skip to main page contentUSDA Forest Service logoPrivacy | Legal Table of Contents

Back | Next | Home | Cover Page
Forest Service Technology & Development logo
Technology &
Development Center

Trail Construction and Maintenance Notebook

Trails in Wet Areas (continued)

Subsurface Puncheon

Subsurface puncheon involves construction with the mud sill, stringers, and decking under the surface. This design depends on continual water saturation for preservation (Figure 52). Moisture, air, and wood are needed before wood can rot. Remove any one of these and rot won’t occur. A good rule for reducing rot is to keep the structure continually dry or continually wet. Totally saturated wood will not rot because no air is present. Cover the surface between the curb logs with a layer of gravel, wood chips, or soil to help keep everything wet.

[diagram] Subsurface puncheon
Figure 52—Subsurface puncheon with
covered tread surfacing.

back to main page content

Top

Back | Next

Table of Contents

Cover Page

UsableNet Approved (v. 1.4.1)
Visitor hit counter hit counter hit counter hit counter hit counter hit counter since August 25, 2004