Projects & Plans
Rubicon Trail Easement and Resource Improvement Project
The Eldorado National Forest will prepare an environmental impact statement (EIS) to issue an easement to El Dorado County for a right-of-way for the Rubicon Trail, where it crosses National Forest System lands within the Eldorado National Forest, which will allow the County to conduct ongoing maintenance within the right-of-way and ensure County responsibility for actions within the easement.
The EIS will allow the Forest Service to issue other authorizations to El Dorado County as necessary for the following actions; the construction of a new bridge at Ellis Creek, replacement of the FOTR bridge, construction and installation of vault toilets, construction of erosion control features as described in the Rubicon Trail Saturated Soil Water Quality Protection Plan (El Dorado County Department of Transportation, December 14, 2010) from Little Sluice to the County line, rehabilitate and close specified unauthorized routes, and install a vault toilet.
The proposal will also analyze the construction of a new bridge at Buck Island Reservoir Outlet, the designation of parking areas and the addition of unauthorized routes in proximity to the Rubicon Trail to the National Forest Transportation System (NFTS) to provide permanent access to important dispersed recreation areas.
Note: You can now comment online from the Schedule of Proposed Actions Rubicon Project page. (links to external site)
Documents
IMPORTANT: The latest version of Adobe Acrobat Reader should be used to view these PDF documents. It is available at the website link below. If you are having problems viewing the maps, be sure to install the latest version of the Acrobat Reader. Adobe Acrobat Reader is free and may be downloaded from: http://get.adobe.com/reader/.
Public Meetings Archive
- September 28, 2011: Open House - Scoping Phase - Wednesday, 5:00 pm to 8:00 pm, Supervisor's Office, 100 Forni Road, Placerville, CA 95667
|
|