You are here: NEPA Home / Willamette National Forest NEPA Projects / Patjens Reroute
To reroute approximately 3 miles of Patjens trail. This would require cutting trees (<12") in the proposed trail prism (96" wide) and disturbing the ground via tread construction (18-22" wide).
Patjens Trail (Tr. No. 3395) near Patjens Lake
District: McKenzie River Ranger District