Hiawatha National Forest
Sault Ste. Marie and St. Ignace Ranger District
Return to Home Page
Return to Project Planning Page
District Ranger Stevan Christiansen is accepting comments on the Eastside AOP Project. The project is proposing to replace 18 existing culverts with pre-cast box, structural plate arch, concrete span culverts, or bridges. Approaches to the culverts may be paved to further reduce sedimentation. The project is located in Mackinac and Chippewa counties, Michigan.
Document Format Scoping Letter
Map
Project List Photos