Install 11 miles of underground fiber optic cable within the right-of-way of Hwy 94, from Shingleton south to County Road 437. Construction methods would include vibratory and static plowing, directional boring, and aerial.
Location Summary
Along 11 miles of the Highway 94 corridor from Shingleton south to County Road 437.
Districts: Rapid River Ranger District, Manistique Ranger District, Munising Ranger District