Tuesday AM Notes (FS only):

Introduction and Meeting Objectives

Agenda Review
Brief Overview
Brainstorming of the BIN Topics  - (See list of topics at end of these notes)

Telecommunications Management Process (USDA) - Jayne Handley

    H/O -1:Proposed FS Centralized Telecommunications Management Plan
    H/O - 2: USDA Telecommunications Program (Overheads)
    Draft management plan is in the USDA for review. John Gavin, new WO employee
    will be trained to be the dedicated WO DAR.
    WO only ones able to place dedicated circuits, Phone Cards etc. at the
    R/S/A/I.  DAR s must share the information with others in the R/S/A/Is.
    Cleveland Barnett is an Interim DAR for WO.
    Each location needs to provide the A76, benefit cost analysis, the
    optimization process for USDA etc.
    Line Officer must sign off on the identified telecommunications need.
    DAR will place orders for FTS 2000 cards, and review the circuit orders.
    DAR s - What is the impact of this?
    WO Dedicated DAR will have authority to place orders (The Only Place)
    Broader coverage than  just FTS Orders 
    Interagency Sharing process will be thru the USDA.  
    FS will probably be the lead agency on many of the interagency sharing
    sites.  
    ***Last week - Request for Agencies within 30 miles -  About 50% of  the
    sites will require USDA involvement.  For other agency coordination, we must
    be proactive: Which Agencies are within 30 miles, Where, What Services
    Needs, Future Plans by agencies: FS, FSA, NRCS, and APHIS, etc., Contacts,
    Addresses, etc.  USDA to make the decisions about the interagency sharing.
    Start with the biggest of the biggest offices first on a priority basis.
      USDA will MAKE the decision on ALL Telecommunications interagency sharing
    sites. 

 Job Corps Center (JCC) System  Requirements Department of Labor  (DOL) 
    - Linda Goodman, Wilma Vialpando, & Peter  LaNore
    DOL wants a common computer system at all JCC sites.  JCC Systems to have a
    common records application.  There are 18 JCC with an average of 50-65 +/-
    employees each (about 1/3 of staff works nights).   DOL will pay for site
    preparation and systems. 

    Internet access to every classroom and dormitory in JCC. Get Connected (GS)
    computers are for the enrollees.   Plans to have fiber optics installed by
    DOL.
--------------------

    Note:  Handouts = H/O

    FS must fund the JCC IBM technology.  
Integrated 615/CIS Systems Overview (See H/O - Distributed to impacted Regions)

    DOL s CIS System is also IBM.  DOL Requires PC based Workstation,  DOL
    Application S/W will not run on the Xterminals.  Servers are small
    Workstations (53P - small servers).  DOL pays for things needed for the DOL
    JCC processing.

Accessibility Technology - Len Vancil and Dennis Keaton

    H/O 3: See Attachment to Meeting Agenda.

    IBM has proposed hardware from IBM Contract.

    Individual sharing by various individuals about their needs  

    Bonnie Ainsworth, Resource Clerk, Medicine Bow NF (R02F06A)
    Uses voice synthesizer, TV interface and screen reader for materials,
    currently  uses CEO_Connection for interface for DG special permit
    preparation.  Being able to set contrasts on the device is important. Glare
    issues are also important.  Be specific to identify each individuals needs.
    "Pathfinders:W01B"

    We need to be aware of the training  needs for accessibility employees.

    Plan is to add accessibility items to the IBM Contract. USDA Target Center
    is involved in the acquisitions.

National Application Migration Project (NAMP) and Year 2000 - Steven Deep

    H/O 4: - NAMP Update 5/13/97
    H/O 5: - Overhead Summary 

    Working on the DG to IBM platforms.
    WO IS&T Meetings with Sponsors are complete.

    Paycheck application on the IBM  has been working for 3 paychecks and will
    distribute end of May for the IBM Users (EMAIL).  Will have some
    enhancements.  This phase will  use DG Concentration points for time being.
    
    APOS/PWPS will be distributed later this 
    *** We should quit all of the DG Updates! ***
    Training module (TIPS) is a priority for IBM Platform.
    "Porting" to the IBM will be a norm for many of the DG Applications
    *** All WO employees will be on the IBM by End of September, 1997. ***
    Question:  Will DG travel go to the Microcomputer platform?  Being looked
    at, but process for distributing the software is an issue.   There are no
    current plans for a national PC application of any kind right now.
    Travel Card program (PCMS Application) will be implemented but not
    especially on  a PC platform. NFC says they are ready to release the
    application.  Some proprietary software issues, (require third party
    software). Licensing is an issue for the end-user.  Jack A. "We will not be
    upgrading PC s to implement this application, however"

    H/O 6: - Year 2000 Overheads - See Overheads for information.
National Application Development Process / Checklist - Jayne Handley / Steven
Deep

    H/O 7: - Draft FSM 6620 - Computer Software Management (Dated: 5/12/97).

    Region 6 has agreed to provide a handbook for Application Developers  and
    provided an FSWEB Site for this Checklist process for use by developers and
    contractors.  *** We do need to remember that new development requires
    Technical Approvals ***

    IMCG will also be commenting on the 6620 Draft

    Checklist will be used for ALL future S/W releases.

    Process will use a common way of doing the Charter, Life Cycle, A11, Process
    Flow, and Technical Approvals linked together as a progressive way of
    updating reports.  The information Management Repository would be used as a
    place to keep the historical records on each development.

Tuesday PM Notes (FS/BLM):

Demonstrations (Joint FS/BLM)  @ BLM State Office

Tuesday Evening Discussion Notes:

    Informal "Adhoc"  Applications

    For information that is not to be released as an officiallly supported
    application or software,  items like template, formats, short process for a
    simple process, not requiring a database or long-term application to be
    developed.  
    Provide a process to put this type of material on the R/S/A/IWO FSWEB page,
    with retrieval instructions, an abstract for Intranet use.

    Intranet Policy:

    Intranet Software will be released in a week or so.  (See Daily Operating
    Guide)
    Draft policy to be done.   
    Question:  Can we make Intranet be a vehicle for changing the way we do
    work?  (Instead of using Distribution Lists "Mailing List", etc.)
    Ways to find new material will be important.
Use care in routing people on the Internet to other WEB sites.  (
    *** Caution

IBM Concerns Discussions:
    Are we, as an agency, prepared to do this implementation, let alone the
    policies and procedures to implement it? (Such as Microcomputers, Internet,
    IntraNet, etc.)

    *** "It is not acceptable to wait on installations of IBM Technology once it
    is delivered.  
    Management of IP Addresses for the FS is a weak point  (Recent filling of 2
    WO Telecommunications  vacancies will help with this issue.)

Training:

    Applix 4.3 has many changes,  there is a good document that shows these
    recently distributed to the field.  Training documentation will need
    changes to reflect the changes in the menu, and look and feel.

    General Users will probably require about 3-4 days of training to be
    sufficient with the IBM . The range in amount varies from about 2 days to 8
    to 10 days depending on Regional location and approach.  

Radio Frequency Allocation/ Spectrum Changes:

    There is not a priority yet in the WO for implementation of the
    "narrow-banding" of FS radios.

 Organizational Considerations:

    *** Workforce reductions are having significant impacts.  Jack Arthur is
    talking to the NLC about this.  
    Information Management  Changes
    Differences in Management Philosophy
    Need care in the FOIA information releases done through the Intranet and
    Internet.

E-mail Discussions:

    Capture message or information items of broad general interest and put on
    the Intranet or the local system bulletin board.
    More filters are needed of  conversion of documents between the DG, PC  and
    other systems to allow for two way flow from and to the IBM Systems.  
    We need to appeal to employees to change the old habits.    *** Do this at
    the E_Mail overview training for new users. 
    ***Provide updates for all directives on the Intranet.
    Regional FSWEB Home page should reference the WO FSWEB also. 
    People locator (Directory) could be automated and put on the IBM System.
    Open Mail is powerful and has capability to resolve the addressing issues.


Wednesday Meeting Notes (FS/BLM):

BLM/FS Common Views: - See the FSWEB page for summaries of Overheads and
presentations 

BLM Overview - Gayle Gordon, CIO, BLM

    About 20 BLM personnel attend this combined meeting.  BLM has about 10K
    employees, 65% started out on AIX and 35% on Microcomputers.
    All Administrative applications are on the IBM platform.  Some of these are
    PC based for a total of 11 systems.
    BLM has been involved with a study of staffing and skill assessment.
    Results?  Core competencies?  Connectivity has been an issue?
    BLM had additional funding for the implementation of technology.  (Certainly
    not the case with the FS- Why Not?)
    Some questions related to BLM were, what should we manage centrally verse
    decentralized?  Are Staff adequately trained to do there jobs?  Do we have
    an adequate mix of staff and contractors?
    BLM uses an IRM Board for advice and counsel on information technology.
    Related to internet, BLM has a "push/pull experiment ongoing related to data
    across the firewall and sharing with others.
    Security is  a balancing of access and protection, and weighing of the
    "trusted user"  seeking appropriate consistency.  
    BLM uses the Intranet for directives 
    FS/BLM Goals:  
         Complimentary Systems
         Integrated Data - Sharing emphasis verses exchanging data.  A Big
         difference!
         "Single face to our customers"

FS Overview: - Jack Arthur

    The FS has about 32K employees.  
    FS Issues include:  Installation and Conversion from the DG to IBM, Office
    Automation (AO) replacement , Internet Protocol (IP) Addressing, Conversion
    and Migration of Applications  (Referred to by BLM as Rehosting of
    Applications verses Business Process Engineering (BPR) or Conversion,
    Implementing of the GIS Capabilities, dealing with oversight and reviews and
    Standards.
    Joint FS/BLM Goals:
    FS Budget is in the same appropriation as BLM Interior and Related Agencies
    Appropriation
    Oversight from USDA
    Joint Sharing is occurring at surface level, cooperation is evident, but
    deeper sharing is needed (Interoperation).
    FS can t be isolationists
    Key words are:  Share, interoperability, cooperation, lesson learned, and
    common systems.
    Opportunities for joint efforts:  See FSWEB Page for summary ( This should
    happen during the week of May 19th.)

IBM & ALMRS Overview - Dave Little, BLM / Al Flesh, FS

ALMRS:
    E-Foia being meet in the BLM with Public viewing rooms in a limited number
    of offices.  
    BLM is providing context sensitive online help for BLM rehosted applications

    ALMRS is being expanded for nationwide use by adding land survey types to
    cover the nation.   ALMRS will be implemented over a two year phase-in
    situation.  (Depends on funding from Congress.)

IBM:

    Original Contract was awarded in February, 1995
    Issues discussed included; how do we decide who gets PC s?   Initially we
    will need some common use PC s in each office for those items that will
    reside only on the PC.
    Some PC s will be at every office.
    BLM is leaning toward a AIX/Windows NT or Win95 scenario for the future.
    *** Windows NT has a large security issue  *** 
    AutoCAD will not be supported on the AIX Platform after Release 14.
    Future will see WEB accessibility for applications
    Dealing with ITMRA implications  (Information Technology Management Reform
    Act)
    We must resolve the DCE/DFS differences between the agencies.
    DC/DFS is a given for the FS in the integration of PC s 
    "A business need is Interagency Sharing"


Office Automation -Meeting the Basic Business Needs of the Agencies - Glenn
Coffman, BLM / Mickie Marjerison, FS

    BLM:

    Issue in BLM of differences / inconsistencies between the PC and AIX
    versions.  BLM is looking at a "suite" environment for the future.
    Agency is moving to 100 Base T networks in offices.
    Wants to have a dual platform in the agency by 1999. (There is more than
    that now).
    Engineers are using other Unix boxes for applications.
    BLM uses a Configuration Management Board related to Information Technology
    (IT) investments.

    FS:

    FS AIX -  More filters coming for the Applixware.
    *** Explanatory Notes for the WO PD&B were prepared in Applix ***. 
    IBM linked Oracle to Applix.
    Presentation Package (MS-like) comes with the Applix S/W for PC s.
    **** We need to share templates for Applix***  like R10 EIS templates.

    Joint efforts / common goals discussion:

    Issues to be deal with   (see FSA WEB Page for topics)

GIS Overview - Chris Hamilton/ Dale Guenter, FS

    Discussion about the Pacific Northwest . Intergovernmental Resource
    information Coordinating Council, the Interior Columbia Basin Ecosystem
    management Project and the Central Oregon initiative having to do with
    experiences 


    Technical Issues to facilitate Future FS/BLM Coordination

    "Firewalls"
    FTP Sites and Data Exchange Clearinghouse.
    FGDC compliance to Metadata EO.  (Have a common Metadata Application
    on-board)
    E_Mail Connectivity and Directory
    Integrated Platforms (Operating Systems)  - DCE /DFS Integrated Applications
    MOU between agencies at lower levels to build on National MOU s.
    Coordinated "Core" Standards for data.
    Flexible applications for use by both agencies.  (Law Enforcement )

    Management Issues - 

    Clear objectives
    Resolve cultural and organizational differences
    Evaluate Interagency GIS workload.
    Look at data standards costs (Centralized Data Storehouse for both agencies)
    Collocation of Offices

Thursday Notes (FS):

IRM Planning Discussions - Jack Arthur

    The business of IS&T related to Information management.  Our role in
    managing and facilitating information as related to the IM Framework Report,
    in addition to the implementation of  the IBM technology.  Two roles are
    developed respectively, Chief Information Officer (CIO) verses Chief
    Technology Officer (CTO).   

    IRM planning now primarily relates to the technology implementation.   We
    need to view the extent of the job we will focus on in the future.  IRM
    should not be a "motherhood" but should be results oriented or direction
    setting.  

    TA's, B/C, project plans may be the connection between these roles.  The
    overall strategic roles of IS&T personnel in this effort maybe to clearly
    identify the significant impacts of application / systems development and
    how this information is disseminated throughout the FS.  IS&T needs to be an
    integral part of the advice and counsel provided to FS management (Line).
    Staff work from IS&T is needed to inform the managers to help set realistic
    expectations at a national level.  (Providing a framework for change in the
    future). 
    What is the forum for real IS&T input to the future of systems?  

    Potential resolution:
    
    Address through the A11 - an analysis of impacts of various initiatives
    gathered from a service-wide assessment as basis for input for future A11
    (Use current A11 as basis for ranking, costs, impacts, time-frames, etc.
    for basis of October Directors Meeting). 
    Installation DRAFT schedule dated 5.14.97 were distributed .  Items ordered
    in the 3rd round that do not require IBM Install will be shipped ASAP .  IBM
    is willing to ship these other items sooner, if identified.
    Approval for IBM Systems  by USDA is for next 20 months. (Through Round 6).

PC Integration - Mike Travis

    Topic was discussed on Wednesday Night
    Summary of previous discussion:
         *** We must have a Standard PC configura
         Policy to implement, Emulator is Exceeds (HBIRD), Standard look and
         feel.
         For PC Orders, buy the extra 1 MB of VRAM for Graphics Adapter and
         Higher resolution Monitor.
         Inventory Microcomputer to meet a minimum for resolution (Minimum of
         Platinum is a light weight DFS integrator running on the PC with
         connection to DFS server and AIX files, allows users to be  redirected
         to another server, if needed..
         PC Enterprise will be loaded on the AIX Server and downloaded to the
         Microcomputer.  OSE will provide instructions.
         Instruction for other loading will be needed, OSE will provide..
         Lexmark printers will support multiple streams of data. (Region 3 has
         one of these for testing, Color Laser is applicable for larger
         offices).
         Printer Que. management was discussed. Printer memory upgrades helps
         relieve the printer issue.
         Platinum will probably be used for printer management.
         Open Mail issues are being worked on.  Key is for consistency naming
         and addressing. .
         IBM Contract will allow for retro-fit of  existing PC's

Email Cutover -  Grant Dekker

    Current Situation -
    All RO's have gateways.
    More gateways needed
    All is not perfect.
    Some fixes are on the way.   Double click on .W42 to start an Applix
    document.
    FS bought the source code on the Mail*I software.
    We are all partners in the EMAIL cutover
    Gateway Configurations - 
    DG and OpenMail Server married in one cell.
    Large office easily tend toward getting saturated.
    More gateways are needed.
FS has 50 licenses for Gateway software.  
    *** Look at gateway traffic regarding mailing lists.  (Work to reduce the
    number of mailing lists that mail to multiple people to same site).***


EMAIL Issues to work on:

    Document Conversion - Use DG Cabinet_Converter instead of mailing.
    Disaster Recovery - TIB to allow gateway change will be provided /
    cooperation needed. 
    these documents and filing of these documents.
    Integrating / using Mail in FS Applications
    Support of gateways is labor intensive  "baby-sit"
    Managing rejects and time delays.
    Cookbooking things for user.
    Addressing issues *** notes for terminal helps is a potential ***
    Changing the model on how we use different techniques.
    Principles 
    Do what we can to keep gateways running
    Mail is not  a good conversion process.
    Change the model on how we use mail.

    Ways to reduce the Email cutover impacts
    
         Transitional issues sessions for new users, just before
         autoforewording.
         Management involvement  (Jim has an outline of sessions)
         Mailing list conversion or removal.
         Use of the FSWeb
         Fire cutover later in R1 - Preplanning important.  *** Standards for
         Guest profiles ***
          for users are being created by the OSE
         WO plans to do cutover by Staff and deputy area by September.
         Use of the IBM Staff profile - Mail once 
         When Backups are run, the Gateways are shutdown on the DG.  
         Hierarchical impacts of systems being down.
         Mail Node can be set up if it is critical for Research or a detached
         unit from the WO.
         A single name node for a forest is the expected "norm".
          (This doesn t mean a separate one for each ranger district).
         We must be role models for the Email changes.
         Consider a separate Email support function.
         File structure must be sent out ASAP!  *** Will be put on the FSWeb
         site as final - ASAP! ***
Telecommunications Requirements

    H/O  _ :- Near Term Network Architecture May 1997.
    H/O  _ : - Near Term Network Architecture Report - April, 1997

    John Gavin will be trained to be the dedicated DAR for the WO.

    Next Steps Discussions: 

    Redundancy based on the no. of "hops" (currently 2 hops)
    Costs related to this may be too high.
    Management Plan just received for this that will be distributed for review.
    Issue of connectivity to NFC and KCC and FCC and USDA Internet Access 
    Will the future USDA Network be a candidate for WCF Charge-back for
    Operation and Maintenance by the USDA?
    WO expects to agree with the USDA on the coordination roles at the local
    level.  

User Support and Training - Tim Quinn

    WO Support looking at possible contract support  
    Issues related to Help Desk Support:
         Lack of information (How  To s from DG/ IBM/etc.
         Lack of Skills
         Too Busy to get trained
         Lack of FTE s to do the work.
         How to use the products
         Hours of Operation

    FS Study of the Helpdesk with Help from IBM, recognized three levels of
    support required
         Local Office
         National Heldesk 
         Escalation to Vendor

    Helpdesk Alternatives Studied:

    Option 1
         Maintain the current structure
         Contract some, add a helpe

    Option 2
    Option 1 plus
    On line help agent (Aplication) 

    Option 3
    Direct Contact with IBM @ Boulder
         Downside is a trend away from the FS system management

    Option 4
         On -site consultants ($ cost)

    Option 5 
         1-800-access for all employees.

    Option 6 
         IBM do all of everything for the FS  DG, IBM, Intergraph, etc.

Helpdesk Discussion:

    WO might add some support to National Helpdesk
    WO works until 8 PM 5 days per week.
    Dollars an issue
    Many add to Web page
    Look for a software tool
    When does PC Call or a Network call come to the WO?  Same as any other.
    Calls to Help Desk should result in a Trouble-ticket No. and a contact for
    every call, or message.
    Plans are to provide access to the Oracle Help Desk application.
    A callback is expected by Tim.

Training: - Mickie Marjerison

    Looking for a standard rate per training day for IBM instructors per diem
    and travel. (All inclusive in rate $500. mentioned.)
    Seabelle Ball materials will be distributed. 
    Materials are verbose and will be placed on the FSWEB 
    Training Needs are not always well understood. 
*   ** It is OK to provide contract training to Cooperators and other agencies,
    etc.  but NOT our contractors - A legal issue!
    Be selective on skills of potential contractors.
    Online Training - AIX, Introduction to Oracle , Motif, and  C Programming.
    (Also, Networks were bought by R3).
    Training Room software may be helpful for training rooms.  (White board
    S/W)  - John Butler did original look at these.  WO will supply this
    information,.

IBM Contract Rounds 4, 5, & 6 Orders and Processes - Al Flesh

I   BM Update Round 4
    $ 47 Million of authority from the USDA
    Might need to add the PC costs to our estimates.
    Update of HMS will be done as soon as possible for Round 4 orders
    Contract modifications should be in place by Mid June.  
    Cost Performance will continue to be an issue for the future as it was in
    the past.  
    ***Microcomputer Requisitions will be separate from the IBM System purchases
    to ease shipping and distribution of Microcomputers***.
    All PC s will be managed under the Corporate environment just like X
    terminals were previously.
    Round 4 we will use same considerations as round 3 for sizing and cost
    performance. A stress test was performed that confirmed the configuration
    model.  
    Be aware of the number of simultaneous users for planning and configuring of
    systems.
    *** Maybe have a Round 4.5 about the beginning of September, 1997*** (7
    Million Ceiling)

Rounds 5 and 6 Status:

    See Handout for schedule.
    A second order cycle in FY 98 (Round 5.5) might start in February 1998.
    Might start deregulation of the ordering stuff, like Microcomputers  and
    Printers, etc.  after Round 4.
    All rules would still apply.
    ***We must be done by Round 6***.

 BIN Topics

    DG Disposal

         There are widely varying processes being used for disposal.
         GSA disposal is a long-term issue.  
         How disposal looks is an issue in many locations

    Brainstorm the PC Integration
    Discuss National Training Plans
    National File Structure and
    GAO Follow-up
         Security Plans, Disaster Plans, & Contingencies
    USDA Self Review
    DPA for PC s and Laptops (remote access)
    Image Analysis S/W
    Web Server Software
    Radio Frequency Reallocation 
    $ for NTIA for FY  97 Probably will be paid by the WO
    Recruiting Skills
    IBM Backup/Restore Issue
    IS&T Organizational Outlook
    GIS Interim Solutions
    Backups/Archiving

    Currently we operate under a "Moratorium" related to PC s.  Options were
    discussed.  Some issues were related to the IBM Contract options /
    modifications, etc.  How we could buy PC s for immediate needs.  WO has
    prepared a draft ID to replace the current ID with the $ 50K limit.
    Currently we could consider buying off the APHIS contract, but real issue
    may be the Laptops, not the Desktops, until the IBM Contract has been
    modified.  

    One Option would be more authority, but buying from existing USDA ISAP
    contract, like for an additional $50K of authority.  This will be done by an
    ID between now and the IBM contract modification.  It is not expected that a
    TA will be required for an IBM Contract Microcomputer acquisition.  These
    systems will be capitalized at time of acquisition.  

    Policy will not be to support all of the many creative ideas for all things
    to all people.  

    WCF for PC s
         We should expect to capitalize ALL of the Microcomputers added to the
         IBM Systems in the FS.
         Previous Micros also need to be added if it has system life remaining,
         per manual direction.


ACTION ITEMS FROM THIS MEETING

NO. ACTION:   DESCRIPTION         DUE DATE

1.  Each R/S/A/I needs to comment to Steven Deep on the DRAFT FSM 6620, as well
    as from the IMCG, by June 6, 1997. 

2.  We must have accurate number for all seats, systems, and expected finish
    date for IBM.  Be sure that Rounds 5 and 6 statistics are accurate at the
    Round 4 Meeting in June.  (All R/S/A/I/WO)

3.  All Telecommunication Needs for Rounds 5 and 6 are due in the USDA in
    September.  

4.  Richard Salazar will follow-up with Fiscal on the DG System disposal rules,
    that are currently in place.

5.  IRM Planning (Add some structure for review of the A11 Proposals). Team
    related to Development  Activities for October meeting  (Dennis, Ray, Bob,
    and Millie)  Charge is to take a look , using the WO "A11" materials, at how
    various initiatives can be evaluated and ranked  for the October Meeting)
    Ray Johnson, Dennis Keaton, Millie Otwell, and Bob Clayton

6.  IBM Contract  Installation DRAFT schedule dated 5.14.97 were distributed .
    Provide Input to Al Flesh by 5.23.97.  

7.  Each R/S/A/I needs to identify future gateway locations.

8.  Next Meeting - Dennis Keaton, FS Contact,  BLM is host for the meeting. 
    Joint with BLM in PHX in October 1997. 

9.  Submit Slides from this meeting to rholmes/wo for placement on the WO FSWEB.

10. TCOMA Planning with the USDA - WO do this next week

11. Work on the biggest sites first related to Interagency Sharing Contacts.!
    ***R3 needs to get up to date on the analysis tools that exist at USDA.
    (Training) ***.
    Do the 30 mile radius contacts at a minimum for round three- R/S/A/I. 
    Must have it May 19,1997 (Next  Monday) 

12. Accessible Technology - We need to watch for what is needed to provide
    accommodation to equal or exceed present accomodations on the DG.
    Hardware proposal accessibility accommodation will be distributed within the
    FS. What are the needs for accommodation under the IBM scenario?  Dennis and
    Len to provide an issue paper on accessible equipment. 

13. Complete the National Application Migration in 2 yrs. And Year 2000
    Conversion - R/S/A/I  for local applications.  Each R/S/A/I needs to mirror
    the National NAMP efforts for local applications.

14. Job Corps Follow-up in 5 Regions

15. Prepare ID on Microcomputers (PC's).) Delegation of $ 50 K for interim
    period before Round 4. Purchases under this authority are to be from the
    ISAP Contract only. - WO
16. PC Manufacturing  - OSE developing

17. PC Configuration of S/W - talk about it back home (Support)

18. Team Assignments in conjunction with BLM/FS - Due : 5/23/97 Team Leaders to
    do.

19. National IS&T Directors Meeting will be in PHX, jointly  with BLM in the
    Lead for October, 1997.  (Prepare for the Round 5 stuff also at this
    meeting).

20. Video - Biweekly  (5/29/97) and every 2 weeks thereafter. Agenda topics on
    the FS Web site for future meetings.

22. Email Cutover Implementation - Get on with it. 

23. File Structure distribution on the FSWEB - Mickie M.

24. Training Papers distribute on the FS WEB - Mickie M.

25. National Development Process -  Prepare and distribute.

26. FS Forest Supervisor Meeting Input to Dennis Keaton  by 5/23/97.

27. IBM Installers are in training in early June, 1997.

28. Pre-Installation Information will distributed by the OSE - Next Week.

29. Pre-production procedures will be supplied by the OSE - In a couple weeks

30. Provide Remote dial-in instructions, (Exceed Instructions from R3)  to Al
    Flesh - Done 5.22.97

31. Report out on PC- Integration during Video Conference on 5.29.97 - Al Flesh

32. Designer 2000 Group - Ray, Jayne, Jack and Al Flesh

33. Disaster, Contingency, and Risk Assessments Formats - Distribute by
    Jayne       structions forReplication 

34. Instrcutions for Replication  -OSE has written and will distribute.

35. IBM PC's will be configured to provide for remote management -  Keep people 
  
36. Distribute information about " White board like Software information - Tim
    Quinn

37. Provide a copy of the ISAP Contract to all participants.  - Done at Meeting.

38. WO is interested in a proposal for how to do the WCF System life and
    Calculations

39. Distribute copies of TCMCO Process Proposal to the Directors - Jayne -Done

40. Provide a Checklist for  Interagency TC Sharing Process - Dennis

41. FSWEB Site S/W -  Steven Deep is the contact. General Release next week.

42. Steven Deep (sdeep/wo) plans to have NAMP progress/updates on FSWEB
    (Intranet).

43. R/S/A/I need to have a roll call of conversions from DG to IBM Mail

44. R/S/A/I  are headed for doing the needed coordination for the contacts with
    the other agencies.

45. If you haven't sent the "30 mile radius office" information - 
    Do so ASAP to Jayne Handley! (Overdue now).

46. Review the Near Term Network Report and get back the comments to Jayne
    Handley. 

47. Round 4 Ordering Meeting in WO (tenative) will be week of June 16th.


Notes prepared by: