DCP will construct two 4inch natural gas pipelines; one high pressure steel line, one low pressure poly pipe, to the EOG-Arbalest 53-33H well to tie into their existing 4inch high pressure line. Less than 5 acres of NFS lands.
Location Summary
Approximately 6 miles north of the Jenny Trail Hwy 59 Junction then approximately 3 miles east of Hwy 59.
District: Douglas and Thunder Basin Ranger District