Implementation Report for Recreation Enhancement Act Proposals
Presented to California RRAC - May 2009

Agency Unit Recreation Site/Area Recreation Enhancement Act Fee Type Meeting Date California Recreation Resource Advisory Committee recommendation Planned accomplishments from fee analysis tool or business plan Date fee changes were implemented How REA revenues are being used (through March 20, 2009)
BLM Barstow Field Office Dumont Dunes OHV Area Special Recreation Permit 11/6/2007 Increase fee from $20 to $30 for weekly pass, $60 to $90 for annual pass, new $10 holiday weekly fee, and $30 all holiday annual pass. Park rangers; law enforcement rangers; maintenance staff; planning & engineering staff; fee collection officers; management & administration; volunteer coordinator; medical aid staff; road maintenance; camping area maintenance; toilet maintenance, including pump out, painting and cleaning; heavy equipment and vehicle use and maintenance; volunteer campground host stipend; medical supplies; brochure printing; signing; additional law enforcement, medical aid, maintenance, fee collection, and park ranger staff on holiday weekends. 11/21/07 2007 - Widening of the low water crossing and road pavement at the entrance to the recreation area. 2008 - Permit distribution costs, additional holiday staffing, vehicles, annual operations, toilet cleaning and pumping, and law enforcement staff.
BLM Barstow Field Office El Mirage OHV Area Special Recreation Permit 11/6/2007 Implement new fee of $30 for weekly pass, $90 for annual pass, $15 for daily pass. Park rangers; law enforcement rangers; maintenance staff; planning & engineering staff; fee collection officers; management & administration; volunteer coordinator; medical aid staff; road maintenance; camping area maintenance; toilet maintenance, including pump out, painting and cleaning; heavy equipment and vehicle use and maintenance; volunteer campground host stipend; medical supplies; brochure printing; signing; additional law enforcement, medical aid, maintenance, fee collection, and park ranger staff on holiday weekends. 10/01/08 Annual operations as described in the planned accomplishments.
BLM El Centro Field Office Imperial Sand Dunes OHV Area Special Recreation Permit 1/15/2008 Increase fee purchased on site from $25 to $40 weekly pass, $90 to $120 for season pass. Note: Passes purchased off site will not change. Increased Compliance with existing rules and regulations; prevention/reduction of OHV injuries; trash collection; restroom facilities; maintained access; road maintenance; Buttercup Ranger Station; increased camping areas; and interpretation/education. 10/01/08 Fee revenues were used for permit distribution costs, additional holiday staffing, trash collection, vehicles, annual operations, toilet cleaning and pumping, and law enforcement staff.
BLM Hollister Field Office Clear Creek OHV Area Special Recreation Permit 11/6/2007 Implement new fee of $10/OHV for weekly pass, $80 for seasonal pass (includes primary vehicle & 2 OHVs), $80 for non-OHV use season for primary vehicle, and $5/vehicle day use fee. Site and facility amenity maintenance, repair and replacement; maintenance and improvements of trail network; trash collection and toilet pump-out at sites and transport to disposal area; service vehicle maintenance/repairs/fuel; and law enforcement and park rangers, fee collection, visitor services and emergency assistance. 01/01/08 Closed May 1, 2008 due to EPA Assessment, site remains closed.
BLM Kings Range King Range Expanded Amenity 6/25/2008 Continue to collect a fee of $5/canister/trip in the King Range. Continue to provide bear canister rental program. Since 2000 Continue to provide bear proof canisters to visitors.
FS Cleveland NF Blue Jay Campground Expanded Amenity 6/25/2008 Increase fee from $15 to $20, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace picnic tables and grills
  • Replace traffic barriers
  • Water system repairs.
03/20/09 REA funds were used for annual operation and maintenance (O&M) of the campground. O&M included replacement/restoration of several tables and grills, water samples, cleaning supplies, pumping toilets and garbage service. Extensive snow storm clean up was necessary in 2008 using both REA and appropriated funds.
FS Cleveland NF Boulder Oaks Campground Expanded Amenity 6/25/2008 Increase fee for single sites from $10 to $14, $20 to $28 for double sites, $12 to $16 for equestrian sites, $24 to $32 for equestrian double sites, and extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Continue to accept Adventure Pass accepted for day use. Planned accomplishments include:
  • Replace vault toilets
  • Replace traffic barriers
  • Repair water system
01/01/09 Annual O&M of the campground with REA funds included new pump and motor for the well, water samples, cleaning supplies, pumping toilets and garbage service.
FS Cleveland NF Cibbets Flat Campground Expanded Amenity 6/25/2008 Increase fee for single sites from $10 to $14, $20 to $30 for double sites, and extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing Planned accomplishments include:
  • Replace picnic tables and grills
  • Water system repairs
01/01/09 Annual O&M of the campground with REA funds included replacement of two new fire rings and two picnic tables, installed new septic system at the host site, well maintenance, water samples, cleaning supplies, pumping toilets, garbage service and picnic table repairs.
FS Cleveland NF Dripping Springs Campground Expanded Amenity 6/25/2008 Increase fee for single sites from $12 to $15, $20 to $30 for double sites, and extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Continue to accept the Adventure Pass for day use. Planned accomplishments include:
  • Replace information kiosk & bulletin boards
  • Repair water system to equestrian sites.
  • Install new corrals at equestrian sites.
  • Replace tables & grills throughout campground.
05/31/09 Annual 2008 O&M of the campground with REA funds included new three (3) sided interpretive/fee station sign panel, upgraded electrical to host site, lights installed at host site and bathroom, water samples, cleaning supplies, pumping toilets and garbage service. March 2009 - Replaced three existing restrooms with three (3) new vault toilets included ADA accessible sidewalks. Per RFA, reduce deferred maintenance and conversion of constructed feature to meet accessibility standards. RSI funds were used for design, survey, demolition, site work, materials, supervision and labor for new toilets and sidewalks. A combination of ARRA - Stimulus and roads funds were used to re-pave the road and parking spurs.
FS Cleveland NF Falcon Group Campground Expanded Amenity 6/25/2008 Increase fee for Sage site from $50 to $60, Lupine site from $60 to $75, and Yarrow site from $100 to $120. Planned accomplishments include:
  • Replace kiosks
  • Replace barriers in campsites and along road
  • Replace tables & grills
03/20/09 Annual 2008 O&M of the campground with REA funds included replacement/restoration of a few tables and grills, replacement of some barriers, water samples, cleaning supplies, pumping toilets and garbage service. March 2009 - Replaced existing restrooms with three (3) new two-vault toilets and ADA accessible sidewalks. RSI funds were used for design, survey, demolition, site work, materials, supervision and labor to install the new toilets and sidewalks. Re-paved road with roads funds. Per RFA, reduced deferred maintenance and conversion of constructed feature to meet accessibility standards. Unexpected snow storm damaged trees in and around the campground leaving dead and dying limbs hanging in the trees. Other forest funds were used to accomplish the extensive 3-month long winter storm damage clean-up. REA funds were not sufficient to complete the health and safety work before the CNF could reopen the campground.
FS Cleveland NF Fry Creek Campground Expanded Amenity 6/25/2008 Increase fee from $12 to $15, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace bulletin boards & signs
  • Replace kiosks & fee tubes
  • Replace tables & grills
  • Replace barriers
05/01/09 Annual 2008 O&M of the campground with REA funds included replacement of 4 grills, water samples, cleaning supplies, pumping toilets, garbage service, and small amount of hazard tree removal.  March 2009 - Replaced existing restrooms with two (2) new two-vault toilets and ADA accessible sidewalks. RSI funds were used for design, survey, demolition, site work, materials, supervision and labor to install the new toilets and sidewalks. Re-paved road and parking using ARRA - Stimulus funds. RFA, reduce deferred maintenance and conversion of constructed feature to meet accessibility standards.
FS Cleveland NF Indian Flat Campground Expanded Amenity 6/25/2008 Increase fee from $10 to $12, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace kiosks & bulletin boards
  • Upgrade 15 sites & remove 6 sites from sensitive riparian area
  • Replace toilets
05/31/09 Annual O&M of the campground with REA funds included water samples, cleaning supplies, pumping toilets and garbage service. 
FS Cleveland NF Oak Grove Campground Expanded Amenity 6/25/2008 Increase fee for single sites from $10 to $15, $20 to $30 for double sites, and extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing Planned accomplishments include:
  • Install accessible parking areas and walkways for the 2 new CXT installed in 2007
  • Repair/replace signing
  • Replace kiosks
  • Replace barriers
  • Replace tables & grills
01/01/09 Annual O&M of the campground with REA funds included new interpretive/fee sign, route and trench upgraded electrical and breaker panel for host site, new fence at host site, repairs to flush toilets, water samples, cleaning supplies, pumping toilets, garbage service, and small amount of hazard reduction (brush removal).
FS Cleveland NF Observatory Campground Expanded Amenity 6/25/2008 Increase fee for single sites from $12 to $15, $20 to $30 for double sites, shower from $.10/minute to $.25/minute, and extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing Planned accomplishments include (as funding becomes available):
  • Renovate 40 campsites
  • Repair/replace signing
  • Replace kiosks & Fee tubes
  • Repair fencing
  • Repair foot bridge
04/02/09 Annual 2008 O&M of the campground with REA funds included repairs to shower and coin bin, replace rotting sign posts, water samples, cleaning supplies, pumping toilets, garbage service, and small amount of hazard tree removal. March 2009 - Construction of the Kia Mica Overlook was completed. Located on County Road S7, it will enhance the day use experience for campers at both Observatory and Fry Creek Campgrounds. This is one of three overlooks described in the RFA, Niche Bridge for Developed Recreation, High Country. The forest visitors will enjoy spectacular views of the San Diego backcountry. A combination of non- REA funds were used to accomplish this project.
FS Cleveland NF Upper San Juan Campground Expanded Amenity 6/25/2008 Increase fee from $15 to $18, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace kiosks
  • Replace barriers
  • Add host site as funds become available
01/01/09 Annual 2008 O&M of the campground with REA funds included water samples, cleaning supplies, pumping toilets and garbage service. 
FS Cleveland NF Wildomar Campground Expanded Amenity 6/25/2008 Increase fee from $10 to $15, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace kiosks
  • Replace barriers
  • Adding a host site as funds become available
03/01/09 Annual 2008 O&M of the campground with REA funds included water samples, cleaning supplies, pumping toilets, and garbage service. Installation of a gate with REA funds was also accomplished this year. The campground can now remain open when the OHV area is closed due to inclement weather, poor road and trail conditions. Installed approximately 200 feet of barrier pipe in the Wildomar OHV area with OHV funds. Niche Bridge for Developed Recreation, RFA, improvement to a site that supports day use, access to forest, OHV.
FS Cleveland NF Wooded Hill Group Campground Expanded Amenity 6/25/2008 Decrease fee from $165 to $110. Planned accomplishments include:
  • Install picnic tables
  • Install fire rings
05/22/09 Annual 2008 O&M of the campground with REA funds included three new picnic tables, materials for rock fire pit installed by volunteers, water samples, cleaning supplies, pumping toilets, garbage service, and hazard tree removal. Removal of oak trees was heavier than usual this year.
FS Eldorado NF Northshore Campground Expanded Amenity 11/6/2007 Increase campsite fee from $8 to $10 per night. Annual operation and maintenance includes maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, and hazard tree removal. 06/01/08 Fees were used for annual operation and maintenance, and the level of maintenance was increased to weekly. A heavy brush removal project was also done.
FS Eldorado NF Jones Fork Campground Expanded Amenity 11/6/2007 Increase campsite fee from $8 to $10 per night. Annual operation and maintenance includes maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, and hazard tree removal. 06/01/08 Fees were used for annual operation and maintenance, and the level of maintenance was increased to weekly. A heavy brush removal project was done, and bear-proof food storage boxes were installed at each site
FS Eldorado NF Strawberry Point Campground Expanded Amenity 11/6/2007 Increase campsite fee from $8 to $10 per night. Operation and maintenance including maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, and hazard tree removal. 06/01/08 Fees were used for annual operation and maintenance, and the level of maintenance was increased to weekly. A heavy brush removal project was also done.
FS Eldorado NF Northwind Campground Expanded Amenity 11/6/2007 Increase campsite fee from $8 to $10 per night. Annual operation and maintenance includes maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, and hazard tree removal. 05/25/08 Fees were used for annual operation and maintenance, and the level of maintenance was increased to weekly. A heavy brush removal project was also done.
FS Eldorado NF Wrights Lake Equestrian Campground Expanded Amenity 11/6/2007 Increase campsite fee from $18 to $20 per night. Extra vehicle fee $5. Operation and maintenance including maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, hazard tree removal, interpretive services, and resource management. Planned accomplishments include:
  • Installation of bear proof food lockers
03/19/08 Fees were used for annual operation and maintenance, with an increase in the level of daily maintenance provided. Provided weekly interpretive programs as well as guided weekend day hikes featuring nature talks and litter awareness. Replaced gas-fueled maintenance vehicles at Wrights Lake with a "greener" electric car. A solar component for the vehicle is currently being installed. Patched, repaired and repainted all bathroom interiors. Implemented a big hazard tree removal and cleanup project. Bear proof food lockers are planned for installation in the 2009 field season.
FS Eldorado NF Wrights Lake Campground Expanded Amenity 11/6/2007 Increase campsite fee from $18 to $20 per night, $34 to $36 for double site. Extra vehicle fee $5. Operation and maintenance including maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, hazard tree removal, interpretive services, and resource management. Planned accomplishments include:
  • Installation of bear proof food lockers
03/19/08 Fees were used for annual operation and maintenance, with an increase in the level of daily maintenance provided. Provided weekly interpretive programs as well as guided weekend day hikes featuring nature talks and litter awareness. Replaced gas-fueled maintenance vehicles at Wrights Lake with a "greener" electric car. A solar component for the vehicle is currently being installed. Patched, repaired and repainted all bathroom interiors. Implemented a big hazard tree removal and cleanup project. Some bear proof food lockers have been installed. Additional food lockers are planned for installation in the 2009 field season.
FS Eldorado NF Lover's Leap Campground Expanded Amenity 11/6/2007 Implement new campsite fee of $10. Extra vehicle fee $5. Annual operation and maintenance includes maintaining cleanliness of campground, pumping toilets, garbage collection, patrol, and hazard tree removal. Start up funds will be used to replace site number posts and install signing and fee envelope box. Other planned improvements include replacement of tables, adding grills/fire rings, and some bear boxes. This new fee will enable Forest to extend season of use and improve frequency of maintenance. 05/09/08 The new user fees were used to pay for annual operation and maintenance of the campground with an extended season of use and greater frequency of maintenance. We also installed signing, 21 new fire rings, and parking markers.
FS Eldorado NF Loon Lake Chalet Expanded Amenity 11/6/2007 Increase recreation rental fee from $75 to $100 per night. Annual operation and maintenance includes maintaining cleanliness, pumping toilets, garbage collection, and supplies. Planned accomplishments include repairs/replacement of roofing and decking. April 2008 Fees continue to be used to operate and maintain this popular year-round recreation rental. A portion of the fees were used to repair the deck, rewire outdoor lighting; clean the carpets, and purchase new futon covers.
FS Eldorado NF Van Vleck Bunkhouse Expanded Amenity 11/6/2007 Increase recreation rental fee from $65 to $75 per night. Annual operation and maintenance includes maintaining cleanliness, pumping toilets, garbage collection, and supplies. Planned accomplishments include new windows and siding. 7/1/2008 Fees continue to be used to operate and maintain this popular recreation rental. New windows and siding were installed. Improvements were also made to the water system. Installed a new CXT Vault Toilet designed to fit with the Bunkhouse to accommodate larger groups that are enjoying this recreation rental.
FS Eldorado NF Robbs Hut Expanded Amenity 11/6/2007 Increase recreation rental fee from $45 to $65 per night. Annual operation and maintenance includes maintaining cleanliness, pumping toilets, garbage collection, and supplies. April 2008 Fees continue to be used to operate and maintain this popular recreation rental. Coordinated Annual Robs Hut work day at which members of El Dorado Nordic Ski Patrol helped perform painting and maintenance at the rental hut and lookout fees were also used to pay for heater reconditioning.
FS Eldorado NF Sly Guard Cabin Expanded Amenity 1/15/2008 Implement a new recreation rental fee of $65 per night. Start up funds will be used to prepare the Sly Guard Cabin for use (including cleanup and minor repairs), and purchase furnishings as needed. Fees will support ongoing operation and maintenance, including cleaning contract. Sometime in 2009 Work is in progress to prepare the cabin for use. Forest began repair and clean-up work on the cabin June 2008. A new roof was installed on Sly Guard Cabin in Oct 2008. New bathroom fixtures have been installed. Hazard tree removal, and other clean up and repairs are in progress. Fee collection will be implemented when the cabin goes on line in the reservation system some time in 2009
FS Eldorado NF Carson Pass TH Standard Amenity 1/15/2008 Increase day use fee from $3 to $5 per day, annual pass remains $20. Planned accomplishments include:
  • Completing trail maintenance on trails accessed from this trailhead
  • Help fund wilderness ranger (resource and visitor protection)
  • Replace toilet building (as funds become available)
6/1/08 A portion of the fees were used to clean and re-stain the log exterior of the Carson Pass Visitor Information Center serving Carson Pass and Meiss Trailheads and install a propane heating stove inside. Funding was also used for cleaning/pumping of toilets, partial funding of wilderness ranger for the Carson Pass area (level of wilderness patrols was increased), and trail maintenance. REA funds were also used to replace the old vault toilet at the Carson Pass parking area with a double unit pre-cast concrete CXT toilet in Nov 2008.
FS Eldorado NF Meiss TH Standard Amenity 1/15/2008 Increase day use fee from $3 to $5 per day, annual pass remains $20. Planned accomplishments include:
  • Completing trail maintenance on trails accessed from this trailhead
  • Replace picnic tables
6/1/08 A portion of the fees were used to clean and re-stain the log exterior of the Carson Pass Visitor Information Center serving Carson Pass and Meiss Trailheads and install a propane heating stove inside. Funding was also used for cleaning/pumping of toilets, partial funding of wilderness ranger for the Carson Pass area (level of wilderness patrols was increased), and trail maintenance. The picnic table was also completely refurbished.
FS Eldorado NF Woods Lake TH Standard Amenity 1/15/2008 Increase day use fee from $3 to $5 per day, annual pass remains $20. Planned accomplishments include:
  • Completing trail maintenance on trails accessed from this trailhead
  • Help fund wilderness ranger (resource and visitor protection)
6/1/08 Funding was used for cleaning/pumping of toilets, partial funding of wilderness ranger for the Carson Pass area (level of wilderness patrols was increased), and trail maintenance.
FS Eldorado NF Pyramid Creek TH Standard Amenity 1/15/2008 Increase day use fee from $3 to $5 per day, annual pass remains $20. Planned accomplishments include:
  • Extended season
  • Increased frequency of site cleaning & increased uniformed presence
  • Additional signing
  • Repairs to well and septic system
5/9/2008 Fees were used to pay for operation & maintenance including toilet pumping and cleaning of toilets and providing Forest Service presence at the site. A portion of the fees were used to pay half the cost of replacing the broken well pump at this site.
FS Eldorado NF Woods Lake Picnic Area Standard Amenity 6/25/2008 Implement new day use fee of $5/day at the picnic area. The $20 Eldorado/LTBMU annual pass & Interagency Passes accepted here. Planned accomplishments include:
  • New bear proof trash containers
June 2009 New fee will go into effect this season, est 6/15/2009
FS Eldorado NF Big Meadows Campground - Double Site Expanded Amenity 6/25/2008 Increase fee from $10 to $20 at double site. Planned accomplishments at the double site include:
  • Install 3 additional picnic tables
July 2008 Contribution to overall cost of operation and maintenance of the campground. The double site is one of ten sites at Big Meadows to be reconstructed under contract (spurs improved and campsite re-graded to meet accessibility standards) in September 2009 using FERC funding. New picnic tables will be installed after the grading work is completed.
FS Inyo NF Cedar Flat Group Camps Expanded Amenity 6/25/2008 Implement new group camping fees of $25/night at Ferguson & Noren, $35 for Nelson. Annual operation and maintenance 07/01/08 Planned accomplishments included the expansion of maintenance and service to these facilities.  These increases to the operation and maintenance have been accomplished through additional garbage/trash service, more site visits to clean the site. In addition, the site has a newly constructed recycle center. The fees have allowed for expanded staffing to support the site maintenance needs which has eliminated any deferred maintenance issues at the site. 
FS Klamath West Branch Campground Expanded Amenity 10/16/2008 Eliminate $10/night fee and operate as a fee site. Extend the season until end of October to accommodate hunters. With the elimination of a fee the forest will continue to perform annual operation and maintenance but will reduce the amenities and services. 05/01/09 Plan to move one toilet during FY 2009
FS Klamath Carter Group Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for group site from $30 per night to $50 per night. Planned accomplishments include:
  • Replace picnic tables
  • Replace fire rings
  • Repair corrals
05/01/09 Fee change planned for opening - approximately late May or early June. Annual operations and maintenance
FS Klamath O'Neil Creek Group Campground Expanded Amenity 10/16/2008 Change expanded amenity fee from $8/night for 12 single family sites to one group site fee of $50/night.  Planned accomplishments include:
  • Replace picnic tables
  • Replace concrete fire rings
  • Construct accessible path to group site
  • Repair water system; drilling a new well & add chlorinator system
Planned for 5/1/2010 Water system repairs were planned before campground re-opens as a group site. Work was originally planned for 2009 but has been postponed until 2010. Campground will remain closed until water system is repaired.
FS Klamath Juanita Lake Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $10 to $15, $10 to $20 for double sites, $30 to $50 for group site. Planned accomplishments include:
  • Repair Klamath Stoves
  • Repair boat ramp; resurface the boat ramp approach
  • Resurface the accessible fishing platforms
  • Replacement of fire rings, and wood picnic tables
05/01/09 Annual operations and maintenance
FS Klamath Indian Scotty Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for group site from $30 per night to $50 per night. Planned accomplishments include:
  • Repair water system; replace pipe in group site
  • Replacement of fire rings, and wood picnic tables.
05/01/09 Fee change planned for opening - approximately 5/1/2009 (NRRS currently reflects change). Annual operations and maintenance
FS Klamath Curly Jack Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $10 to $15, $30 to $50 for group site. Planned accomplishments include:
  • Replacement of 2 SST toilets with CXT
  • Replacement of fire rings, and wood picnic tables.
05/01/09 Fee change planned for opening - approximately 5/1/2009 (NRRS currently reflects change). Annual operations and maintenance
FS Klamath Sarah Totten Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for group site from $30 per night to $50 per night. Planned accomplishments include:
  • Replace picnic tables
  • Replace fire rings
  • Repair water system; replace pipes
05/01/09 Fee change planned for opening - approximately 5/1/2009 (NRRS currently reflects change). Annual operations and maintenance
FS Klamath Kangaroo Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $10 to $15. Planned accomplishments include:
  • Replacement of fire rings, pedestal grills and wood picnic tables
  • Repair sidewalks
May/June 2009 Fee change planned for opening - approximately late May or early June. Annual operations and maintenance
FS Klamath Tree of Heaven Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $10 to $15. Planned accomplishments include:
  • Replace picnic tables
  • Replace fire rings
  • Repave interpretive trail
05/01/09 Fee change planned for opening - approximately 5/1/2009 (NRRS currently reflects change). Annual operations and maintenance
FS Klamath Martin's Dairy Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $8 to $10. Planned accomplishments include:
  • Repair Klamath Stoves
  • Replacement of fire rings, and wood picnic tables
05/01/09 Fee change planned for opening - approximately May 1. Annual operations and maintenance
FS Klamath Shafter Campground Expanded Amenity 10/16/2008 Increase expanded amenity fee for single sites from $6 to $10. Planned accomplishments include:
  • Replacement of fire rings, and wood picnic tables.
05/01/09 Fee change planned for opening - approximately May 1. Annual operations and maintenance
FS LTBMU Eagle Falls TH Standard Amenity 1/15/2008 Increase day use fee from $3 to $5 per day, annual pass remains $20. Planned accomplishments include:
  • Completing trail maintenance on trails accessed from this trailhead
  • Help fund wilderness ranger (resource and visitor protection)
05/01/08 All planned work has been accomplished as proposed in the submission to the R-RAC on 1/15/2008. The increased funding was used to maintain the site and support wilderness ranger staff. Annual visitation at this site was not affected by the fee increase, and the public did frequently comment on the high quality of this REA supported facility.
FS Mendocino Eel River CG Expanded Amenity 1/15/2008 Increase campsite fee from $6 to $8 per night. Planned accomplishments include:
  • Painting toilet doors
  • Replacing fence
  • Adding one accessible campsite
  • Adding two pull-through campsites
  • Replacing parking barriers.
05/01/09 Two pull-through campsites have been constructed, rock parking barriers have been installed, toilet doors have been painted.
FS Mendocino Deer Valley CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $6 per night Planned accomplishments include:
  • Replacement of ten fire rings, 18 pedestal grills, and six wood picnic tables.
  • Installation of parking barriers, site barriers, and site markers.
11/15/08 Just started charging fees in the fall. Prioritized needs will be determined this spring, and work will be conducted in 09.
FS Mendocino Middle Creek CG Expanded Amenity 1/15/2008 Increase campsite fee from $6 to $8 per night, double sites from $10 to $12, and a $2 extra vehicle fee. Planned accomplishments include:
  • Repaint toilet doors and chlorinator building
  • Replace four concrete fire rings
  • Install traffic barriers
  • Maintain water system
05/12/08 Toilet doors have been painted, water system has been maintained, traffic barriers have been installed. Concrete fire rings to be repaired (rather than replaced) in 2009.
FS Mendocino Penny Pines CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $6 per night Planned accomplishments include:
  • Replace four fire rings/grills and two picnic tables with concrete tables
  • Maintain kiosk and traffic barriers
11/15/08 Kiosk was rebuilt and barriers were maintained or replaced as needed. Fire rings and picnic tables are scheduled for replacement in March 2009.
FS Mendocino Camp Discovery Group CG Expanded Amenity 1/15/2008 Increase group campsite fee from $150 to $175 per night and day use fee from $75 to $100 per day. Free boat launching. Planned accomplishments include:
  • Repainting sleeping shelters and cooking pavilion.
  • Repairing shower building
  • Purchasing and installing fee shower collection units
  • Repairing amphitheater seating.
5/12/2008 (Season Opening) Shower building and amphitheater seating were repaired in 2008.
FS Mendocino Davis Flat CG Expanded Amenity 1/15/2008 Implement a new fee of $5 per vehicle per night Planned accomplishments include:
  • Adding new concrete picnic tables
  • Maintaining fencing and barriers around sensitive areas to protect resources
  • Painting doors on toilets
  • Improving water system to current accessibility standards.
02/12/09 Fencing and barrier work have been conducted. Fee implementation was delayed until February 2009 due to work needed in order to install fee tubes and signing associated with new fees.
FS Mendocino Fouts CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $5 per night Planned accomplishments include:
  • Replacing four picnic tables with concrete tables
  • Replacing three fire rings
  • Painting the toilet door
  • Installing in five pedestal grills.
01/30/09 Planned accomplishments have not been made to date. Fee implementation was delayed until late January 2009 due to work needed in order to install fee tubes and signing associated with new fees. Additional work is planned for 2009.
FS Mendocino Gray Pine Group CG Expanded Amenity 1/15/2008 Increase group campsite fee from $50 to $75 per night. Annual operation and maintenance includes maintaining cleanliness, garbage service, pumping toilets, and providing supplies. 5/12/2008 (Season Opening) Work planned associated with fee increases at this site has been accomplished.
FS Mendocino Hammerhorn CG Expanded Amenity 1/15/2008 Increase campsite fee from $6 to $8 per night. Planned accomplishments include:
  • Repainting toilet and utility building
  • Replacing parking barriers
  • Maintenance on the water system
5/15/09 (Season Opening) General operation and maintenance and water system maintenance has occurred.
FS Mendocino Howard Lake CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $6 per night Planned accomplishments include:
  • Painting toilet buildings
  • Purchasing new site signs
  • Replacing fire rings & grills.
5/15/09 (Season Opening) Two grills have been replaced. Additionally, a floating dock was installed and noxious weed abatement work has been conducted to eradicate Canary Grass.
FS Mendocino Howard Meadows CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $6 per night Planned accomplishments include:
  • Painting toilet buildings
  • Purchasing new site signs
  • Replacing fire rings & grills
5/15/09 (Season Opening) General operation and maintenance activities.
FS Mendocino Little Doe CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $6 per night Planned accomplishments include:
  • Improving the visitor information signing.
5/15/09 (Season Opening) All work planned for this campground including reconstruction of access road, placement of new fire rings and picnic tables, and signing has been accomplished. Rock barriers will be installed in spring 2009.
FS Mendocino Little Stony CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $5 per night Planned accomplishments include:
  • Maintaining paved access road
  • Replacing directional and site specific signs.
01/30/09 Site was recently upgraded, and access road work and sign replacement has not yet been needed.
FS Mendocino Main Letts CG Expanded Amenity 1/15/2008 Increase campsite fee from $10 to $12 per night. Planned accomplishments include:
  • Replacing eight fire ring/grills
  • Repainting toilet doors
  • Replacing wood parking barriers
  • Replacing 12 picnic tables with concrete tables
  • Maintaining access road and interior roads
  • Improving visitor signing.
5/18/2008 (Season Opening) Picnic tables, fire rings and parking barriers have been replaced. Visitor signing, including replacement of information kiosk and signs, has been accomplished.
FS Mendocino Masterson Group CG Expanded Amenity 1/15/2008 Increase group campsite fee from $50 to $75 per night. Planned accomplishments include:
  • Repainting toilets
  • Replacing fencing around site
  • Replacing site entrance sign
  • Replacing 4 regular fire rings and two group fire rings
  • Repairing access road
  • Replacing entrance gate
  • Replacing meadow protection fencing
  • Upgrading water faucets to ADA standards
6/02/2008 (Season Opening) Fencing around site, entrance sign, and gate have been replaced. Fire rings have been purchased and are planned for installation in 2009. Water faucets have been upgraded. Additionally, picnic tables have been replaced throughout this site.
FS Mendocino Mill Creek CG Expanded Amenity 1/15/2008 Implement a new fee of $5 per vehicle per night Planned accomplishments include:
  • Replacing parking barriers
  • Repairing toilet
  • Replacing two fire rings
  • Replacing one picnic table with a concrete table.
01/30/09 Parking barriers have been repaired or replaced. Fire rings and tables have been purchased and will be installed in 2009.
FS Mendocino Mill Valley CG Expanded Amenity 1/15/2008 Increase campsite fee from $8 to $10 per night. Planned accomplishments include:
  • Replacing 10 picnic tables
  • Repairing water system
  • Replacing 10 fire rings
  • Repairing visitor information bulletin board
  • Replacing all barriers
  • Repairing access road.
5/18/2008 (Season Opening) Picnic tables and fire rings have been purchased and will be replaced in 2009. Some work was conducted on the water system, however additional work is needed. Vehicle barriers were replaced, and visitor information signing was repaired.
FS Mendocino North Fork CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $5 per night Annual operation and maintenance includes maintaining cleanliness, pumping toilets, and providing supplies. 01/30/09 Work planned associated with fee increases at this site has been accomplished.
FS Mendocino Plaskett CG Expanded Amenity 1/15/2008 Increase campsite fee from $8 to $10 per night. Annual operation and maintenance includes maintaining cleanliness, pumping toilets, and providing supplies. Improvement funded by the Glenn County Recreation Advisory Committee will be completed and include concrete table and pads, new fire rings, new signing, new information kiosks, redesigned interior camping slips, some pull-thru, paved access roads and graveled in camp slips.  Information and directional sign will also be replaced. A 2008 Capital Investment Program project will complete roadway and parking spurs chip seal. 6/2/2008 (Season Opening) All materials have been purchased, tables have been installed. The reminder of the work is scheduled for completion in 2009.
FS Mendocino Saddle Camp CG Expanded Amenity 1/15/2008 Increase campsite fee from $10 to $12 per night. Planned accomplishments include:
  • Repainting toilets
  • Repairing fee station signs
  • Replacing parking barriers
  • Replacing six wooden picnic tables with concrete tables.
5/18/2008 (Season Opening) Fee station has been repaired and barriers have been replaced.
FS Mendocino South Fork CG Expanded Amenity 1/15/2008 Implement a new fee of $5 per vehicle per night Planned accomplishments include:
  • Repainting toilet door
  • Replacing two fire rings
  • Replacing seven picnic tables with concrete tables.
02/12/09 All work associated with this site is planned for completion in 2009.
FS Mendocino Spillway CG Expanded Amenity 1/15/2008 Increase campsite fee from $10 to $12 per night. Planned accomplishments include:
  • Replacing five fire rings
  • Repairing fee station sign
  • Replacing parking barriers
  • Replacing six wooden picnic tables with concrete tables.
5/18/2008 (Season Opening) Fire rings have been replaced, and picnic tables have been purchased with planned installation in 2009 upon site opening.
FS Mendocino Stirrup CG Expanded Amenity 1/15/2008 Increase campsite fee from $10 to $12 per night. Planned accomplishments include:
  • Repairing fee station sign
  • Replacing four wooden picnic tables with concrete tables
  • Replacing parking barriers.
5/18/2008 (Season Opening) Fee station signs were replaced in 2008. Picnic tables have been purchased and will be installed in 2009 upon site opening. Barrier replacement is scheduled for 2009.
FS Mendocino Dixie Glade CG Expanded Amenity 1/15/2008 Implement a new campsite fee of $5 per night Planned accomplishments include:
  • Replacing two fire rings
  • Replacing three pedestal grills
  • Replacing toilet
  • Replacing five picnic tables with concrete tables.
5/9/2009 (Season Opening) Picnic tables for this site have been purchased and will be installed in 2009 upon site opening.
FS Mendocino Sycamore Grove CG Expanded Amenity 1/15/2008 Increase campsite fee from $12 to $16 per night, double site fee of $30 per night, sites with partial hookups $25 per night. Free boat launching. Planned accomplishments include:
  • Painting and staining comfort station
  • Maintaining irrigation and potable water systems
  • Replacing picnic tables
  • Replacing pedestal grills
  • Repairing information kiosk
  • Replacing barriers
  • Maintaining campground pavement
  • Maintaining lawn care equipment
  • Maintaining signing.
05/12/08 All planned accomplishments at this site have been conducted, except for painting of comfort station and maintaining campground pavement. Both of these items have not demonstrated need for work at this time.
FS Mendocino Lake Red Bluff Boat Launch Expanded Amenity 1/15/2008 Implement a new boat launch fee of $6, $30 annual pass, campers at adjacent campgrounds launch for free. Planned accomplishments include:
  • Adding security lighting
  • Maintaining parking area
  • Replacing barriers
  • Improving signing.
Fee has not been implemented Note: Fees will not be implemented at this site until a determination is made by U.S. Bureau of Reclamation regarding maintaining a lake level at this site. Currently, the ramp is un-useable as BOR is not maintaining a lake at this location. Signing has been improved and barriers have been replaced.
FS Mendocino Sacramento River Boat Launch Expanded Amenity 1/15/2008 Implement a new boat launch fee of $6, $30 annual pass, campers at adjacent campgrounds launch for free. Planned accomplishments include:
  • Repairing toilet building
  • Maintaining parking area
  • Replacing barriers
  • Maintaining boat launch and lighting.
11/15/2008 Toilet building repairs have been accomplished. Barriers have been replaced and the boat launch ramp and associated lighting has been maintained. Parking area maintenance has not been necessary to date.
FS Mendocino Pine Mtn. Lookout Expanded Amenity 1/15/2008 Confirm implementation of recreation rental fee $50 per night. Maintain historic site by painting interior and exterior of buildings, replace wooden picnic table with a concrete table. 05/01/08 Toilet was pumped at this site. Revenue associated with this site has not been enough to conduct painting. Additional accomplishment that has become a priority is refinishing of the floor within the lookout.
FS Sequoia NF Troy Meadow Campground Expanded Amenity 11/6/2007 Increase campsite fee from $10 to $17 per night. Note: No change to the $5 extra vehicle fee. Planned accomplishments include:
  • Maintaining and improving signing
  • Maintaining CXT toilets
07/01/08 Continue to provide water sampling, and toilet pumping service. Painted 10% of the newly installed tables and provided 2 additional recreation techs to improve visitor services. Designing new templates to improve visitor information at fee sites. Annual maintenance of posters and information. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Sequoia NF Fish Creek Campground Expanded Amenity 11/6/2007 Increase campsite fee from $10 to $17 per night. Note: No change to the $5 extra vehicle fee. Planned accomplishments include:
  • Maintaining signing
  • Development of RV Dump Station
07/01/08 Continue to provide water system sampling and toilet pumping services, repaired 2 restrooms and provide 2 additional recreation techs to provide visitor services
FS Sequoia NF Kennedy Meadows Campground Expanded Amenity 11/6/2007 Increase campsite fee from $10 to $17 per night. Note: No change to the $5 extra vehicle fee. Planned accomplishments include:
  • Maintaining signing
  • Replace existing vault toilets with CXT vaults
07/01/08 Continue providing water system sampling, toilet pumping services, repaired 4 restrooms, and provide 2 additional recreation techs to provide services. Designing new templates to improve visitor information at fee sites. Annual maintenance of posters and information. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Sequoia NF Lower Peppermint Campground Expanded Amenity 11/6/2007 Increase campsite fee from $14 to $17 per night. Note: No change to the $5 extra vehicle fee. Planned accomplishments include:
  • Review adjacent dispersed area to determine best approach to reducing environmental impacts.
07/01/08 Continue to provide water system sampling, trash service, and toilet pumping services. Annual maintenance of posters and information. Designing new templates to improve visitor information at fee sites. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Sequoia NF Horse Meadow Campground Expanded Amenity 11/6/2007 increase campsite fee from $10 to $17 per night. Planned accomplishments include:
  • Maintaining signing
  • Replace existing vault toilets with CXT vaults
07/01/08 Continue to provide water system sampling, toilet pumping service, painted 25 % of the tables, cleaned out fire rings, and marked hazard trees and provide 2 additional recreation techs to provide services. Designing new templates to improve visitor information at fee sites. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Sequoia NF Camp 9 Family Campground Expanded Amenity 11/6/2007 Increase campsite fee from $12 to $17 per night, day use from $5 to $10, Annual day use pass from $25 to $50, RV dump from $8 to $10. Note: No change for $5 extra vehicle fee or group sites 3-11 and campers do not pay for day use. Planned accomplishments include:
  • Perform road maintenance
  • Replace vault toilet with new CXT (when funding becomes available)
07/01/08 Continue to provide water system sampling, toilet pumping service and trash service. Replaced rock fire rings with new metal rings with grills. provided site specific signing, additional trash dumpsters and portable toilets, painted fee stations, information boards, and restrooms. Performed emergency repairs and maintenance on RV dump station following vandalism, repaired restrooms, replaced hose bibs, and cleaned public launch ramp and kept it serviceable. Installed irrigation for newly planted trees. Provide 1 additional recreation tech to provide services at the camp. Ordered accessible portable toilet. Bought a sweeper attachment for the Bobcat to perform keep pavement fee of sand and other debris. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Sequoia NF Camp 9 Group Sites 1 & 2 Expanded Amenity 11/6/2007 Increase group campsite fee from $110 to $160 per night, day use from $5 to $10/day, Annual day use pass from $25 to $50, RV dump from $8 to $10. Note: No change for $5 extra vehicle fee and campers do not pay for day use. Planned accomplishments include:
  • Road maintenance work
  • Maintaining shade shelter
  • Adding picnic tables & campfire rings
  • Purchase & installation of CXT vault toilets (as funds become available)
07/01/08 Continue to provide water system sampling, trash service, toilet pumping service, improved site layout by removing excess asphalt paving and reconfiguring the living area, replaced 3 fire rings, installed a new shade structure. Provide one additional recreation tech to provide visitor services at the camp.
FS Sequoia NF Big Meadow Cabin Expanded Amenity 1/15/2008 Increase recreation rental fee from $100 to $125 per night. Planned accomplishments include:
  • Replace waterline from well and tank
  • Replace roof
07/01/08 Replaced water tank with temporary, above ground tank. Archeological survey has been completed, waiting for the report. We have not received any comments on the fee increase. The facility is booked all season.
FS Sequoia NF Camp 4 1/2 Cabin Expanded Amenity 1/15/2008 Increase recreation rental fee from $75 to $100 per night. Planned accomplishments include:
  • Install new water tank and waterlines
  • Re-align sewer pipe
07/01/08 Repaired plumbing. Archeological survey has been completed, waiting on the report. No one has mentioned the fee increase. We have not received any comments on the fee increase. The facility is booked all season.
FS Sequoia NF Oak Flat Lookout Expanded Amenity 1/15/2008 Raise recreation rental fee from $35 to $50 per night. Planned accomplishments include:
  • Perform road maintenance
  • Replace vault toilet with new CXT (when funding becomes available)
07/01/08 Graded the road to the look-out. No comments on fee increase.
FS Sequoia NF Forks of the Kern Private Boater Permit Special Recreation Permit 1/15/2008 Increase permit fee from $2 to $10 for a non-refundable permit application fee to participate in the Forks Run on the Kern River. Continue to cover a portion of the costs associated with administering the drawing, including:
  • Processing the applications
  • Conduct the pre-season drawing
  • Mailing out permits to successful applicants
  • Maintain private boater permit informational signing.
01/01/09 The drawing was held after May 1. Letters have gone out to applicants advising them of the results. No comments on the increased fee from drawing participants. There were 26 participants this year, up from 2008 (23 participants), and 2007(9 participants).
FS Sequoia NF Lake Isabella - Area Fee Standard Amenity 6/25/2008 Increase fee for day/overnight use from $5 to $10, annual pass from $35 to $50, add a new second vehicle pass of $10/year, extend fee to year round, and RV dump fee from $7 to $10. Planned accomplishments include:
  • Install CXT toilets
  • Add picnic tables
  • Replace water system holding tank and distribution lines
  • Designate parking spurs at sites above the high water mark
09/29/08 South Fork Recreation Area pressure tank has been replaced and the water system has been returned to service. Ordered accessible portable toilets for all 3 sites. Successfully competed for a FDAS grant for 8 SCA interns to provided additional visitor services. 4 Interns will be working out of the Kern River District in REA fee areas.
FS Shasta-Trinity NF Mt. Shasta Summit Single Climb Permit Special Recreation Permit 11/6/2007 Increase permit fee from $15 for three-day climb to $20 in 2008. Increase permit fee from $20 to $25 in 2010. Annual permit remains $30. Planned accomplishments include:
  • Maintaining the Mount Shasta Avalanche Center
  • Keep automated climbing advisory up to date
  • Update Mount Shasta climbing web site
  • Provide climbing rangers
  • Maintain partnerships with the National Weather Service, U. S. Geological Survey, and Friends of the Mount Shasta Avalanche Center.
4/2008 Increased presence of climbing rangers. Painted bathroom at Bunny Flat. Continued to update the web site and Mt. Shasta Avalanche Center. Continue to maintain partnerships with NWS, US Geo Survey and Friends of the Mt Shasta Avalanche Center.
FS Shasta-Trinity NF Forest Glen Cabin Expanded Amenity 6/25/2008 Increase fee from $35 to $75, and recommend FS consider implementing an off season rate during shoulder season to encourage use & increase occupancy. Planned accomplishments include:
  • Have someone come in weekly to clean the cabin when used.
  • Create an additional tent pad.
  • Purchase a picnic table.
  • Insulate pipes in the bathroom and repair the shower.
  • Develop interpretive & educational messages regarding the history of the area.
Planned for 6/1/2009 When the cabin was available, FY2008 fee revenue were used to clean the restroom and shower facilities and to perform routine maintenance (painting etc.). The cabin was closed to the public due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Post Creek Lookout Expanded Amenity 6/25/2008 Increase fee from $35 to $60, and recommend FS consider implementing an off season rate during shoulder season to encourage use & increase occupancy. Planned accomplishments include:
  • Increase frequency of cabin cleaning.
  • Maintain the garage.
  • Install a solar panel for lights.
  • Create a tent pad.
  • Install a water tank to be used for fire safety.
  • Develop interpretive & educational messages regarding the history of the area.
Planned for 6/1/2009 When the lookout was available, FY2008 fee revenue were used to clean the facilities and perform minor maintenance. The lookout was closed to the public due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Girard Ridge Lookout Expanded Amenity 6/25/2008 Increase fee from $35 to $75, and recommend FS consider implementing an off season rate during shoulder season to encourage use & increase occupancy. Planned accomplishments include:
  • Have someone come in weekly to clean the cabin when used.
  • Replace large beams damaged by dry rot.
  • Brush removal along last ¼ mile of access road.
  • Grade the last ½ mile of road past the gate.
05/01/09 FY2008 fee revenue were used to clean the facilities regularly and perform minor maintenance (painting etc.). Fee revenue were also used to replace the struts (the foundation for the lookout building).
FS Shasta-Trinity NF Harris Springs Guard Station Expanded Amenity 6/25/2008 Increase fee from $35 to $75, and recommend FS implement an off season rate during shoulder season to encourage use & increase occupancy. Planned accomplishments include:
  • Have someone come in weekly to clean the cabin when used.
  • Repair the septic system.
  • Paint the building.
  • Complete roof repairs.
05/01/09 FY2008 fee revenue were used to clean the facilities regularly and to perform minor maintenance (painting etc.).
FS Shasta-Trinity NF Little Mt. Hoffman Lookout Expanded Amenity 6/25/2008 Increase fee from $35 to $75, and recommend FS consider implementing an off season rate during shoulder season to encourage use & increase occupancy. Planned accomplishments include:
  • Have someone come in every 2 weeks to clean the lookout when used.
  • Repair window sills damaged by dry rot.
  • Paint the lookout.
05/01/09 FY2008 fee revenue were used to clean the facilities regularly and to perform minor maintenance (painting etc.).
FS Shasta-Trinity NF Burnt Ranch Campground Expanded Amenity 6/25/2008 Increase fee from $8 to $12, winter rate of $8, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments at the double site include:
  • Replace vault toilets with CXT
  • Replace water distribution lines (within campground)
  • Repave road and parking spurs
Planned for 6/01/2009 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF AH-DI-NA Campground Expanded Amenity 6/25/2008 Increase fee from $8 to $10. Planned accomplishments include:
  • Refurbish flush toilet
  • Improve access and campground road system
  • Replace picnic tables & campfire rings
  • Develop new water source
05/01/09 FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.).
FS Shasta-Trinity NF Basin Gulch Campground Expanded Amenity 6/25/2008 Increase fee from $6 to $10, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace picnic tables
  • Increase garbage collection from two days/week to four days/week
  • Develop interpretive & educational messages regarding appropriate OHV & Tread Lightly land use ethics
  • Develop host site and recruit host
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Big Flat Campground Expanded Amenity 6/25/2008 Increase fee from $8 to $12, winter rate of $8, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Improve and repave access roads and spurs
  • Replace water distribution lines (internal campground)
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Camp Four Group Campground Expanded Amenity 6/25/2008 Increase fee from $15 to $30. Planned accomplishments include:
  • Rehab the campground road
  • Add picnic tables
  • Develop a well & add hand pump
  • Add fire rings and pedestal grills
  • Dust abatement treatment
01/01/09 FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.).
FS Shasta-Trinity NF Cattle Camp Campground Expanded Amenity 6/25/2008 Increase fee from $12 to $15. Planned accomplishments include:
  • Replace toilet with CXT
  • Replace barriers
  • Develop trail to tie into the McCloud River Trail (¼ mile)
05/08/09 FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.).
FS Shasta-Trinity NF Forest Glen Campground Expanded Amenity 6/25/2008 Increase fee from $6 to $12, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace picnic tables
  • Maintain Klamath Stoves (BBQ)
  • Increase garbage collection from two days/week to four days/week
  • Develop interpretive & educational messages
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Fowlers Campground Expanded Amenity 6/25/2008 Increase fee from $12 to $15. Planned accomplishments include:
  • Replacing 3 toilets with CXTs
  • Resurface parking spurs
  • Remove hazard trees
05/01/09 FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.).
FS Shasta-Trinity NF Hayden Flat Campground Expanded Amenity 6/25/2008 Increase fee from $10 to $12, Group site from $30 to $40, winter rate of $8, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replacing 1 toilet with CXT
  • Full replacement of water distribution lines
  • Repave the campground road system
  • Install bear proof food lockers
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Hell Gate Campground Expanded Amenity 6/25/2008 Increase fee from $6 to $12, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Replace picnic tables
  • Upgrade a site to fully meet ADA standards
  • Increase garbage collection from two days/week to four days/week
  • Develop interpretive & educational messages regarding our unit's forest restoration program
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF McBride Springs Campground Expanded Amenity 6/25/2008 Increase fee from $10 to $15. Planned accomplishments include:
  • Replace picnic tables
  • Replace fire rings
  • Install bear proof garbage cans
  • Resurface parking spurs
07/01/09 FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform routine maintenance on the amenities (painting etc.). Note: Opening is delayed due to hazard tree removal necessary prior to opening.
FS Shasta-Trinity NF Pigeon Point Campground Expanded Amenity 6/25/2008 Increase fee from $8 to $12, Double sites from $12 to $15, Group site from $50 to $75, winter rate of $8, extra vehicle fee of $5 for any vehicle that cannot be reasonably parked in campsite spur on surfacing. Planned accomplishments include:
  • Construct walkway between boat ramp and group campsite
  • Complete landscaping
  • Construct a low water boat ramp
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.
FS Shasta-Trinity NF Sims Flat Campground Expanded Amenity 6/25/2008 Increase fee from $12 to $15. Planned accomplishments include:
  • Repave road and parking spurs
  • Replace 2 flush toilets
  • Reconstruct paved walkway to Hazel Creek
  • Replace tables & grills
05/07/09 FY2008 fee revenue were used to perform clean restrooms, pick up garbage and test water regularly and to perform minor maintenance on the amenities (painting etc.).
FS Shasta-Trinity NF Skunk Point Group Campground Expanded Amenity 6/25/2008 Increase fee from $30 to $40. Planned accomplishments include:
  • Replace vault toilet with CXT
  • Replace tables
06/01/09 When the campground was open, FY2008 fee revenue were used to clean and stock restrooms, pick up garbage and test water systems regularly and to perform minor maintenance on the amenities (painting etc.). The campground was closed due to fires for an extended period of time in FY08.

This information was presented at the RRAC meeting held May 13, 2009 at the Regional Office in Vallejo, CA