Revised Ice Timber Sale and Fuels Reduction Project
Analysis of a fuels reduction project in the Ice analysis area began in 1993 as a result of concerns expressed by homeowners regarding the fire danger posed by high fuel loadings and dense, forest stands surrounding the Alta Sierra tract in the Greenhorn Mountains. An environmental assessment (EA) for the Ice Project was completed in April of 1994. Subsequent analysis resulted in a Revised Ice Timber Sale and Fuels Reduction Project, which was approved in December 1998. Implementation of the Ice Project was enjoined in October 2006 until a supplemental NEPA analysis was completed. The Sequoia National Forest is now providing a preliminary draft of Revision 1 of the Revised Ice Project Environmental Assessment for public review and comment.
Letter for New Comment Period, September 2010 (490kb pdf)
Revised Ice Timber Sale and Fuels Reduction Project Cover Letter, May 2010 (449kb pdf)
Preliminary Revision 1 to the Environmental Assessment (EA), May 2010 (339kb pdf)
Supplemental Biological Evaluation (BE) for Fisher, May 2010 (1.3mb pdf)
Supplemental BE for Fisher, Maps, May 2010 (3.8mb pdf)
Appendix B, Vicinity and Project Maps, May 2010 (1.6mb pdf)
Appendix D, Watershed Specialist Report, January 2010 (1.7mb pdf)
Appendix E, Supplemental Information Review, January 2010 (1.3mb pdf)
Appendix F, Fire and Fuels Supplemental Information Review, January 2010 (508kb pdf)
Appendix G, Management Indicator Species (MIS) Report, December 2009 (267kb pdf)
Appendix H, References, May 2010 (91kb pdf)
Appendix I, Stand Visualizations, May 2010 (6.2mb pdf)