FSH 7709.56b - TRANSPORTATION STRUCTURES HANDBOOK R4 SUPPLEMENT NO. 1 EFFECTIVE 6/88 CHAPTER 7 - STRUCTURAL DESIGN 7.2 - DESIGN CONSIDERATIONS. 7.24 - Modular Portable Bridges. The use of portable modular bridges shall be limited to temporary installations, unless otherwise approved by the Director of Engineering in writing. Prior to each installation of a temporary modular bridge, review and approval of a construction drawing showing details of the installation, shall be obtained from the Regional Bridge Engineer (FSM 7722.03). 7.25 - Used Materials. The use of railroad flatcars, either as permanent or temporary bridges, is expressly prohibited on Forest Development Roads. Permittees shall be denied permission to install railroad flatcar bridges on all roads under Forest Service jurisdiction that are open to public travel (FSM 7722.03). 7.4 - DESIGN CALCULATIONS AND DRAWINGS. All bridge design drawings shall be approved by signature of the Director of Engineering, including design drawings prepared by individuals specifically delegated the responsibility at the Forest level. The above design drawing approval does not apply to previously approved standard drawings, corrugated metal pipe (CMP), structural-plate arches, and pipe arch designs expressly delegated to the Forest Engineer (FSM 7721.04b). The permanent file of bridge design calculations and "as constructed" drawings shall be maintained by the Regional Bridge Engineer. SEE THE PAPER COPY OF THE MASTER SET FOR SECTION 7 - EXHIBIT 01 - 03 7 - Exhibit 01 BRIDGE DESIGN DATA SHEET (Sheet 1 of 2) SEE THE PAPER COPY OF THE MASTER SET FOR SECTION 7 - EXHIBIT 01 - 03 7 - Exhibit 02 BRIDGE DESIGN DATA SHEET (Sheet 2 of 2) SEE THE PAPER COPY OF THE MASTER SET FOR SECTION 7 - EXHIBIT 01 - 03 7 - Exhibit 03 BRIDGE DESIGN REQUEST SUBMITTAL CHECKLIST