Privacy
|
Legal
Back
|
Next
|
Home
|
Cover Page
Technology &
Development Center
Trail Construction and Maintenance Notebook
Table of Contents
Acknowledgments
Introduction
Metrication
The Job of the Trail Crew
Setting Priorities
Trail Planning and Design
Trail Specifications
Light on the Land
Trail Layout
Natural Forces at Work
Dirt, Water, and Gravity
Critter Effects
Trail Corridor
Clearing and Brushing
Removing Trees
Trail Foundation
The Trailbed
Constructing Sidehill Trails
Backslope
Fillslope
Borrow Pits
Tread
Tread Surface
Tread Creep
Slough and Berm
Tread Maintenance
Removing Roots and Stumps
Rock Removal
Surface Water Control
Grade Dips
Waterbars
Maintaining the Drain
Ponding
Trails in Wet Areas
Improving Drainage
Geosynthetics
Turnpikes
Causeways
Puncheon
Subsurface Puncheon
Crossing Streams and Rivers
Shallow Stream Fords
Bridges
Special Structures
Climbing Turns
Switchbacks
Crib Walls and Other Retaining Structures
Steps
Maintaining Special Structures
Signing
Installing Signs
Installing Reassurance Markers
Sign and Marker Maintenance
Naturalizing Abandoned Trails
Check Dams
Revegetation
Tools
Tools for Measuring
Tools for Sawing
Tools for Chopping
Tools for Grubbing
Tools for Digging and Tamping
Tools for Brushing
Tools for Pounding and Hammering
Tools for Lifting and Hauling
Tools for Peeling and Shaping
Tools for Sharpening
Appendix
Metric Conversions
Contact and Ordering Information
Visitor
since August 25, 2004