Two reroutes totaling ~1100' to put trail above flood height; may include rock steps and waterbars. Replace washed out bridge over an unnamed tributary to 19 Mile Brook. May include bridge over other unnamed tributary. Removal of old bridge remnants and rehab old trail tread.