|
Northern
Rockies Competitive EERA Solicitation Plan (updated 11/29/09)
2010 Timeline for Northern Rockies
competitive EERAs (updated 11/19/09)
Information Required
at Check-In
Performance
Rating for all Contract Equipment
2009
Northern Rockies Dyed Fuel Policy
Contractor
Performance System (CPS) Registration
2009 Wage
Determination
eAuthentication
- Upgrading from a Level 1 to Level 2 Account
US
Forest Service National Soliciation Templates
** It is important to note that this
information does not guarantee that you will be hired. The
number, size and complexity of fires varies by season as does
the need for contract equipment. Additionally, you should
be aware that in most cases not all types of equipment are
needed for all emergencies. The equipment that is used/hired
is solely dependent on the nature of the emergency and the
factors (such as terrain, weather, and safety factors) that
exist surrounding the emergency. **
|