchange to the township of Minturn 4 admin use parcels totaling 36.65 acres and assoc. improvements located in Minturn, CO, under the authority of the FS FRE Act of 2005 (P.L. 109-54)
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=25143 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T5S, R81W Section 35, 11.147 acres; T5S, R81W Section 36, Lot 17. Within the Township of Minturn. | |||||
|
TMDHA Jackal Hut Lightning Protection CE *NEW LISTING* |
- Recreation management - Special use management |
Developing Proposal Est. Scoping Start 07/2011 |
Expected:08/2011 | 08/2011 |
Mike Kenealy 970-945-3207 mkenealy@fs.fed.us |
| Description: 10th Mountain proposes to install a lightning protection system at the Jackal Hut. Two options are being evaluated: either a free-standing mast or a Franklin rod system. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - SW1/4, Sec 18, T. 7 S., R. 79 W., 6th P.M. About 15 miles north of the city of Leadville, due east of Camp Hale. | |||||
|
Tucker Road Easement CE |
- Special use management | Cancelled | N/A | N/A |
Bill Johnson 970-328-6388 bjohnson@fs.fed.us |
| Description: Robert and Betty Tucker were issued a Special Use Permit for road access to a private inholding in 1985 and expired in 1996 and they have applied to have that access renewed as a private road easement. | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Section 35, T7S, R80W, 6th P.M. North of Camp Hale on Taylor Hill. | |||||
|
Two Elk Fish Barrier EA *NEW LISTING* |
- Wildlife, Fish, Rare plants |
In Progress: Scoping Start 05/24/2010 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:01/2012 |
08/2012 |
Matthew Grove 970-827-5166 magrove@fs.fed.us |
| Description: to construct a permanent fish barrier that would eliminate upstream migration of non-native fish into Two Elk Creek from the Eagle River. The current population of fish would be chemically removed and replaced with native cutthroat trout.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=36187 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sec. 1, T. 6 S., R. 81 W., 6th P.M. Two Elk Creek, southeast of Minturn. | |||||
|
Vail Ski Area Forest Health Project EA |
- Vegetation management (other than forest products) - Fuels management |
Completed | Actual: 06/20/2011 | 08/2011 |
Cynthia Keller 970-262-3495 cpkeller@fs.fed.us |
| Description: proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30932 |
|||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. Vail Ski Resort. | |||||
|
West Lionshead Chairlift Realignment CE |
- Special use management | Cancelled | N/A | N/A |
Don Dressler 970-827-5715 drdressler@fs.fed.us |
| Description: Realign and extend previously approved West Lionshead Chairlift to replace the Pride Express (Chair 26) | |||||
| Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - T. 5 S., R. 80 W., Sec. 7 and 18, 6th P.M. Vail Mountain Ski Area. | |||||
| Back To Top | |||||
White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Apex Road Permit Renewal CE |
- Road management |
In Progress: Scoping Start 12/14/2010 |
Expected:08/2011 |
08/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Long-term renewal of road Special Use Permit for road off of Express Creek Road, south of Aspen. Accesses Rice property near Markley Ski Hut from Braun Hut system. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - NE1/2 sec. 5, T. 12 S., R. 84 W., 6th P.M. South of Aspen on Castle Creek Road, L-Express Creek Road, about 2 1/4 miles, turn right at Markey Hut turn-off. | |||||
|
Aspen Administrative Site Redevelopment Project CE |
- Facility management |
In Progress: Scoping Start 02/19/2009 |
Expected:11/2011 |
10/2012 |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: The project consists of demolition and redevelopment of the Aspen Administrative facilities on the current site. The project would provide an administrative facility for the Aspen-Sopris Ranger District on government owned land in Aspen. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T10S, R85W, Section 12. This is a 3.03 acre (approximately) parcel in the City of Aspen, CO. It is located adjacent to State Hwy 82 at the beginning of the Aspen downtown district. | |||||
|
Aspen SkiCo Ski Areas Forest Health Project EA |
- Vegetation management (other than forest products) - Special use management |
In Progress: 215 Comment Period Legal Notice 06/29/2011 |
Expected:08/2011 |
04/2012 |
Skye Sieber 970-625-6864 ssieber@fs.fed.us |
| Description: Proposal to remove hazard trees and regenerate lodgepole and aspen in selected areas across the four SkiCo ski areas (Aspen Mountain, Aspen Highlands, Buttermilk, Snowmass).
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30908 |
|||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. Aspen Mountain, Aspen Highlands, Buttermilk, and Snowmass Ski Resorts. | |||||
|
Aspen Summer Recreation Events CE |
- Special use management |
In Progress: Scoping Start 05/17/2011 |
Expected:08/2011 |
09/2011 |
Jonathan Thompson 970-963-2266 jonthompson@fs.fed.us |
| Description: Three recreation events are being proposed for the Aspen area trails and roads this summer. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. Various roads and trails around Aspen. | |||||
|
Dahl spring-box, tank, and pipeline CE |
- Special use management |
In Progress: Scoping Start 06/30/2010 |
Expected:08/2011 |
08/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Issue an authorization for an existing spring, cistern, tank, and pipeline in place since the 1970. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. T. 11 S., R. 85 W., Sect. 1. | |||||
|
Diedrich Driveway Modification CE |
- Special use management |
In Progress: Scoping Start 06/30/2010 |
Expected:08/2011 |
08/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Lessen pitch on road, extend and widen existing driveway easement 25 feet south | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T. 11 S., R. 84 W., Sect 18. 7200 Castle Creek Road. | |||||
|
Driveway Alignment and Construction to Ivanhoe Millsite CE |
- Road management |
In Progress: Scoping Start 06/30/2010 |
Expected:07/2011 |
07/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: New road construction from Castle Creek Road to Ivanhoe Millsite Parcel south of Ashcroft. Two options are present for crossing the River Trail. The preferred option re-aligns the river trail to cross in front of the bridge. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Sec. 32, T. 11 S., R 84 W., 6th P.M. Immediately South of the ghost town of Ashcroft. | |||||
|
East Aspen Metro District Mosquito Control EA |
- Watershed management |
In Progress: Scoping Start 06/30/2010 Est. 215 Comment Period Legal Notice 09/2011 |
Expected:12/2011 |
06/2012 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Mosquito control using a natural bacterial byproduct, "Bti" on areas east of Aspen near Wildwood School & Difficult CG. Less than 5 acres of wetland areas to be controlled on an as-needed basis. Treatment is by hand, after assessment is completed. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - 6th P.M., T. 10 S., R. 84 W., Sections 28, 33, and 34. Scattered patches of FS lands east of Aspen along the roaring Fork River. | |||||
|
Mitchell Driveway Improvement CE |
- Special use management |
In Progress: Scoping Start 06/30/2010 |
Expected:09/2011 |
09/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Widen driveway 8 feet to meet county codes and move existing easement south | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T. 10 S., R. 84 W., Sect. 26. 786 Midnight Mine Road. | |||||
|
Snowmass Mountain Bike Trails EA |
- Special use management | Completed | Actual: 04/08/2011 | 05/2011 |
Jim Stark 970-925-3445 jstark@fs.fed.us |
| Description: Analyzing a proposal submitted by the Aspen Skiing Company to construct three new mountain bike trails at the Snowmass Ski Area which are intended to enhance summer lift-assisted biking opportunities.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34245 |
|||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. Snowmass Ski Area. | |||||
|
Snowmass Water and Sanitation District Pipeline CE |
- Special use management |
In Progress: Scoping Start 02/02/2009 |
Expected:09/2011 |
09/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Renewal of existing permit for 8,000-foot pipeline, spring box, intake structure, and access road for Snowmass Village water supply. Existing permit expired December 2008. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Portions of sections 3,10,15,15,12,1, T. 10 S., R. 86 W., 6th PM. Pipeline A runs from the campground area to the top of. | |||||
|
Starwood/Four Corners Fuels Project EA |
- Fuels management | Completed | Actual: 06/20/2011 | 07/2011 |
Bill Kight 970-963-2266 bkight@fs.fed.us |
| Description: Removal of approximately 3,000 dead or infested trees in Trentaz and Gavin Gulches
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34262 |
|||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T9S, R85W, Sections 25 and 36, 6th P.M. 3 miles north of Aspen on 251 acres in Trentaz and Gavin Gulches, west of Red Mountain, adjacent to the community of Starwood. | |||||
|
Town of Aspen Road Permit Renewal CE |
- Special use management - Road management |
In Progress: Scoping Start 03/02/2009 |
Expected:11/2011 |
11/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Renewal of existing road permit, which expires December 2008. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. ASP 44 near Aspen, Colorado. | |||||
|
Ute, Newfoundland, and Benedict Trails Permit Renewal CE |
- Recreation management - Special use management |
In Progress: Scoping Start 03/02/2009 |
Expected:09/2011 |
09/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: The city of Aspen has been maintaining 3 trails under an FS permit since September 1999. The FS and city of Aspen would like to extend this authorization for a 30-year period. No changes to the existing trails or management uses are proposed. | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Portions of Lot 6, sect. 18, T10S, R84W. The Ute trail is located directly west of the Aspen ski area, south of Aspen, CO. | |||||
|
Warmington's Road Improvements CE |
- Road management | Cancelled | N/A | N/A |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: Easement to existing road will be widened to allow road widening and maintenance | |||||
| Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - 6th P.M., T. 10 S., R. 84 W., SW1/4 sec 21, NW1/4 sec 28. East of Aspen on Hwy. 82, 44481 Hwy 82, Aspen, CO. | |||||
| Back To Top | |||||
White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Aldrich Lakes Mechanical Treatments CE |
- Fuels management | Completed | Actual: 04/21/2011 | 07/2011 |
Toni Toelle 970-878-6011 ttoelle@fs.fed.us |
| Description: This proposed project includes a combination of mechanical treatments and prescribed fire to reduce hazardous fuels adjacent to the private lands to the North of the project boundary and improve big game wildlife habitat. | |||||
| Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - T2N, R92W, Sec's 1-4, 10-17, and 24. T3N, R92W, Sec's 25, 26, 34, 35, 36. T3N, R91W, Sec's 33-35. T2N, R91W, Sec's 1, 3-10, 12, 13, 15-25, and 27-29. This proposed project is located on the Northern boundary of the Blanco RD. | |||||
|
Lost Creek Trail Re-location CE |
- Recreation management |
In Progress: Scoping Start 06/01/2011 |
Expected:07/2011 |
08/2011 |
Kasey Cox 970-878-4039 kcox@fs.fed.us |
| Description: Re-routing of .5 mile of Lost Creek Trail #1808 & subsequent closure of .7 mile of the old trail. Trail will be moved from its present setting to a more suitable location. Existing trail is wet, boggy, & partially submerged due to beaver activity. | |||||
| Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - T. 1 N., R. 90 W., Section 14. Re-routing trail starting at approximately 1/4 mile north from Long Lost Trailhead. | |||||
|
Milk Creek Ranch's John Rescorla Ditch Special Use Permit CE |
- Special use management |
In Progress: Scoping Start 11/23/2010 |
Expected:12/2011 |
12/2011 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: Authorize a special use permit for the John Rescorla Ditch across National Forest lands for the purpose of irrigating private lands. | |||||
| Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. approximately 17 miles northeast of Meeker, CO. | |||||
|
Missouri Creek S&G Grazing Allotment EA |
- Grazing management |
In Progress: Scoping Start 02/24/2011 Est. 215 Comment Period Legal Notice 10/2011 |
Expected:12/2011 |
07/2012 |
Mary Cunningham 970-878-4039 mlcunningham@fs.fed.us |
| Description: Analyze domestic sheep grazing on the Missouri Creek S&G grazing allotmen. Resource management options developed will strive to move existing resource conditions towards desired conditions.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=33718 |
|||||
| Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - T 1 N, R 89 W, portions of Sections 3-11; T 1 N, R 90 W, portions of Sections 12 & 13; T 2 N, R89 W, portions of Sections 28, 32-34. The Missouri Creek S&G grazing allotment is located on the north side of the Blanco Ranger District, accessible by FSR 230. | |||||
|
North Elk, Inc. road use authorization CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 04/15/2011 |
Expected:07/2011 |
07/2011 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: authorize use of an existing road crossing National Forest lands to North Elk, Inc. for access to private property | |||||
| Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - T. 2 S., R. 92 W., Section 1, 6th P.M. approximately 15 miles southeast of Meeker. | |||||
| Back To Top | |||||
White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Cache Creek Phase II Master Development Plan for Oil and Gas Exploration and Development EA |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 09/2011 |
Expected:05/2012 | 07/2012 |
Jason Gross 970-876-9046 jrgross@fs.fed.us |
| Description: Noble Energy proposal for 8 new well pads & up to 150 gas wells, some federal. BLM has authority to approve the wells and well pads. Reconstruction and access of roads & burial of pipelines (approx. 0.5 miles) across NF lands is under FS authority. | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Sect. 20, T.7 S., R. 94 W., 6th P.M. Approximately 5 miles south of the I-70 Rulison exit and 8 miles east of Parachute. | |||||
|
Canyon Rim Outfitters CE |
- Special use management | Completed | Actual: 03/01/2011 | 06/2011 |
Kyle Grambley 970-625-6852 kgrambley@fs.fed.us |
| Description: Outfitter and Guide permit renewal | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. North of Glenwood Springs and East of New Castle on general Forest land South of the Flat Tops Wilderness. | |||||
|
Divide Creek Unit Master Development Plan EA |
- Minerals and Geology | On Hold | N/A | N/A |
Jason Gross 970-876-9046 jrgross@fs.fed.us |
| Description: Evaluate EnCana Oil & Gas Inc. proposal to drill up to 7 gas wells from 1 new and 5 existing pads; 4 saltwater disposal wells; 0.5 mi. of new road to access Federal minerals in the Divide Creek Unit. | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield, Mesa. LEGAL - T8S, R91W, Sects 9, 15, 16, 22, 23, 25 27, 36 and T9S, R91W, Sect 1. North and east of Flatiron Mountain, approx. 15 mi. south-southeast of Silt, CO. | |||||
|
East Divide and West Divide Range Allotment Analysis EA |
- Grazing management | Completed | Actual: 06/06/2011 | 07/2011 |
Lydia LaBelle de Rios 970-625-2371 llabellederios@fs.fed.us |
| Description: Environmental process to analyze grazing on two NF allotments.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30923 |
|||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield, Mesa. LEGAL - T8-10S, R90-93W. Two NF grazing allotments covering approximately 77,000 acres, 15 - 20 miles south of Silt, CO. | |||||
|
Lava Boulder Creek Exploratory Well EA |
- Minerals and Geology |
In Progress: Scoping Start 04/18/2011 Est. 215 Comment Period Legal Notice 04/2012 |
Expected:05/2012 |
07/2012 |
Jason Gross 970-876-9046 jrgross@fs.fed.us |
| Description: Antero Resources is requesting to construct 1 well pad and to drill up to 2 wells on Federal lease #COC-66708.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=28966 |
|||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Mesa. LEGAL - T8S, R90W, Section 17. East Divide Creek, approximately 20 miles southeast of Silt, CO. | |||||
|
Little Beaver 2-20 Exploratory Well EA |
- Minerals and Geology | On Hold | N/A | N/A |
Jason Gross 970-876-9046 jrgross@fs.fed.us |
| Description: Willsource Enterprises is proposing to construct 1 well pad, access road, and pipelines; and to drill 1 exploratory well in Federal lease COC 058835 | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Mesa. LEGAL - NW Sec 20 T8S R91W. Approximately 21 miles south of New Castle, CO; 0.5 miles SE of Haystack Mountain. | |||||
|
Mesa County V Road Easement CE |
- Special use management |
In Progress: Scoping Start 12/22/2010 |
Expected:09/2011 |
09/2011 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: Authorize issuance of a public road easement to Mesa County for operation and maintenance of the portion of NFSR 274 (Mesa County V Road) that crosses the White River National Forest. | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Mesa. LEGAL - T. 9 S., R. 96 W., Section 7, 6th P.M. Approximately 4 miles southeast of De Beque. | |||||
|
Reauthorization of Special Use Permit: John and Nancy Kelly - irrigation ditch CE |
- Special use management | Completed | Actual: 05/23/2011 | 06/2011 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: To re-issue the special use permit to John and Nancy Kelly for operation and maintenance of a headgate and buried pipe supplying water for irrigation to private lands. | |||||
| Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Sec. 31, T. 4 S., R. 90 W., 6th P.M. Six miles North of New Castle on NF lands. | |||||
| Back To Top | |||||
White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
| Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
|
Avalanche Campground Healthy Forest Campsite Relocation EA *NEW LISTING* |
- Recreation management - Fuels management |
In Progress: Scoping Start 06/28/2011 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:08/2011 |
09/2011 |
Martha Moran 970-925-3445 extension 3312 mmoran@fs.fed.us |
| Description: Avalanche CG has reached a new level for action for public safety needs due to hazard trees falling on the campsites. To ensure visitor safety and promote a healthy forest the proposal is to close & relocate the 10 sites located in the hazard zone. | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - UTM NAD83 309759E 4346558N. along Avalanche Creek approx. 13 miles from Carbondale, CO. The site can be accessed from Carbondale by traveling approx. 10 miles S on Hwy 133 along the Crystal River & then 3 miles E along FDR 310. | |||||
|
Bowles Ditch and Pipeline Authorization CE |
- Watershed management |
In Progress: Scoping Start 06/30/2010 |
Expected:09/2011 |
09/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: An existing ditch of 2,500 ft. & 2-inch pipeline belonging to Connell Development Co. needs an authorization. No improvements other than normal maintenance are planned. This ditch has been in use for over 70 years, but does not qualify for a DBE. | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - 6th P.M., T. 8 S., R. 83 W., Sections 23 & 24. Fryingpan road. | |||||
|
Burnt Mountain Timber Sale EA |
- Forest products |
In Progress: Scoping Start 01/14/2010 Est. 215 Comment Period Legal Notice 09/2011 |
Expected:11/2011 |
05/2012 |
Richard Haskins 970-625-6843 rhaskins@fs.fed.us |
| Description: Removal of larger lodgepole pine to follow direction for sustained yield even flow timber harvest, and to reduce mountain pine beetle risk and fuels in the area.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=29966 |
|||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle, Pitkin. LEGAL - T83W, R7S, Sec. 33-35 and T83W, R8S, Sec. 2-4, 9-17. Approximately 23 miles south of Eagle, Colorado following forest system roads 400 and 506. | |||||
|
CDOT Highway 133 Debris Dump Site and Placita Roadside Landscaping EA |
- Special use management |
In Progress: Scoping Start 02/27/2009 Est. 215 Comment Period Legal Notice 08/2011 |
Expected:09/2011 |
09/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: CDOT is proposing to permanently store natural road debris inside the bottom switchback east of McClure Pass on Hwy 133. Project will fill in a 16.1-acre depression from original road construction. Includes revegetation of the old Placita fill site. | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - NW 1/4 of Section 18, T11S, R88W, 6th P.M. The switchback is located approximately 5 1/2 miles south of Redstone, CO on Hwy 133. The fill will be inside the switchback. | |||||
|
Carbondale Administrative Site Redevelopment Project EA |
- Facility management | Cancelled | N/A | N/A |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: The project consists of demolition and redevelopment of the Carbondale Admin facilities. The project would improve and continue to provide an accessible government-owned office facility for the Aspen/Sopris RD on government-owned land in Carbondale. | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - T7S, R88W, Section 34. The facilities are currently located approximately 0.5 miles west of State Highway 133 on an approximate 1.2 acre parcel in downtown Carbondale. | |||||
|
Competitive or direct sale of El Jebel "Tree Farm" administrative property EA |
- Land ownership management |
Developing Proposal Est. Scoping Start 08/2011 |
Expected:05/2012 | 08/2012 |
Kevin Warner 970-945-3205 kwarner@fs.fed.us |
| Description: To offer for competitive sale to the public or direct sale to a governmental organization 30-90 acres of land and associated improvements. This action will be carried out under the authority of the FS FRE Act of 2005 (P.L. 109-54). | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4, T. 8 S., R. 87 W., 6th P.M. to the west of Crown Mountain Park, to the south of Valley Road, and to the north of the Roaring Fork river in El Jebel. | |||||
|
Competitive or direct sale/exchange of the Sopris Pasture Parcel EA |
- Land ownership management |
In Progress: Scoping Start 03/24/2009 Est. 215 Comment Period Legal Notice 10/2011 |
Expected:01/2012 |
03/2012 |
Kevin Warner 970-963-2266 kwarner@fs.fed.us |
| Description: To offer for competitive sale to the public or direct sale or exchange an admin/ use parcel comprising 11.38 acres located in unincorp. Garfield County, under the authority of the FS Facilities Realignment and Enhancement Act of 2005 (P.L. 109-54). | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Lot 11 of Section 35, T7S, R88W of the 6th P.M., containing 11.38 acres. Located in unincorporated Garfield County, East of the Township of Carbondale. | |||||
|
North Thompson/Fourmile and Coal Basin Grazing Allotment Analysis EA |
- Grazing management |
In Progress: Scoping Start 01/20/2010 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:09/2011 |
06/2012 |
Wayne Ives 970-963-2266 wives@fs.fed.us |
| Description: Analyze domestic livestock grazing on the North Thompson/Fourmile and Coal Basin Grazing Allotments
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=30088 |
|||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield, Pitkin. North Thompson/Fourmile and Coal Basin Grazing Allotments, on the west side of the Sopris RD, west of State Hwy 133. | |||||
|
State of Colorado - McClure Pass Power Source and Communication Site EIS *NEW LISTING* |
- Special use management |
Developing Proposal Est. NOI in Federal Register 07/2011 |
Expected:03/2012 | 06/2012 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: to install a power-source, likely a powerline, south of Horseshoe Bend on CSH 133 to provide power to a communications site located on the Gunnison NF to provide emergency communications in that area | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - NW1/4 of section 18, T. 11 S., R. 88 W.; N1/2 of section 13, T. 11 S., R. 89 W., 6th P.M. (Chair Mountain Quad). about 20 miles south of Carbondale on CSH 133. | |||||
|
Sunlight Inc. - FSR 300 Easement EA |
- Road management |
In Progress: Scoping Start 06/30/2010 Est. 215 Comment Period Legal Notice 09/2011 |
Expected:11/2011 |
11/2011 |
James Kirschvink 970-945-3313 jkirschvink@fs.fed.us |
| Description: A reciprocal road easement to be issued to Sunlight Inc. for using 8,810 feet of Forest Service Road 300 to access private land. No new disturbance is planned at this time. | |||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - 6th P.M., T. 7 S., R. 89 W., Sections 32 & 33, USFS Cattle Creek Quad. FSR 300. | |||||
|
White Banks Mine Plan of Operations EA |
- Minerals and Geology |
In Progress: Scoping Start 02/03/2011 Est. 215 Comment Period Legal Notice 07/2011 |
Expected:08/2011 |
11/2011 |
Skye Sieber 970-625-6864 ssieber@fs.fed.us |
| Description: Evaluate the proposed Plan of Operations submitted by Elbram Stone Company, LLC to continue alabaster mining operations at the White Banks quarry.
Web Link: http://www.fs.fed.us/nepa/project_content.php?project=34869 |
|||||
| Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - T9S, R88W, Section 28. Avalanche Creek drainage, approximately 9 miles south of Carbondale in the Crystal River Valley, Access via Forest Service Road 310. | |||||
|
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. |
|||||