Rock Creek Pipeline and Stock Watering Trough

Fencing out a spring, installing a collection basin and installing 1000 feet of 1.25 inch pipeline and 2 tan fiberglass stock watering troughs with float valve shut-offs. Pipeline will cross steam at one point. Purpose is to reduce riparian grazing impacts.

Location Summary

South Willow Creek - Tobacco Root Mountains

District: Madison Ranger District

Project Documents